Paint Stripping - PowerPoint PPT Presentation

1 / 15
About This Presentation
Title:

Paint Stripping

Description:

Filtered (Polyester or Fiberglass) Misc. Coating. Three complete walls or side curtains ... Filtered (Polyester or Fiberglass) Training Requirements. All ... – PowerPoint PPT presentation

Number of Views:211
Avg rating:3.0/5.0
Slides: 16
Provided by: jenniferd150
Category:

less

Transcript and Presenter's Notes

Title: Paint Stripping


1
Paint Stripping Misc. Surface Coating
OperationsDan Nickeynickey_at_uni.edu
  • UNIVERSITY OF NORTHERN IOWA
  • 800/422-3109
  • WWW.IWRC.ORG

2
Covers
  • Area sources EPA estimates 38,000
  • Paint stripping activities using Methylene
    Chloride
  • Surface coating of all materials and/or products
  • Finishing and refinishing of motor vehicles and
    mobile equipment

3
Affected Sources
  • Mixing rooms and equipment
  • Spray booths and prep booths
  • Spray guns
  • Spray gun cleaning equipment
  • Equipment used for paint stripping

4
Exemptions
  • Military operations
  • Stripping operations using less than 150 gallons
    of Methylene Chloride per year
  • Wood coating operations
  • Air brushes
  • Aerosol cans

5
Important Dates
  • CFR date - September 17, 2007
  • Comment date October 17, 2007
  • Implementation date December 17, 2007
  • Compliance date
  • Existing sources - December 17, 2009
  • New sources Upon promulgation

6
Four Pillars of the Regulation
  • Paint booth requirements
  • Training requirements
  • Spray gun requirements
  • Spray gun cleaning requirements

7
Paint Booth Requirements
  • Auto Body (cars, construction agriculture)
  • Four complete walls
  • Negative pressure
  • Filtered (Polyester or Fiberglass)
  • Misc. Coating
  • Three complete walls or side curtains
  • Filtered (Polyester or Fiberglass)

8
Training Requirements
  • All painters
  • Every five years
  • 60 days after hire
  • Employee can transferred training from one
    employer to another

9
Training must Include
  • Surface preparation
  • Spray gun setup and operation
  • Spray technique improve transfer efficiency
  • Spray booth and filter maintenance
  • Paint mixing, matching and applying

10
Training must Include cont.
  • Resolving paint application problems
  • Finish defects causes and cures
  • Safety precautions
  • Environmental compliance

11
Spray Gun Requirements
  • HVLP Between 0.1 and 10 lbs/square inch of air
    pressure at the tip
  • Electrostatic Uses a electrical charge to
    attract paint particles to the substrate
  • Gun demonstrated to be equal in transfer
    efficiency (must be approved by EPA)

12
Gun Cleaning Requirements
  • Automated gun cleaning machine
  • Hand clean equipment with non HAP solvents
  • Can not spray cleaning solvent through spray gun

13
Reporting and Record Keeping Requirements
  • Certify
  • All coating applied in a spray booth
  • All spray guns are HVLP, electro static or
    equivalent
  • All painters have completed the required training
  • All gun cleaning is performed in enclose machine
    or by hand

14
Reporting and Record Keeping Requirements (cont.)
  • Initial notification
  • New Source 120 days after startup
  • Existing Source 1 year after promulgation
  • Notification of compliance
  • New Source 120 days after the compliance date
  • Existing Source 30 days after the compliance
    date
  • Annual compliance report

15
NSC Comments
  • The number of impacted sources
  • Training requirements are vague
  • No demises
  • Exclusion of painting large objects
  • The use of paint brushes and rollers
  • The use of non hap paints
  • Major sources have no training requirements
  • Cost to impacted sources
Write a Comment
User Comments (0)
About PowerShow.com