Title: CHEMICALLY ENHANCED PRODUCTION
1CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE PRSS Technology Forum Kuantan,
Pahang 15 - 17 September 2002 Khairul Nizam M
Zaini (Petronas Carigali Sdn Bhd) A Rahman
Yunus (Champion Technologies Inc.)
2CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
3CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
4CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
5CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
- INTRODUCTION
- Waxy condensate suspected as a contributing
factor to process and operational upsets. - Suspected wells were shut-in or flow at
recommended choke size. - Investigative study was conducted.
- Objectives of study
- Identify the source extent of the problem.
- Formulate an appropriate solution to overcome the
problem.
6CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
- INVESTIGATIVE STUDY
- Activities
- In-situ measurements.
- Process profiling.
- Laboratory analysis.
- Results
- Confirmed that wax will form at current operating
temperature. - Identified several wells as potential
contributors. - Short listed two wells.
7CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
- ACTIONS TAKEN
- Conducted a pilot test.
- Identified a suitable chemical.
- Managed to reduce the pour point at an acceptable
level. - Determined the optimum dosage of PPD treatment.
8CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
- RECOMMENDATIONS / IMPLEMENTATION
- Bean up the suspected two wells to their
potential. - Continue PPD injection at the two wells at
optimum dosage. - Carry out monthly visit for chemical injection
optimization.
9CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
WELL A
Pre Treatment
Post Treatment
10CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
WELL B
Pre Treatment
Post Treatment
11CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
12CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
13CHEMICALLY ENHANCED PRODUCTION - MANAGING WAXY
CONDENSATE
14THANK YOU