Title: Technology makes it possible
1Technology makes it possible!
GREEN OFFICE 2015 L.J. Westerbaan Imtech
Netherlands Special Market Solutions
Energy
Sustainable
2Energy, Environment CSR (Corporate Social
Responsibility)
The technique makes it possible to live and work
comfortable in an ecologically sustainable
environment
- Green Office 2015
- Innovative vision and integrated approach for
development of durable town areas - Combination of working, living and leisure
3Partners
4Green office 2015 an inner-city development
5Green Office 2015 artist impression
6Green Office 2015 organisation
Steering committee
Projectteam. Green Office 2015
Rau Thomas Bögl Wereldhave Norbert van
Gisbergen ISSO Jaap Hogeling RGD Rene Koeslag /
Gerard Wortman Aronsohn George Henkens
Development team
Imtech Bert
Ubachs TNO Leo Hendriksen Innovat
ie groep UNETO-VNI Winfried Ponsioen
SBR Gerben van Dijk CadVisual
Joost Wijnen Swegon Air Academy
Jos Hartmans Cisco Ronald
Zondervan Philips Licht Floriaan
Tasche TVVL Hans Besselink
Ballast Nedam Wim Kleingeld TVVL, VUmc Energie
Centrum Rob Steine PSIBouw Gerrie
Mühren Stichting Bouw game Cora Gijswijt
Innovation team
Realisation team
7Integrated Green Office 2015 design
- End user
- Social aspects
- Ecological
- Economic
8Different people working and living together
9 Electric energy usage 2008 versus 2015
- OLED lightning
- Well use of daylight
- Low energy building installations
- Additional 48 Volt low voltage circuit
10Heat consumption 2008 versus 2015
- Reduction of gas from 10 to 0
11 Hybrid ventilation, Indirect adiabatic cooling
12Integrated Green Office 2015 design
Achieving a sustainable, affordable and reliable
energy supply in our society and to reduce the
environmentally harmful emissions in the use of
fossil fuels.
13Storage
14Personal
15No compromise
Usage of Peltier elements for personalized
treatment of the fresh air from outside
16Sustainable energy within Green Office 2015
Energy demand building 65000m2 2700 MWh
17Sustainable energy within Green Office 2015
- Breeam is outstanding
- LEED platinum
- Greencalc above 1000
- 3P above 9
- GPR above 9.6
- Energy neutral
- First building made of all available C2C
materials - Free of allergenic and CO2
- Own water circuit
- Optimal use of day-light
- Avoiding of waste, traffic and air pollution
- Optimal use of existing infrastructure
- Promotion of good health
18Green Office 2015 results
- Concrete complete proposal has been well received
inThe Netherlands - Ministry, Dutch Railway, several counties are
interested - Plan supported and / or adopted by many parties
- VROM selected 4 sites to investigate
- Alignment with the Dutch note 2040 VROM
19Conclusions
- Green Office 2015 Human central well being
- Green Office 2015 an energy producing area
- Green Office 2015 Most sustainable in the world
- Green Office 2015 prices per m2 are market
prices - Green Office 2015 cities will be one again
- Green Office 2015 green parcs, energy reduction
- Green Office 2015 is flexible and
multifunctional - Integral multifunctional approach is key
20Thank you for your attention