Title: PARS Activation Readiness Maintenance Mid-Florida P
1PARS Activation ReadinessMaintenanceMid-Florid
a PDC
2237. Participate in Site Survey for CFPS/CFS
3238. Clear space for Scanner Installation for
CFPS
CFS NE corner prepped and wired for new Scanner,
OSW, and KFP workstation.
4239. Make required changes at CFPS site
Electrical Power - Relocate move equipment as
needed for timelines. Wire for CIOSS 1 2
Mechanical - Base line equipment
Telecommunications. - MPI wiring, new FCS
Firewall
5(No Transcript)
6(No Transcript)
7240. Participate in Site Survey for
PDC
8246. Develop plan for Installation/Modification
of electrical and mechanical in PDC- CIOSS
Power requirements- CIOSS Communication
drops- Baseline MPE
9MP workroom Site Prep for CIOSS
10- 242. Identify and Schedule target group of
- employees for specific Maint. - Training
- Trained Scheduled
- DBCS 12 3
- DBCS/EC 3 5
- DBCS/DIOSS 6 3
- CIOSS - F.A.T.
- A Comp. Fund. 2 3
- Network 1 1 ?
- MPI Wiring 5 (on-site)
11243. Determine Site Prep Funding Requiredfor
PDC- all FAT team items submitted approved
by HQ Finance for allocation of funds for CFD
Admin Service procurements
12PARS FAT Verification Items
- HQ QA- Verif. Rm- Del. Ops- Siemens-
Siemens- Visitors
13243. Determine Site Prep Funding Required for
PDC-Additional PDC site prep funding
requested for - Maintenance prep
workhours 2,542 hours - Power and
Communication drops - Materials for equipment
moves 21,300
14248. Send Site Prep Docs to Acq. Mgmt
for Approval.
15245. Place order for spare parts cabinets, if
required. - Order stockroom cabinets as
needed- Remote hot spares cabinet in CFS
16247. Prepare / Update Maintenance
Staffing Plan. -Change positions for PM
window and tour. -Post ET job 0500-1350 N/S
Sat/Fri -Will Complete Daily Senior PM windows
17249. Develop an SOP for updating PARS software
/ In MOS Cabinets.
- All PARS software and directory updates will be
setup in VMARS for Daily, Weekly, and Monthly
routes. - Will follow RBCS procedures.
- Assigned to T-2 ET positions.
- Software will be stored in the Maintenance
software cabinet and at the VMF according to the
Crisis Management Plan.
18Directory Updates
- Local Updates From Plants RIC
- Generated From CFPS Scanning of COA Cards
- PDC CARS Systems Only
- Daily Updates From NCSC (Electronically)
- All Local COA Updates Bundled Together
- Updates on Universal Mailer File (UMF)
- Directories
- Bitmap Exclusion Table
- Weekly Updates (DVD From NCSC) by an ET
- National Change of Addresses
- Directories
19251. Develop a Process and Schedule for
performing weekly PARS database updates. -
During Daily PM window, 500 - 900 - Senior PM
Routes will be Sunday CIOSS1 and Monday CIOSS2
20250. Develop an Escalation procedure for CFPS
Scanner Mechanical / Electrical failures.
-Call contractor Bell Howell-24hr Warranty
contract OSW scanner requires optics cleaning
21252. Identify any Article 32 issues and
work with Labor Relations to resolve. -NONE-A
ll MPE moves and Power/Comm drop nearly completed.
22253. Coordinate maintenance schedules with new
Processing Operations Operating Plan. -New
ET Bid. BT 0500-0150 -N/S Sat/Fri- CFS
FFTs available 0100 - 1230
23254. Contractor finalizes asbestos
disposal plans/activities with
District Environmental compliance
Coordinator and appropriate local landfill
authorities, etc., as required by local, state,
and or national codes.- NONE
24255. Establish Stock-Rotation /
climitization plan for CIOSS labels. -Will
Follow existing procedure currently in place for
CFS FFT labels
25256. Develop SOP for Waste Mail. -Follow
existing procedure currently in place with
Custodial workforce.-Waste volumes still
generated within CFS workroom-Waste containers
staged in CFS/CIOSS verification area
26259. Train Custodial workforce on new Waste
Mail Procedures.- Completed as part of FAT
operations(from CFS CIOSS waste verification
workarea)
27257. Clear space in PDC for equipment delivery
and modification.-Complete and Ready for CIOSS
Modification Ray Oakley
28(No Transcript)
29DBCS 11, ready for the CIOSS modification
Workroom floor ready for 25 addition
30258. Receive install Team Tool Kits,
sign receipt for them upon delivery, and place
them in a secured maintenance area around PARS
equipment location.- East end of CIOSS machine
31Mail Processing Equipment modifications for PARS
processingAFC Replace hardware STP with PC
software STP - start Friday, Aug 22nd _at_ 0600
(4)OCR New computer software STP - start
Saturday, Aug 23rd _at_ 0600 (3)DBCS Replace
PC, monitor, cards and firmware - start
Wednesday, Aug 20th, 0700 (15) MPBCS New
software loaded - start Tuesday, Aug 19th _at_
0700 (6)Final Modification completed on Sept
6th for last DBCS (12)
32New CIOSS LAM Module
- Two High Speed Label Applicators (HSLA)
- One Label Verifier
- Two Vacuum Turbine Units
- One Doubles Detector (DD)
- One Other Side Reader (OSR)
- One Change Of Address Scitex Ink Jet Printer (COA
IJP)
33High Speed Label Applicators
- Two HLSA Per CIOSS
- Speed of Three Meters Per Second
- Each HLSA Can Produce 15,000 Labels Per Hour
- Provides Status
- Almost Empty Indicator
- Empty Status Indicator
34Scitex Ink Jet Printer
- Prints Up To Seven Lines of Information
- Process 30,000 PPH
- Expensive Ink Cartridge
- Limited Life Span
35PARS MAJOR COMPONENTS
- Redirection Image Controller (RIC)
- Advanced Forwarding Reader (AFR)
- Change of Address Record Server (CARS)
- Forwarding Storage Unit (FSU)
- Change of Address Forms Processing System (CFPS)
- Change of Address Reporting System (COARS)
- PARS Video Coding Desks (VCD)
36PARS MAJOR COMPONENTS
37260. Provide or confirm the Transmission Control
Protocol/Internet Protocol (TCP/IP) address for
PARS equipment to the contractor install team
(unless provided at Site Survey)
completed MPI wiring Firewall
installation
38261. Update VMARS to reflect changes due to
PARS. -Develop routes for CIOSS.-Input Spare
Parts into VMARS.
39264. Complete inventory of spares kits
and advise Site Coordinator of status.
265. Inform contractor of any missing spares
parts.
40(No Transcript)