Kevin Shiels Gas Section Ofreg - PowerPoint PPT Presentation

1 / 12
About This Presentation
Title:

Kevin Shiels Gas Section Ofreg

Description:

Moffat. Coolkeeragh. South North. North west. Phoenix. Corrib. Galway. Irish gas transmission network ... Phoenix - Sole active downstream supplier in NI ... – PowerPoint PPT presentation

Number of Views:24
Avg rating:3.0/5.0
Slides: 13
Provided by: annemc8
Category:
Tags: gas | kevin | moffat | ofreg | section | shiels

less

Transcript and Presenter's Notes

Title: Kevin Shiels Gas Section Ofreg


1
Kevin ShielsGas SectionOfreg
  • Energy Forum
  • 12 March 2004

2
Todays Topics
  • 1. Background
  • 2. Current Developments in NI
  • 3. All-island gas issues

3
Irish gas transmission network
4
1. Background
  • ROI NI
  • 1850 km -135 km SNIP
    -34 km Phoenix
  • -112 km BGE NW
  • -140 km BGE SN
  • -IC 1 2 -SNIP
  • -Inch -(BGE SN Pipe 06)
  • -(Corrib)
  • High Pressure Pipelines
  • Entry Points

5
1. Background Gas Distribution/Supply in NI
to date
  • Phoenix - Sole active downstream supplier in NI
    (Greater Belfast area).
  • Grown from zero customers in 1996 to 66,000 now.
  • Licence issued by Government in 1996 allowing
    exclusive rights in gas distribution and supply.
  • Gas supply full market opening under existing
    licence arrangements on 1 January 2005.
  • Other licence holder in Greater Belfast -
    Energia.

6
2. Current Developments in NI Transmission
  • 1. Postalisation of gas transmission charges
    from October 04
  • - One single set of exit charges for taking gas
    from the NI Transmission network.
  • - Postalised cost base includes all NI
    Transmission related costs.
  • 2. NW Pipeline (BGE NI) - complete in Oct 2004.
  • 3. SN Pipeline (BGE NI) - complete in 2006.
    Greater opportunity for all-island synergies.
  • 4. Asset refinancing - lower costs for both gas
    and electricity customers.

7
2. Current Developments in NI Distribution
  • 1. - Ongoing development in Greater Belfast area
    (increasing market share for gas).
  • - Full opening to competition in January 2005.
  • 2. - New Distribution and Supply licence
    negotiation with BGE (NI) at advanced stage.
  • - Distribution/Supply in the major towns along
    the routes of the NW and SN pipelines.

8
3. All-island All-island Gas Issues
  • Some common issues for NI RoI
  • Desire by policymakers to consider all-island
    gas issues.
  • Security of Supply considerations.
  • Price!
  • At the end of a lengthening supply chain.
  • EU Legislation/Directives.

9
3. All-island But many differences
  • Transmission structures
  • ownership structures.
  • charging- ROI entry/postalised exit
  • NI fully postalised
  • Capacity/commodity
  • network rules.
  • Maturity of development (distribution supply) -
    450,000 customers vs 66,000.
  • Legislative, regulatory, operational, safety,
    financial, etc.

10
3. All-island Harmonised Transmission
tariffs
  • Joint Steering Group - Request to Regulators
  • consider and report back on the cost and benefits
    of harmonising gas transmission tariff
    structures.
  • CER/NIAER Joint Study
  • Options, costs and benefits of harmonising gas
    transmission tariff structures on an all-island
    basis having regard to any legal, regulatory or
    operational obstacles to achieving an optimum
    solution.
  • Completion May 2004.
  • Time Horizon 2007/08 - 10 years.

11
3. All-island Some Good Questions
  • Does having different gas tariff structures
    matter?
  • If so
  • What type of tariffs are optimal in an all-island
    regime entry/exit, fully postalised, zonal?
  • How should tariffs be calculated? - time horizon
    capacity/commodity.
  • How should flows through the new SN pipe be
    tariffed?
  • To what degree is an optimal harmonised regime
    deliverable on the ground?


12
3. All islandStudy into transmission tariff
structures
  • Identify existing commonalities and differences.
  • Identify benefits of harmonisation and their
    distribution.
  • Identify obstacles to harmonisation.
  • Identify any costs of harmonisation and their
    distribution.
  • Identify options for or alternatives to
    harmonisation.
Write a Comment
User Comments (0)
About PowerShow.com