1
GLAST LAT Tracker Tower-B Pre-Ship Review
Luca Latronico INFN-Pisa luca.latronico_at_pi.infn.i
t
2
Tower B Assembly and test highlights
  • 1/3-1/11 2005 (INFN-Pisa)
  • assembly (tray stack, cables, sidewalls,
    alignment, turn-over)
  • test (CPT)
  • 1/17-2/5 2005 (Alenia-Roma)
  • VIB test (1/17-18)
  • New TVAC chamber setup (see NCR/FM/INFN/PI-379)
  • TVAC test (1/29-2/5)
  • 2/8 2005 (INFN-Pisa)
  • Alignment verification
  • 2/10 2005
  • Through customs in Roma airport
  • Full EIDP details at
  • http//glast.pi.infn.it
  • Quality Assurance page
  • EIDP links

3
Tower Alignment data
  • All measurements within stay-clear and in spec
    before and after ENV tests

4
TOWER CG MASS
  • Conclusions
  • Tower well aligned and inside stayclear
  • Stable after Env. Test
  • Mass and CG near estimated values (when used real
    masses)

5
Assembly and components details
  • Relevant issues and related NCRs
  • INFN/PI-220 (tray Bottom 006)
  • M4X6 instead of M4x8
  • Proposed disposition is use as is and close
  • INFN/PI-362 (Tower B)
  • Critical insulation of termination resistor on
    cable 7
  • SLAC will provide all cables with Kapton to
    protect resistors
  • Proposed disposition is use as is and close
  • INFN/PI-371 (Tower B)
  • Critical insulation between tower cables and
    fixing clips
  • Kapton tape was used
  • Proposed dispositions are
  • SLAC will provide all cables with kapton on all
    termination resistors
  • use as is and close
  • INFN/PI-349 (tray heavy 037)
  • GTFE21 back side instabilities
  • Found to be due to bad termination resistor
    (100Ohm) on test cable
  • Proposed disposition is use as is and close
  • INFN/PI-383 (Tower B)

6
Environmental tests highlights
  • VIB test
  • No new channel loss
  • No change in alignment
  • TVAC test
  • New chamber setup
  • Vacuum level slightly below spec (NCR-379-closed)
  • Charge to Alenia to investigate chamber
    capabilities

7
  • total disconnected channels lt 0.25
  • 50 of disconnected channels in 2 layers (Y12,
    X7)
  • X7 with large oscillations vs temperature
  • Y12 responsible for overall channel loss
  • all other layers were very stable

8
Semi-disconnected channels (broken ladder
wire-bonds)
  • 1 layer only (X5 tray H037-Front)
  • 60 bad channels which stabilized during tray
    thermal cycle and tower assembly
  • no further degradation during tower ENV tests
  • see NCR-368

9
Open NCRs related to disconnected/bad channels
  • Bad channels NCRs - proposed disposition is use
    as is and close
  • INFN/PI-368 (tray Heavy 037)
  • Last disposition (MRB 1/12/2005) is use as is for
    tower B build ladders with no encapsulation and
    test on tower 1
  • Disconnected channels NCRs proposed disposition
    is use as is and close
  • INFN/PI-350 (tray MID 051)
  • 2 more channels lost in TVAC
  • INFN/PI-346 (tray MID 043)
  • 24 more channels lost in tray thermal cycle and
    tower TVAC
  • INFN/PI-384 (tray MID 023)
  • Large fluctuation in number of disconnect vs
    temperature
  • INFN/PI-389 (tray Heavy 018)
  • 13 disconnected and 4 noisy found during TVAC test

10
Conclusions
  • Tower B was assembled, tested and shipped to SLAC
    in 2 weeks (2 more weeks were lost for the setup
    of the new Alenia TVAC chamber)
  • No major issue were found in assembly,
    environmental tests, performance verification a
    number of minor issues must be addressed before
    tower1 activities
  • The overall number of bad channels is very low
  • New MCMs with no PA disconnection will reduce
    even more this number and its stability with
    time/temperature
  • New heavy and bottom ladders with no wire-bond
    encapsulation will show their reliability soon
    (tower1 trays data available next Monday right
    before assembly)