CHEMICALLY ENHANCED PRODUCTION - PowerPoint PPT Presentation

1 / 14
About This Presentation
Title:

CHEMICALLY ENHANCED PRODUCTION

Description:

MANAGING WAXY CONDENSATE' PRSS Technology Forum. Kuantan, Pahang. 15 ... Waxy condensate suspected as a contributing factor to process and operational upsets. ... – PowerPoint PPT presentation

Number of Views:29
Avg rating:3.0/5.0
Slides: 15
Provided by: KHA117
Category:

less

Transcript and Presenter's Notes

Title: CHEMICALLY ENHANCED PRODUCTION


1
CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE PRSS Technology Forum Kuantan,
Pahang 15 - 17 September 2002 Khairul Nizam M
Zaini (Petronas Carigali Sdn Bhd) A Rahman
Yunus (Champion Technologies Inc.)
2
CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
3
CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
4
CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
5
CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
  • INTRODUCTION
  • Waxy condensate suspected as a contributing
    factor to process and operational upsets.
  • Suspected wells were shut-in or flow at
    recommended choke size.
  • Investigative study was conducted.
  • Objectives of study
  • Identify the source extent of the problem.
  • Formulate an appropriate solution to overcome the
    problem.

6
CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
  • INVESTIGATIVE STUDY
  • Activities
  • In-situ measurements.
  • Process profiling.
  • Laboratory analysis.
  • Results
  • Confirmed that wax will form at current operating
    temperature.
  • Identified several wells as potential
    contributors.
  • Short listed two wells.

7
CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
  • ACTIONS TAKEN
  • Conducted a pilot test.
  • Identified a suitable chemical.
  • Managed to reduce the pour point at an acceptable
    level.
  • Determined the optimum dosage of PPD treatment.

8
CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
  • RECOMMENDATIONS / IMPLEMENTATION
  • Bean up the suspected two wells to their
    potential.
  • Continue PPD injection at the two wells at
    optimum dosage.
  • Carry out monthly visit for chemical injection
    optimization.

9
CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
WELL A
Pre Treatment
Post Treatment
10
CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
WELL B
Pre Treatment
Post Treatment
11
CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
12
CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
13
CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
14
THANK YOU
Write a Comment
User Comments (0)
About PowerShow.com