Wrapping%20up%20and%20Moving%20Forward - PowerPoint PPT Presentation

About This Presentation
Title:

Wrapping%20up%20and%20Moving%20Forward

Description:

The Data Grid side of the picture.. LIGO. LIGO generates 1TB of data per day. ... Need to ramp up active attendance at all OSG venues - (post-baby) Philippe ... – PowerPoint PPT presentation

Number of Views:36
Avg rating:3.0/5.0
Slides: 14
Provided by: rga49
Category:

less

Transcript and Presenter's Notes

Title: Wrapping%20up%20and%20Moving%20Forward


1
Wrapping up and Moving Forward
  • Thank you Gordon for being such a gracious and
    complete host.
  • Thank you to all the speakers, session chairs and
    scribes.
  • We hope you found the meeting useful
  • And thank you all for contributing to the OSG as
    we move forward.

2
Adding to the Resources
All VOs
  • While we have been here the number of Sites has
    increased by 2
  • LeHigh University as part of the GLOW VO and
  • University of NotreDame as part of the North West
    Indiana Grid VO.
  • And the number of VO jobs running has reached an
    all time high

VOs minus the big 3
3
The Data Grid side of the picture..
  • LIGO

LIGO generates 1TB of data per day. This is
transferred to Caltech via FedEx. A subset of
this data is transferred via the Internet on a
time scale of roughly one hour or less. The
size of the subset is about 1/15 of the full
dataset that is being sent via FedEx, which comes
out to about 70 GBs per day.
This same reduced dataset (70GB/day) is
transferred to LIGO Tier II centers on comparable
timescales if they so choose to "pull" the
dataset.
4
Other apps in the pipe?
  • Nanohub.. UNM initial run was 1.5Gbytes.
    Biomoca in animation mode would generate
    terabytes?
  • Upcoming West Nile Virus? 11,000 jobs in a
    sequence. 100Gig.

Apps I/O Profile also needs addressing?
SDSS and GADU have problems, SDSS helped by use
of SE not direct I/O to NFS mounted disk.. But
still have problems getting sufficient reserved
space.
5
Run II Weekly Mail
6
CMS
  • LHC

ATLAS
7
GIN --
  • Gin Data - Erwin Laure (EGEE)
  • GridFTP interop tests status, issues (Gregor)
    (uses stuff from WorldGrid!)
  • SRM interop tests status, issues (Alex)
  • SRB interop tests (including interop with SRM)
    status, issues (Reagan)
  • Further plans (Erwin)
  • GIN Applications - Cindy Zheng (Pragma)
  • 1) TDDFT (whatdye know its from Washington.edu!)
  • Congratulations to both AIST and OSG teams!
    Looking forward to see TDDFT run on all 4 sites.
    Cindy
  • Time-dependent density functional theory in the
    LDA approximation using real-time and real-space
    methods, i.e. without basis sets.
  • 2) CHARMM (JHU Bio) P-Grade Portal
    (Poland/Gridpp).
  • Running on GIN now being registered with OSG VO.
  • Chemistry at Harvard Marcomolecular Mechanics

8
We have (again) identified lots of work that must
be done and some owners of the solutions
  • 1) Easily available (OSG or VDT Cache) scripts
    for each and every VO to validate sites and use
    the information of where they can run --
    Operations, Leigh.
  • 2) Identify available job slots for VOs to use --
    more complex than you might think -- Facility,
    Miron
  • 3) Local Space and Storage reservation and use --
    commitment to 15 sites with SRM V2.2/dCache and
    SRM V2.2/? For testing within 6 months --
    Extensions, Frank.
  • 4) Utilities to diagnose problems, first scripts
    by the end of the year -- Troubleshooting,
    Shaowen.
  • 5) Written agreements on expectations between OSG
    and VOs as well as Software Providers by the next
    Consortium meeting -- Staff, Ruth.
  • 6) Vulnerability identification and decision
    process more clear to management -- Security,
    Don.
  • 7) Interoperability support and agreements --
    Operations, Leigh, Ruth.

9
  • 1) Gratia Accounting Need to ramp up active
    attendance at all OSG venues - (post-baby)
    Philippe
  • Ready to start sending and checking Daily Reports
    to Miron for checking.
  • Ready to start testing replacement of individual
    reports, ingesting the information into the
    common repository, and publishing to OSG.

10
  • 2) OSG 0.6.0.
  • Prioritized list of services from the
    Applications for VDT - Frank.
  • Plan for VDT - Alain.
  • SRM/dCache Need agreed upon plan . Need date
    for full day meeting in September - Alain,
    Eileen.

11
Plans and Reports
  • Thank you to the session scribes and workshops.
  • Executive Team will be looking at the reports and
    outcomes over the next few weeks.

12
Hope to see you at UCSD/SDSC in six months!
13
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com