to asphalt installation in two lifts. All conduits are approximately 2 feet under surface. ... 13' to asphalt. 21' to fog line. 11' to asphalt. 19' to fog line ... – PowerPoint PPT presentation

Number of Views:21
Avg rating:3.0/5.0
Slides: 2
Provided by: garylm
Category:
Tags: atr | asphalt | sunnyside

less

Transcript and Presenter's Notes

Title: ATR 231 Sunnyside IC


1
All loops are preformed and placed in base
prior to asphalt installation in two lifts. All
conduits are approximately 2 feet under surface.
43
57
13 to asphalt 21 to fog line
24
37
I15B WB to I15 Sunnyside IC
8
7
6
5
Continuous two way left turn lane
3
4
I15B EB to Bellin Road
1
2
22
33
11 to asphalt 19 to fog line
57
ATR 231 Sunnyside IC Segment Code 030881 MP
104.420
Write a Comment