Connection of - PowerPoint PPT Presentation

1 / 18
About This Presentation
Title:

Connection of

Description:

Connection of. Exporting Generation. To ESB Networks. Michael Regan. ESB Network brief overview ... GPA Non GPA Interactions. NC5 form necessary ... – PowerPoint PPT presentation

Number of Views:23
Avg rating:3.0/5.0
Slides: 19
Provided by: Brenn8
Category:
Tags: connection | regan

less

Transcript and Presenter's Notes

Title: Connection of


1
Connection of Exporting Generation To ESB
Networks Michael Regan
2
  • ESB Network brief overview
  • GPA Non GPA Interactions
  • NC5 form necessary requirements
  • Load v Generation

3
(No Transcript)
4
(No Transcript)
5
Distribution system
110kV
38kV
NO
38kV
38kV
MV
MV
G
LV
LV
6
The Application Process NC5 Form
7
GPA Non GPA
640MW connected DSO 958MW Contracted
DSO 4,888MW in Gate 3 Gate 4 Queue DSO 78MW
Offers Contracted 88MW Biogas CHP under
review 100MW Thermal under review 14MW LFG under
review 2MW Wind Hydro under review Wave Tidal
under review
GPA
Non GPA
8
To be processed outside of GPA must meet the
following criteria
  • Non interacting
  • Equal or less than 0.5MW
  • Request to be processed outside of GPA
  • Greater than 0.5MW but satisfy benefit which is
    in the public interest

Coordinates MEC Generator type Supporting Letter
9
Interactions
110kV
38kV
NO
38kV
38kV
MV
MV
G
G
LV
LV
10
Technical Study
  • Volt rise
  • Conductor capacity
  • Transformer capacity
  • Conductor losses
  • Loss of feeder

Coordinates MEC MIC Generator type
11
Energistation Operation of network
  • Protection settings of ESB equipment
  • Installation of additional protection equipment
  • Constraints Eirgrid
  • G10 protection

SLD Short Circuit levels Generator type Metering
12
Connection Agreement
  • Legal Document
  • Contract between ESB and Company
  • One and only one connection point - MPRN
  • Capacity bond 90 of MEC must be attained

Owners Signature Landowners signature Company
details Contact details
13
Requirements for export of electricity
Distribution Code conditions MV connections
require DSO control ? Nulec Recloser G10
compliance Metering read on quarterly hour basis
via dedicated phone
14
Load V Generation
15
Voltage rise And Volt Drop
On MV Network Volt Drop is 5 Volt rise is 1
16
The percentage rise of 1 or 1.5 takes into
account the resolution of the tap changer which
is 1. (for 20kV the resultant is approx
21.41.011.01
17
Gen
Load
Volt Rise 2.78 outside standard of 1
Volt Drop 2.78 Within standard of 5
Both Load Generation 6MW 100sca Line
18
(No Transcript)