Title: Storm Water Circuit Rider Program


1
Storm Water Circuit Rider Program
  • Kelly J Waldo
  • HGAC Workshop
  • April 16, 2003

2
Objectives
  • To provide technical assistance to Lower
    Galveston Bay entities in Harris, Galveston,
    Liberty, Brazoria, and Chambers Counties.
  • To assist entities with the development and
    implementation of Storm Water Management Plans.

3
Storm Water Circuit Rider
  • Funded by a grant from the TCEQ
  • Galveston Bay Estuary Program is the contract
    manager
  • 20-Year Galveston Bay Plan

4
Circuit Rider Duties
  • Identify Existing Programs
  • Define Team Leaders
  • Determine Implementation Schedule
  • Funding Opportunities
  • Assist with Implementation
  • Assist with Annual Reports
  • Listserv Capabilities

5
6 Minimum Control Measures
6
Public Education Outreach
  • Utility Bill Inserts
  • Classroom Education on Storm Water
  • Pollution Prevention for Businesses
  • Using the Media
  • Proper Disposal of Household Hazardous Wastes

7
Public Involvement/Participation
  • Storm Drain Stenciling
  • Stream Cleanup and Monitoring
  • Wetland Plantings
  • Stakeholder Meetings
  • Attitude Surveys
  • Adopt-a-Stream Programs

8
Illicit Discharge Detection and Elimination
  • Storm Sewer Map
  • Ordinance
  • Detect/Locate Illicit Discharges
  • Trace the Source
  • Removal of the Discharge
  • Appropriate Enforcement Procedures and Actions

9
Pollution Prevention/Good Housekeeping for
Municipal Operations
  • Training Program
  • Maintenance Activities
  • Maintenance Schedules
  • Internal Reporting
  • Inspection Procedures
  • Disposal of Pollutants

10
Construction Site Storm Water Runoff Control
  • Implement Erosion Controls
  • Control Wastes
  • Site Plan Review
  • Receipt and Consideration of Information from the
    Public
  • Site Inspection and Enforcement

11
Post Construction Storm Water Management
  • New Development and Redevelopment
  • Structural and Non-structural BMPs
  • Ordinance
  • Ensure Long-term Operation and Maintenance of
    BMPs
  • Maintenance Agreements

12
Municipal Construction Activities
  • The development of Minimum Control Measure for
    municipal construction activities is an optional
    measure and is an alternative to the MS4 seeking
    coverage under TPDES permit TXR150000.

13
General Requirements
  • Notice of Intent
  • Program
  • 100 Fee
  • 5-year Permit Cycle
  • Annual Reports

14
Partnerships
  • Share Resources
  • Work Groups
  • Regional Public Education and Participation
    Activities
  • Share Expenses
  • Share Printed Materials
  • Listserv

15
  • Kelly J Waldo
  • Storm Water Circuit Rider
  • Texas Cooperative Extension
  • KJWaldo_at_tamu.edu
  • 281.333.3962
  • www.urban-nature.org