Title: ASCOPE NATURAL GAS for VEHICLE NGV TASK FORCE
1ASCOPE NATURAL GAS for VEHICLE (NGV)TASK FORCE
REPORT OF ASCOPE NGV TASK FORCE (ANTF)
for the 10th ASCOPE TECHNOLOGY SERVICES
COMMITTEE (TSC) MEETING May 13th,
2004) by MOHD GHAZALI DAUD CHAIRMAN, ANTF
-
- May 13th, 2004
- PAN PACIFIC HOTEL
- SINGAPORE
2OBJECTIVE OF PRESENTATION
- 1) TO UPDATE THE PROGRESS OF ACTIVITIES
CARRIED OUT BY ANTF, AND -
- 2) TO RECOMMEND THE IMPLEMENTATION OF THE ASEAN
RECOMMENDED PRACTICE (ARP) for NGV VEHICLES
REFUELING STATION.
3Presentation Outline
1
- BACKGROUND
-
- PROGRESS
- OVERVIEW OF BOTH ARPs
- RECOMMENDATION WAY FORWARD
2
3
4
41
1
Background
Background
5BACKGROUND
- ANTF WAS FORMED ON 25 SEPTEMBER 2002 WITH THE
OBJECTIVE TO ENHANCE PROMOTE NGV BUSINESS
EXPANSION THROUGH THE HARMONISATION
STANDARDISATION OF NGV CODES, PRACTICES AND
REGULATIONS IN THE ASEAN REGION. NGV CODES
PRACTICES ON REFUELING STATIONS VEHICLES WERE
IDENTIFIED TO BE HARMONISED - TWO EXPERT WORKING GROUPS (EWG) WERE FORMED TO
LOOK INTO THE HARMONISATION OF THESE TWO
AREAS.
6ANTF EWGs OPERATING STRUCTURE
ASCOPE NGV TASK FORCE (ANTF) CHAIRMAN PETRONAS,
MALAYSIA
EXPERT WORKING GROUP (VEHICLES) EWG CHAIRMAN
PTT, PLC, THAILAND ALT CHAIRMAN PNOC,PHILIPPINES
EXPERT WORKING GROUP (REFUELING STATION) EWG
CHAIRMAN PETRONAS, MALAYSIA ALT CHAIRMAN SPC,
SINGAPORE
72
2
Progress
Progress
8WORK PLAN STATUS WAY FORWARD
C Completed
93
3
Overview of both ARPs
Overview of both ARPs
10OVERVIEW OF ARP for NGV VEHICLES
- ARP for NGV VEHICLESPart I Components
- - RECOMMENDED PRACTICE
- - GENERAL
- - NGV CYLINDERS
- - NGV FILLING RECEPTACLE
- - PRESSURE REGULATOR
- - MASTER SHUT OFF VALVE
- - GAS SOLENOID VALVE
- - PETROL SOLENOID VALVE
- - HIGH PRESSURE PIPING / TUBING / FITTING
- - ENGINE TIMING MODIFIER / ENGINE MANAGEMENT
SYSTEM - - NGV MIXER / INJECTOR
- - FUEL SELECTOR SWITCH
- - FUEL INDICATOR / GAUGE
- Part 2 Installations
- - RECOMMENDED PRACTICE
- - GENERAL
- - CYLINDER CLAMPS
- - IDENTIFICATION
11OVERVIEW OF ARP for NGV REFUELING STATIONS
- B. ARP for NGV REFUELING STATIONS
- - RECOMMENDED PRACTICE
- - REFUELING CONNECTOR
- - BREAKAWAY COUPLING
- - REFUELING HOSE ELECTRICAL CONDUCTIVITY
- - EMERGENCY SHUTDOWN DEVICE (ESD)
- - PRESSURE RELIEF DEVICES (PRD)
- - VENTING POINT
- - GAS DETECTOR
- - SAFETY DISTANCES
- - FIREMEN SAFETY SWITCH
- - MASTER SHUT OFF VALVE
- - FLEXIBLE HOSE ASSEMBLY
- - RIGID PIPING
- - SAFETY MANAGEMENT SYSTEM (STATIONS CNG
TRANSPORTING VEHICLES) - - FIRE PROTECTION
- - OPERATION SAFETY FOR CNG TRAILERS
- - HSE OPERATION AUDIT / INSPECTION OF CNG
STATIONS
124
4
Recommendation Way Forward
Recommendation Way Forward
13RECOMMENDATION
- TO IMPLEMENT THE ASEAN RECOMMENDED PRACTICE (ARP)
for NGV VEHICLES REFUELING STATION BY MEMBER
COUNTRIES
14 WAY FORWARD
- TO MONITOR THE IMPLEMENTATION PROGRESS,
- TO REVIEW THE ARPs IN TWO YEARS TIME.
15Thank You
Thank You