Title: MES Implementation at Impala Platinum


1
MES Implementation at Impala Platinum
  • Merinda Westcott

2
Impala Platinum
Impala Platinum
Impala Refineries
3
Company History
  • 1924 Hans Merensky discovered platinum in ore
    sample
  • 1925 Prospecting shafts were sunk in area
  • 1967 Impala Platinum Holdings LTD was
    established
  • 1969 Production started at 100 000 ounces
    platinum per year

4
Impala Platinum Information
  • Operations consist of
  • Mining Rustenburg
  • Mineral Processes Rustenburg
  • Base metals refinery - Johannesburg
  • Precious metals refinery Johannesburg
  • Currently employs 28 000 people
  • Second largest platinum producer in the world
  • 13 Operational shafts producing 16.5 million tons
    per year
  • Implats production 1.9 million ounces of platinum
    per year

5
(No Transcript)
6
Process Flow Mineral Processes
Concentrator
Ore from Shafts
Tails to Tailings Dam
Milling
Flotation
Smelter
Off Gas Treatment
Dryers
Smelting
Converting
Final Product to Refinery
7
Milling
8
Process Flow Mineral Processes
Concentrator
Ore from Shafts
Tails to Tailings Dam
Milling
Flotation
Smelter
Off Gas Treatment
Dryers
Smelting
Converting
Final Product to Refinery
9
Flotation
10
Process Flow Mineral Processes
Concentrator
Ore from Shafts
Tails to Tailings Dam
Milling
Flotation
Smelter
Off Gas Treatment
Dryers
Smelting
Converting
Final Product to Refinery
11
Dryers
12
Process Flow Mineral Processes
Concentrator
Ore from Shafts
Tails to Tailings Dam
Milling
Flotation
Smelter
Off Gas Treatment
Dryers
Smelting
Converting
Final Product to Refinery
13
Smelting
14
Process Flow Mineral Processes
Concentrator
Ore from Shafts
Tails to Tailings Dam
Milling
Flotation
Smelter
Off Gas Treatment
Dryers
Smelting
Converting
Final Product to Refinery
15
Converting
16
Process Flow Mineral Processes
Concentrator
Ore from Shafts
Tails to Tailings Dam
Milling
Flotation
Smelter
Off Gas Treatment
Dryers
Smelting
Converting
Final Product to Refinery
17
Gas Treatment
18
Historical Data Management
  • Multiple systems and reports
  • Manual entry of data available electronically
  • Duplication of data in multiple excel
    spreadsheets
  • Excel used for all performance calculations and
    reporting
  • Data inaccessible and insecure
  • No audit trail

Management Report
Performance Calculations
19
MES Solution
  • Central repository for all data
  • Calculations performed in centrally controlled
    environment
  • Interface to all data sources
  • All reporting from one data source
  • One user interface to access data
  • Interface to SAP

Reports
SAP
Trends
Graphics
Performance Calculations
Data Historian
Plant Data
Rail Transport
Manual Data
Lab Data
20
Project Detail
  • Interfacing
  • Historian
  • Performance calculations
  • Downtime monitoring application
  • User interface

21
(No Transcript)
22
Interfacing Plant Control Systems
  • Three CIMIO servers used to retrieve plant data
  • Use Aspentechs CIMIO for OPC interface
  • 44 841 tags from 39 PLCs at 10 sec interval
  • Initially used remote OPC servers
  • TopServer OPC Server installed on CIMIO servers
  • Store Forward implemented on CIMIO servers

23
Interfacing Rail Transport
  • Manages downloading and recording of ore
    movements at Mineral Processes
  • Captures transactional data in Access Database
  • Uses ODBC connection for data transfer

24
Interfacing -LIMS
  • Plant samples analysed for PGM content
  • Create Staging Table in LIMS
  • ODBC connection to staging table
  • Use SQL and mapping table to insert values into
    records

25
(No Transcript)
26
Interfacing - Excel
  • Download business plans

27
Interfacing - SAP
  • Use Operations Manager Integration Infrastructure
    (OMII)
  • Maintenance management
  • Notifications of equipment operating outside
    limits
  • Custom RFC
  • Running hours of critical equipment
  • Standard RFC MEASUREM_DOCUM_RFC_SINGLE_001
  • Monthly key performance data
  • Uploading of monthly plant performance data to
    SAP
  • Standard RFC ZPM_ACTIVITY_CREATE

28
Business Works Flow
29
Project Detail
  • Interfacing
  • Historian

30
Historian
  • Replace existing 3 Wonderware historians with one
    IP21 historian
  • Historian includes plant data as well as results
    from performance calculations
  • Number of repositories 9
  • On-line data stored for 2 years

31
Project Detail
  • Interfacing
  • Historian
  • Performance calculations

32
Performance Calculations
  • Replace daily performance calculations done in
    excel
  • Total Calculations 927
  • System requirements
  • Easy management of calculation formulae
  • Ability to execute calculations in pre-defined
    order
  • Automated scheduling of calculations
  • Ability to use conditional statement
  • Ability to recalculate
  • Project implementation
  • Use Aspencalc as calculation engine
  • Design database structure and SQL to satisfy
    requirements

33
(No Transcript)
34
(No Transcript)
35
(No Transcript)
36
Project Detail
  • Interfacing
  • Historian
  • Performance calculations
  • Downtime monitoring application

37
(No Transcript)
38
Project Detail
  • Interfacing
  • Historian
  • Performance calculations
  • Downtime monitoring application
  • User interface

39
User Interface
  • Users Operations managers, plant engineers,
    metallurgists,
  • plant superintendents, engineering foreman
  • Interface requirements
  • Production reporting
  • Downtime reporting
  • Manual data entry
  • Performance analysis of plant equipment
  • Performance analysis of processes
  • Fault finding and troubleshooting
  • Web 21 used as primary interface for MES users
  • Process Explorer used for trending

40
Web 21 - Reporting
41
Web 21 Data Entry
42
Web 21 - Graphics
43
Web 21 - Graphics
44
Trending
45
Conclusion and Benefits
  • Project completed in 6 months and within budget
  • Few problems experienced during testing phase
  • Currently being rolled out to users
  • Eliminate multiple version of information
  • Data more easily accessible to users
  • More secure environment for information
    management

46
Way Forward
  • Expand performance calculations to weekly and
    monthly reports
  • Expand available reports
  • Integrate with refineries MES
  • Continual improvement and development