Half TripTM System for Offshore Completions - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

Half TripTM System for Offshore Completions

Description:

Why the Half Trip System? Proven Efficient and Economical System for Single ... half trip on tubing or drill pipe. Reliable. More efficient existing technology ... – PowerPoint PPT presentation

Number of Views:24
Avg rating:3.0/5.0
Slides: 14
Provided by: c4communic
Category:

less

Transcript and Presenter's Notes

Title: Half TripTM System for Offshore Completions


1
(No Transcript)
2
Half TripTM System for Offshore Completions
  • BJ Services Company

3
Why the Half Trip System?
  • Proven Efficient and Economical System for Single
    Completions

4
Half Trip System Description
  • Designed to reduce the number of tubing or drill
    pipe trips, and wireline trips during the gravel
    packing/fracturing completion process
  • Allows for
  • completion of longer zones
  • access into tighter and more deviated well bores

5
Half Trip System Features
  • Can be cycled to three different positions
  • Squeeze/Pump Job
  • Reverse
  • Production
  • Run on pipe
  • Return to the surface is not needed since the
    hydraulic setting tool remains downhole

6
Half Trip System Benefits
  • Saves time
  • half trip on tubing or drill pipe
  • Reliable
  • More efficient existing technology
  • Mechanically simple
  • Ability to reverse out
  • prevents the need for coiled tubing

7
Half Trip System Test
  • Shear Ring Disk to allow full I.D. for
    production, prior to rupturing

8
Half Trip System Test
  • Shear Ring Disk rupture test fixture

9
Half Trip System Test
  • Shear Ring Disk after rupture (tests performed as
    high as 12,000 psi depending on desired rupture
    pressure)

10
(No Transcript)
11
Half Trip System Summary
  • The Half Trip System
  • Saves time
  • Reliable
  • Ability to reverse out
  • Move immediately to production

12
Thank You!Questions?
13
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com