Tyumen region - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

Tyumen region

Description:

... between Trans-Siberian Railroad and Federal motorway Tyumen ... Water supply: underground water deposit is situated in 6 km far to the north (10000 m /day) ... – PowerPoint PPT presentation

Number of Views:35
Avg rating:3.0/5.0
Slides: 18
Provided by: tyumen
Category:

less

Transcript and Presenter's Notes

Title: Tyumen region


1
Tyumen region is the right choice for
investments!
Industrial purpose sites of Tyumen region
www.tyumen-region.ru
2
Tobolsk
Clusters of petrochemical and electricity
industries, logistics, service and trade
Clusters of food processing industry and logistics
Elan
Clusters of machine building, textile and
electricity industries, logistics, service and
trade
Tyumen
Borky, Kaskara
Clusters of food processing and machine building
industries, service
Bogandinsky
Clusters of construction materials, woodworking
and machine building industries
Zavodoukovsk
Clusters of agriculture, food processing and
construction materials industries
3
Industrial purpose site ?1
Tyumen
Administrators of site Vladimir Katuntsev,
KatuncevVA_at_invest.tmn-obl.ru, Phone 007 3452 29
65 13
3
4
Industrial purpose site ?2
Tyumen
  • Field area 8 hectares
  • Corps area 20 129,4 m²
  • Manufacturing area 16 271,8 m²
  • Ceiling height 13,90 m.
  • There are two frame cranes with lifting ability
    up to 5 Tons in corps
  • Railway run into the corps
  • Central heating
  • Electric power 6 MW.
  • Water supply over 10 000 liters/day
  • Storm and excremental drain
  • Gas-supply connection is possible (nearest
    gas-distributing point 500 meters)

Administrators of site Vladimir Katuntsev,
KatuncevVA_at_invest.tmn-obl.ru, Phone 007 3452 29
65 13
4
5
Tyumen
Industrial purpose site ?3
  • Field area 4,5 hectares
  • Corps area 20 513,3 m²
  • Manufacturing area 14 757,5 m²
  • Ceiling height 8,3 m
  • Room equipped with frame cranes with lifting
    ability up to 5 Tons
  • Dead-end track
  • Central heating
  • Electric power 5 MW
  • Water supply over 10 000 liters/day
  • Storm and excremental drain
  • Gas-supply connection is possible (nearest
    gas-distributing point 500 meters)
  • Area of neighboring uncompleted building 3439 m2,
    ceiling height 7 m

Administrators of site Vladimir Katuntsev,
KatuncevVA_at_invest.tmn-obl.ru, Phone 007 3452 29
65 13
5
6
Tyumen
Industrial purpose site ?4
  • Field area 4,5 hectares
  • Corps area 8 709,35 m²
  • Manufacturing area 7970,9 m²
  • Ceiling height 8,55 m
  • Room equipped with frame cranes with lifting
    ability up to 2 Tons
  • Central heating
  • Electric power 2,5 MW
  • Water supply over 10 000 liters/day
  • Storm and excremental drain
  • Gas-supply connection is possible (nearest
    gas-distributing point 500 meters)

Administrators of site Vladimir Katuntsev,
KatuncevVA_at_invest.tmn-obl.ru, Phone 007 3452 29
65 13
6
7
Industrial purpose site ?5
Bogandinsky
Administrators of site Vladimir Katuntsev,
KatuncevVA_at_invest.tmn-obl.ru, Phone 007 3452 29
65 13 Eugeny Suharev, invest_at_atmr.ru, phone 007
3452 30 36 33
7
8
Bogandinsky
Industrial purpose site ?5
  • Storm and excremental drain construction of
    main drain, sewage pumping station, sewage
    treatment plant with capacity of 4000 m³/day
  • Electric power construction of electric power
    substation 110/10 kV with the capacity of 40 MW
  • Gas supply mounting of two gas distribution
    substation with total capacity of 20000 m³/hour
  • construction of approach motorways
  • construction of railway track
  • Water supply will be provided by drilling wells.
  • The general plan of development was
    created.

9
Industrial purpose site ? 6
Kaskara
  • Location 20 km far from Tyumen
  • Field area 10 hectares
  • Transport infrastructure
  • rail-way goes near the site
  • Electric power electric power substation is
    located near the site
  • Storm and excremental drain.

