Target Lab. Update

Description:

New oven being tested on temporary structures. Successfully heated up to 240 degree C. One of the support parts got burnt. New piece being made in machine shop ... – PowerPoint PPT presentation

Number of Views:20
Avg rating:3.0/5.0
Slides: 15
Provided by: hallaw
Category:
Tags: heated | lab | target | update

less

Transcript and Presenter's Notes

Title: Target Lab. Update


1
Target Lab. Update
Transversity
Xiaohui/Joe/Yi/Chiranjib
Transversity Collaboration Meeting Monday
July 9th 2007
2
Issues
  • Oven related
  • Laser
  • Optics
  • Cell
  • Other
  • Compass

3
Oven/support structure
  • New oven being tested on temporary structures
  • Successfully heated up to 240 degree C
  • One of the support parts got burnt
  • New piece being made in machine shop
  • New support structure ( air inlet/outlet pipe)
    shortly
  • Concern about the present oven weight
  • A completely new oven with lighter material being
    given a thought

Thanks Al /Susan
4
Oven/support structure
Temporary insulation
RTV to block leakage
GeN tube
5
Oven/support structure
Burned portion due to leakage
The support stand could not sustain high temp.
6
Laser
  • 6 single FAPs and 2 duo FAPs
  • All tested/recalibrated
  • One to be sent for repair
  • GOOD NEWS
  • Coherent decided to resume production
  • 3 new FAPs being ordered

7
Optics
  • All 75 m (10 new/6 old) fiber tested
  • All good/ready to be installed in the Hall
  • 5 to 1 combiners( 3)arriving shortly
  • Gaussian Beam Parameters (GBP) measured
  • GBP s are beam waist,beam waist position
    and the divergence
  • essential inputs for our simulation to
    have the effective pumping!!!!
  • Simulation for the three optics lines being done
  • Almost all components for optics lines identified
  • Components to be ordered shortly

Thanks Susan
8
He-3 Cell Update
  • 8 cells filled (4 _at_ WM and 4 _at_ UVA)
  • From UVA
  • Antoinette,Samantha,Stephanie,Boris
  • 3 of them ---3 inch
  • Density 7.5 amg (He-3)
  • Alkali mix ratio gt KRb51
  • 90 Torr/0.11 amg Nitrogen

More update from WM Todd/Joe
9
Other
  • New pick up coils/stands ready
  • All software ( new/modified codes) waiting to be
    tested
  • Density measurements being done on one new cell
    from WM
  • BB field mapping to be done before BB moves to
    HALL C
  • New Vertical coils are here
  • Support structure installed in the new target
    lab.
  • Alignment / mapping to be done shortly

10
From the new target lab.
Vertical coil test structure in the new target
lab.
The height is about 7.8 ft
11
Compass from UKY (Wolfgang et al.)
  • After a lot of struggle , the vertical compass
    now made to work
  • Turns out to be extremely difficult project
  • Resolution verified to be 0.09 degrees
  • Plan to achieve 0.05 degrees
  • Calibration to be done shortly, waiting on a
    component from the machine shop
  • Customization to be done when it arrives _at_ Jlab.

12
The compass
To the comp.
Air inlet
Magnet
Rotating disc
13
so called PLANS
  • Clean the lab..start laser alignment.depending
    upon the oven and support structures,few more
    tests on the oven.start pumping.the polarimetry
    tests follow
  • Density measurements to be carried on as new
    cells arrive on regular basis
  • Even though due to the oven structure issues we
    are 3 weeks behind our schedule, we plan to
    finish up all the required tests etc. by
    Oct./Nov. to meet the Jan 1st deadline

14
Acknowledgment
Many thanks to Wolfgang,Jian Ping,Todd,
Jaideep,Aidan,Ameya
Next time we promise to show some results with
some fancy plots !!
Thanks !!