Title: TRD Collaboration Meeting GSI Clemens Adler


1
TRD Chamber production issues
  • General Issues, Planning and Hd Status

2
Anode wire quality
Dubna wire TW002
TW 002x2
3
Anode wire quality cont.
TW 003 before Meteor (Dubna)
TW 003 after Meteor
4
Anode wire Quality cont. 2
Bukarest wire Black spots visible by eye More
information to come after looking at different
rolls
5
Anode Wire Quality Summary
  • Status
  • 3 bad roll in Bukarest (out of 3), dust on
    Meteor.
  • 2 bad rolls in Dubna (out of 14? How many were
    examined), dust on Meteor.
  • Heidelberg Wire OK, sometimes dust on Meteor (3
    rolls so far).
  • GSI no Problem.
  • Solutions
  • Better wire? Is it available, price?
  • Look at every winding feasible? (REM not easily
    accessible at Hd and Dubna.
  • Can bad wire be identified under the light
    microscope?

6
HV cable
  • Manufacturer Low noise is not a feature of this
    wire
  • 300 m delivered in December
  • production date 2002
  • -gt Perfect (few nA starting at 6kV)
  • 700 m delivered in January
  • production date 2004
  • OK few nA starting at 3-4kV
  • New wire will be distributed to Bukarest and
    Dubna in next delivery.
  • Currently every wire is tested at Dubna/Bukarest
  • no showstopper

7
Problem Chamber Hd
  • As reported at last Status meeting
  • 1 Chamber displayed high anode currents after
    glueing Panel starting at 1100V (was OK
    previously) independant of anode segment used.
  • After 1 month in the corner chamber is OK ?!?
  • Not understood so far.

8
L-profile bending
  • Dubna had some bent L-profiles, with residual
    bending after gluing frame.
  • Check in Heidelberg some profiles bent more than
    acceptable (250um at each side).
  • Investigation currently under way probably only
    relevant for the first series.
  • Please check before gluing a frame

9
Gas connectors
  • Problem 1
  • Hole in front profile can be too
  • small (due to wear of tools)
  • should be larger than 19,00mm
  • Problem 2
  • Gas connectors (glued into front profiles) are
    very sensitive parts
  • No glue residuals, no scratches allowed.
  • For gas tightness grease is probably needed.
  • ToDo chamber connection test (gas tightness of 2
    or 3 Chambers in a row)

10
Anode wire breaking
  • Dubna and Heidelberg use Olegs solution (see
    picture).
  • Dubna experiences breaking even after fixing
    chambers to table
  • Heidelberg has problems with copper strip not
    gluing to wire ledge.

Dubna solution to prevent removal of copper strip
during soldering
11
Material Database
  • Still very little use, but it is an undebatable
    requirement!!!
  • Maybe leave out unecessary steps during shipping
    (e.g. Padplanes should be sent from Frankfurt to
    Dubna etc.)
  • Serial numbers of Radiator/Chamber, Panel,
    Padplanes, wire rolls have to be noted and kept
    (also for DCDB)

12
Schedule
  • Layer 6 scenario
  • (decision this weekend)
  • finish L6C0 material and include in next Dubna
    transport (in 3 weeks)
  • -gt1st Supermodule Chambers May 1st (transport
    from Dubna/Bukarest)
  • decision in 3 weeks
  • additional transport to Dubna,
  • -gt1st Supermodule Ch
  • July 1st (transport time)
  • Layer 0 scenario
  • (decision this weekend)
  • L0C0,L0C1 Material at Hd May 1st
  • L0C0 material in Dubna
  • June 15th
  • -gt1st Supermodule Chambers
  • July 1st (transport)
  • (unefficient, better have a transport in
    Sept./Okt.?)
  • (Assuming no Quality Problems)

13
Dubna Chamber Transport Dates
Supermodule assembly August
Supermodule assembly November
14
Bukarest Schedule
  • Unclear (to me)
  • Climatic constraints?
  • Customs requirements? (fixed export dates)
  • Is a large transport more efficient?

15
Estimated SM production dates(just from Chamber
point of view)
Transport delays not taken into acount All
estimates based on 1 Chamber/week average
production rate Suggest to use as a base plan
until more detailed rate info is available
16
Heidelberg Status
  • 9xL1C1 finished
  • 2xL1C1 being wired
  • 3xL1C0
  • 3xL2C0
  • 1xL1C0 not usable? (Badly glued Padplane maybe
    repair possible)