1ESA Telecommunications ARTES Programme
Jorgen Sandberg Head of Technology Projects
Division Directorate of European Union and
Industry
2ARTES Programme Organisation
- ARTES (Advanced Research in Telecommunications
Systems) Programme constitutes the backbone of
the Telecommunications activities of ESA. - ARTES is a highly flexible Programme that allows
the implementation of RD activities with
different degrees of technical and commercial
maturity - ARTES is structured into Programme Lines, which
cover the main Strategic Areas of Satellite
Communications, and ARTES Elements, which
represent the legal and financial frames of the
Programme
3ARTES Programme Elements
4ARTES 1
- Objective perform mission, system and general
configuration studies to prepare medium and
long-term programme - Funding level fully funded (100), no need to
contact delegation - Process of participation via Invitation To
Tender - Planned ITTs 2005
- Continuous ITT publication process
- Tender period 6-10 weeks
- Evaluation period 5 weeks
- Yearly workplan based on Call for Ideas and
approved by JCB -gt AC -gt IPC - Steps leading to a contract
- ITT -gt Proposal -gt Evaluation -gt Clarifications
-gt Negotiation -gt Contract award
5ARTES 3
- Objectives
- Promote Multimedia applications
- Develop and validate comprehensive MM Systems and
Advanc. Mobile Systems - ARTES 3 is divided in 4 Programme Lines
- Line 1 Development of the Multimedia Market
(Applications/Services) - Line 2 Development of Satcom System Elements
(Equipment Products) - Line 3 Pioneering Novel Systems
- Line 4 Advanced Mobile Systems
- Funding level co-funded activities (50)
- Process of participation via ITT (Lines 12) and
continuous Open Call for Proposals (Lines 34) - Lines 1 and 2 have a yearly workplan approved by
JCB -gt AC -gt IPC
6ARTES 3
- Planned line 2 ITTs in 2005
- Subjects
- 'Multimedia Satellite Equipment' (Issued twice a
year) - 'Multimedia Ground Terminals and Equipment'
(Issued twice a year) - Opening of ITTs in February and September
- Tender period 8-10 weeks
- Evaluation period 4-8 weeks
- Proposals particularities
- Strong emphasis on Strategic Plan / Business Plan
- Market ready product, EQM
- Value for money
- Steps leading to a contract
- ITT -gt Proposal -gt Evaluation and consultations
with delegates -gt Clarifications -gt Negotiation
-gt Contract award
7ARTES 4
- Objective Research, develop demonstrate state
of the art technologies and services with clear
applications potential - Flexible Industry driven Programme Element
- Funding level up to 50
- Process of participation continuous open Call
for Proposals - Strong emphasis on
- Strategic Plan / Business Plan,
- Products ready for the market,
- Value for money
- Steps leading to a contract
- Always open ITT
- Proposal with letter of support from delegation-gt
evaluation -gt - clarifications -gt AC -gt IPC approval (if
total cost is above 1M Euro)-gt negotiation -gt
contract award
8ARTES 5
- ARTES 5 is the instrument to prepare the Long-
Term technological basis for future European and
Canadian Satellite Communications - Funding level fully funded (100)
- Yearly workplan based on Call for Ideas and
approved by JCB -gt AC -gt IPC - The ITTs contain firm SOW and technical
specifications - Steps leading to a contract
- ITT -gt Proposal with letter of support from
delegation -gt Evaluation -gt Negotiation -gt
Contract awarded to winner
9Start-up Initiative
- The Start-up Initiative is a special measure to
assist companies in getting their first contract
with ESA - A company can get only one contract within this
initiative - Proposals are submitted to ESA in response to a
special ITT, which leaves the product to be
defined by the bidder - Cost is limited to about 300kEURO
10New products - generation process
ARTES-5 (ASTE) BUILDING BLOCKS CRITICAL TECH.
M A R K E T
ARTES-3 MULTIMEDIA
ARTES-1 SYSTEM STUDIES MARKET STUDIES
ARTES-4 GENERIC
TRP
GS
ESA 100FUNDED
PARTNERSHIP 50FUNDED
Commercial Maturity (Time)
11Maturity
ARTES-3/4 EQM
ARTES-5 EM-level
TRP/GSTP feasibility
Time
12ESA Telecom As Supporter
Funding
Space Infrastructure Providers
Finance
Tech. Devel.
Advanced Financial Support
Infrastructure
Risk Reduction
Licensing
ESA Telecom
Service
Potential
Providers
Service
Frequency Coordination
Providers
Pilots
Services
Users
Requirements
13 Government ESA Industry Triangle
ESA
Industry
Government/Delegate
14Telecom Long Term Plan 2006-2010
- Continue the ARTES 1, ARTES 3, ARTES 4 and ARTES
5 as they are today. - Add Alphasat mission into ARTES 8.
- Introduce Small Satellites in new ARTES 11
- Emphasize Piggy-Back
15ARTES-8 Large Platform
- AlphaBus is an initiative of Alcatel Space and
EADS Astrium - Two sub-elements
- Sub-element 1
- Pre-developments
- AlphaBus development
- Protoflight model manufacturing and test
- Sub-element 2
- AlphaSat development commercial, institutional
and technology payloads - Announcement of Opportunity gt Beauty contest
-gt - Phase A studies -gt selection of payloads
16ARTES 11 Small Platform
- Initiative of OHB Germany
- Two sub-elements
- Sub-element 1
- Platform development
- Up to 3 kW payload power
- Up to 500 kg payload mass
- 2m x 1.5m x 2m structure
- Protoflight model manufacturing and test
- Sub-element 2
- Satellite development payload not defined
17Telecom - Long Term Plan 2006-2010
A1 A3 A4 A5 A8 A11 Total
Preparatory 50 50
SystemsEquipmentTechnology 175 200 150 525
Applications 30 20 50 100
Large Mission 300 300
Piggy-Back 30 30 60
Small satellites 100 100
Total 50 235 250 200 300 100 1135