Investment project of Ferghana plant of chemical fiber - PowerPoint PPT Presentation

1 / 11
About This Presentation
Title:

Investment project of Ferghana plant of chemical fiber

Description:

Polyamide-6 chips. Volume of annual turnover (in USD) Price per unit (in USD) ... Purpose of the project: Renew polyamide-6 and tire cord production lines with ... – PowerPoint PPT presentation

Number of Views:36
Avg rating:3.0/5.0
Slides: 12
Provided by: uzMofc
Category:

less

Transcript and Presenter's Notes

Title: Investment project of Ferghana plant of chemical fiber


1
Investment project of Ferghana plant of chemical
fiber
Olim F. Maksudov Director General
2
General information about the company
Date of establishment of the enterprise 1969
(polyamide-6 and tire cord production line -
1998)
Type of ownership Governmental enterprise
Number of personnel 254 persons
Total production areas 26739 square meters
3
Information about the production
Type of production polyamide-6 chips, tire cord
fabric
Production capacities
Name of a production Annual capacity (tons) Price per unit (in USD) Volume of annual turnover (in USD)
Polyamide-6 chips 7000 2900 10 150 000
Tire cord fabric 3480 3200 11 136 000
4
Potential of the company
Buildings and Constructions
Name of the object Measure unit Total area
Total area of the enterprise m² 103752
Including those covered with production areas m² 26739
Area of roofed storages m² 1512
Area of open storages - -
Subsidiary productions (objects of engineering provision) m² 6957
5
Potential of the company
Engineering Communications
Name of the resource Measure unit Cost per unit (in soums) Annual need for the creation of production
Heat water Cubic m. 14190 15960
Home cold water Cubic m. 86.4 108000
Water for technical needs Cubic m. 86.4 132000
Natural gas Cubic m. 41.4 -
Electricity Kilowatt 28.2 27340000
Sewerage Cubic m. 55.4 111600
6
Potential of the company
Existing equipment
List of equipment Country of origin Year of production
Chemical sector Germany 1996
Spinning sector Germany 1996
Textile sector Germany 1996
7
Supply with raw materials
Raw materials (main raw materials, used in the production process) Price per unit (in USD) Quantity needed (in tons)
Caprolactam 2200/ton 7700
Oil ingredient 3400/ton 100
Thermo stabilizer 45000/ton 35
Name of raw material Suppliers
Caprolactam Russian Federation
Oil ingredient Germany
Thermo stabilizer Germany
8
Location
Distance from Kilometers
The administrative center 5
Rail road Own railway track
Automobile road and encircling highway 0.5
9
Information on the proposed project
Name of the project renewal of Polyamide-6
production line
Purpose of the project Renew polyamide-6 and
tire cord production lines with existing modern
equipment, creating new job places for manpower
of the region, increasing export potential of the
enterprise
Type of new ownership 2 variants of
cooperation - Selling a share of the enterprise
to a foreign investor - Working on tolling basis
without changing the owner
Total cost of the project 3.4 million
USD Including - Spare parts and construction
works 0.2ml USD - Raw materials 3.2 million
USD
10
Information on the proposed project
Works to be implemented by foreign party supply
with raw materials and components, financial
supply for equipment repair works, export
products to foreign markets
Privileges provided to the newly created joint
venture guarantees and privileges are provided
to enterprises with foreign investments by the
legislation of the Republic of Uzbekistan for
foreign investments and special sectors of economy
Geography of the market Russian Federation,
Kazakhstan, Turkey, China, India, South-Eastern
Asia
11
THANK YOU FOR YOUR ATTENTION! FERGANA PLANT OF
CHEMICAL FIBER Address 1 Khimikov street,
Ferghana, Uzbekistan Director General Mr. Olim
F. Maksudov Telephone (998732) 22-37-22 Fax
(998732) 22-09-64 Contact person Mr.
Valeriy Zuy
Write a Comment
User Comments (0)
About PowerShow.com