Title: Board Meeting August 1213, 2003 Agenda Item 19


1
Board MeetingAugust 12-13, 2003Agenda Item 19
  • Discussion And Request For Direction Regarding
    Location Indentification For The Purpose Of
    Public Resources Code Section 50001

2
PRC 50001(a)
  • no person shall establish or expand a solid
    waste facility, as defined in Section 40194, in
    the county unless the solid waste facility meets
    one of the following criteria
  •   (1) The solid waste facility is a disposal
    facility or a transformation facility, the
    location of which is identified in the countywide
    siting element or amendment thereto, which has
    been approved pursuant to Section 41721.
    (emphasis added)

3
September 2000 Resolution
  • the Board shall interpret PRC 50001 to only
    require a finding that the facilitys location be
    identified in the CSE or NDFE, either by the
    facility address or general location on a map,
    and shall not review the facilitys conformance
    to the description set forth in those documents

4
5 Year Review Cycle
  • Maintain 15 years of disposal capacity
  • Jurisdictions seeking guidance
  • Must CSE be amended?
  • Prefer not to if not necessary
  • Process can be lengthy and resource intensive

5
CSE Amendment
  •         Local Task Force (LTF) comment and
    review
  •         Public Hearing with 30 days Notice
  •         Approval of the county and a majority of
    the cities with a majority of the population of
    the incorporated area of the county (in some
    counties Stanislaus and San Diego one city has
    the majority of the population of the
    incorporated area)

6
NDFE Amendment
  • LTF comment and review
  • Public Hearing with 3 days notice
  • Approval of the jurisdiction wishing to amend
    the NDFE

7
CSE Map Requirements
  • The Siting Element shall include a description
    of each proposed new solid waste disposal
    facility and a description of each proposed
    expansion of an existing solid waste disposal
    facility ...
  •  (1) Each Siting Element shall include one or
    more maps indicating the location of each
    proposed solid waste disposal facility and
    adjacent and contiguous parcels. The map(s) shall
    be drawn to scale and include the scale on the
    map sheet. The type of map(s) may be a 7.5 or 15
    minute USGS quadrangle. (emphasis added)

8
CSE Description Requirements
  • The description shall include the type of
    facility, location, size, volumetric capacity of
    the facility expressed in cubic yards and in
    tons, life expectancy (years), expansion options
    of the existing or proposed facility, and
    post-closure uses

9
NDFE Description Requirements
  • (a) (1) type of facility
  • (2) facility capacity
  • (3) anticipated diversion rate or expected
    diversion rate from the total amount of the
    waste that the facility receives and,
  • (4) participating jurisdictions.
  • (b) (1) address of the facility or,
  • (2) description of the general area, (include a
    land use map, zoning map, or other type of
    planning map).

10
Key Issues
  • New questions not explicitly addressed in Boards
    previous decision
  • Staff have identified potential additional
    determinations based upon Boards later
    pronouncements, and
  • Underlying purpose of statute public
    notice/opportunity for public input

11
Staff Recommendations
  • a. Affirm that an expansion beyond the
    boundaries indicated in a CSE or NDFE not be in
    conformance and would require a revision of the
    document.
  • b. In determining the boundaries indicated in a
    CSE or NDFE, the Board will use either a map or
    a detailed description that uses landmarks,
    parcel boundaries or other sources of
    information that provide a specific description
    which would ensure that the public was fully
    informed about the potential expansion.

12
Staff Recommendations (cont)
  • c. If for some reason, the description and/or
    map in the CSE or NDFE were in conflict, the
    issue of whether a revision was necessary would
    be brought before the Board on a case-by-case
    basis.
  • d. Any other unusual circumstance would be
    brought before the Board for a case- by-case
    determination.

13
Possible Expansion Scenarios
14
1(a). Insignificant expansion beyond boundaries
indicated on Siting Element Map/Description
200 Acres (Existing)
Proposed
15
1(b). Significant expansion beyond boundaries
indicated on Siting Element Map/Description
200 Acres (Existing)
Proposed
16
2(a). Expansion outside of the boundaries
indicated on Siting Element Map/Description with
connection to existing site
Existing
Road
Proposed
17
2(b). Expansion outside of the boundaries
indicated on Siting Element Map/Description with
no connection to existing site
Existing
Proposed
18
3(a). Expansion within area described in Siting
Element, but not included in a Map
Existing
Proposed
19
3(b). Expansion within area described in Siting
Element, but outside boundaries indicated on
Siting Element Map
Existing as described on map
Proposed as indicated in description
20
Conclusion