Administrators of site Vladimir Katuntsev,
KatuncevVA_at_invest.tmn-obl.ru, Phone 007 3452 29
65 13 Eugeny Suharev, invest_at_atmr.ru, phone 007
3452 30 36 33
9
10
Industrial purpose site ?7
Elan
  • Location 25 km far from Tyumen
  • Field area 97 hectares
  • Transport infrastructure the site is situated
    between Trans-Siberian Railroad and Federal
    motorway Tyumen- Yekaterinburg
  • Water supply underground water deposit is
    situated in 6 km far to the north (10000 m³/day)
  • Power and Gas supply points of connection are
    situated in 1 700 m far to the south

Administrators of site Vladimir Katuntsev,
KatuncevVA_at_invest.tmn-obl.ru, Phone 007 3452 29
65 13 Eugeny Suharev, invest_at_atmr.ru, phone 007
3452 30 36 33
10
11
Industrial purpose site ?8
Borky
  • Location 30 km far from Tyumen
  • Field area 600 hectares
  • Topography Flat grassland
  • Category agricultural land
  • Ownership private/municipal
  • Power supply High voltage lines (500 kV and 10
    kV) borders the site. 2 km far electric power
    substations with supply of 110 kV are situated
    (in Borky and Kaskara villages)
  • Gas supply gas-main pipeline goes through the
    site
  • Water supply the ability of drilling well
    exists
  • Motorways the site is situated on Federal
    motorway Tyumen Khanty-Mansiysk
  • Railroad 7 km far Tyumen Tobolsk railroad is
    situated

Administrators of site Vladimir Katuntsev,
KatuncevVA_at_invest.tmn-obl.ru, Phone 007 3452 29
65 13
11
12
Zavodoukovsk
Industrial purpose site ?9
Location 130 km far from Tyumen Field area 20
hectares Category agricultural land Power
supply point of connection in 1,3 km far Gas
supply point of connection in 1,9 km far Water
supply well should drilled (drilling depth
120 m, well capacity 25 m³/day)
Administrators of site Vladimir Katuntsev,
KatuncevVA_at_invest.tmn-obl.ru, Phone 007 3452 29
65 13 Tamara Ponomareva, admr_at_mail.ru Phone 007
34542 2 25 59
12
13
Zavodoukovsk
Industrial purpose site ?10
Administrators of site Vladimir Katuntsev,
KatuncevVA_at_invest.tmn-obl.ru, Phone 007 3452 29
65 13 Tamara Ponomareva, admr_at_mail.ru Phone 007
34542 2 25 59
Location 130 km far from Tyumen Field area 20
hectares (can be increased up to 30 Ha) Power
supply 5 MW, point of connection in 1,3 km
far Gas supply point of connection in 2,5 km
far Water supply point of connection in 350 m
far.
13
14
Industrial purpose site ?11
Zavodoukovsk
  • Field area 7,2 hectares
  • Approach lines dead-end track and motorway
  • Federal motorway in 1,2 km far
  • Power supply 1,3 MW
  • Boiler house exists (gas)
  • Water supply 100 000 m3/month).

Railroad
Motorway
Administrators of site Vladimir Katuntsev,
KatuncevVA_at_invest.tmn-obl.ru Phone 007 3452 29
65 13
14
15
Tobolsk
Industrial purpose site ?12
Field area 900 hectares Utilities Power supply
line (10kV), heating, water and gas supply lines
are situated close to the site
Administrators of site Vladimir Katuntsev,
KatuncevVA_at_invest.tmn-obl.ru Phone 007 3452 29
65 13
16
Tobolsk
Industrial purpose site ?13
Field area67 hectares Utilities Power
(110kV), gas and heating supply lines
exist Point of connection to water supply system
is situated in 1 km far Approach lines. In the
north-west part of the site road that linked to
Federal motorway exist (asphalt coat 7 m wide).
In total there are 5 industrial purpose sites in
Tobolsk with common field area over 1000 hectares
Administrators of site Vladimir Katuntsev,
KatuncevVA_at_invest.tmn-obl.ru Phone 007 3452 29
65 13
17
Our development definesYour success!
Department for Investment Policy and State
Support of Business 007 (3452)
29-63-17 Investment Agency of Tyumen region 007
(3452) 45-35-74 www.tyumen-region.ru
Write a Comment
User Comments (0)
About PowerShow.com