Power Distributrion System PDS Status Report - PowerPoint PPT Presentation

1 / 22
About This Presentation
Title:

Power Distributrion System PDS Status Report

Description:

NSPO (J. R. Tsai, S. Tsai, J. J. Yeh, H. Y. Chang) ETHZ (G. Viertel, K. S. Kim) ... S. Tsai), Mr. Jia-Jing Yeh and Mr.Hung-Yuan Chang, joined CGS for one month ... – PowerPoint PPT presentation

Number of Views:21
Avg rating:3.0/5.0
Slides: 23
Provided by: sergi5
Category:

less

Transcript and Presenter's Notes

Title: Power Distributrion System PDS Status Report


1
Power Distributrion System (PDS)Status Report
  • Chin E. Lin (NCKU)
  • PDS-Subgroup
  • MIT (M. Capell, A. Lebedev)
  • NSPO (J. R. Tsai, S. Tsai, J. J. Yeh, H. Y.
    Chang)
  • ETHZ (G. Viertel, K. S. Kim)
  • NCKU (C. E. Lin, C. C. Li, S. M. Lin)

2
Ongoing activities
  • Box Mechanics Production
  • Harness design
  • Ongoing Boards tests
  • PB2
  • ESEM 3A
  • ESEM 3B,
  • Can bus I/F
  • Boards manufacturing
  • Input Stage
  • Distribution Board
  • Thermal analysis
  • Structural analysis ?completed
  • ESEM 1A and 1 ESEM 3A test ? completed

3
EM Boards testing ESEM 3A, ESEM 3B
ESEM 3-A
4
EM Boards testing PB2 and CAN BUS I/F
PB2 board and test setup CAN BUS I/F
5
EM Boards testing DCDC Aux mezzanine
  • The DCDC Aux
  • Is a mezzanine on all ESEM 3A, ESEM 3B and PB2
    boards
  • Supplies internal power to each main board
  • Can be tested independently from the main boards

PB2 test setup with DCDC Aux mezzanine board
6
EM Boards testing ESEM 1A
  • Test completed
  • Mezzanine, transformer and flying components that
    have been trimmed need final mounting and then
    the board can be closed

7
Box Mechanics under production
8
(No Transcript)
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
(No Transcript)
13
(No Transcript)
14
Input Stage
Telemetry section EMI section
15
Harness design
Area for cables between connectors and DB
Input stage Side A
Input stage Side B
Distribution Board (DB)
Area for ESEM boards Side A Side
B
Area for cables between motherboard and DB
Cable connecting the two motherboards together
16
Collaborators at CGSETH, NSPO, NCKU
17
ETH _at_
  • September 1st Ms. Kyung Sook Kim, assistant of
    Prof. Viertel, joined CGS for two months
  • ONGOING ACTIVITIES
  • Prepare preliminary test procedure at unit level
  • Support to EGSE preparation for board testing

18
NSPO _at_
  • September 29th two engineers from Mechanical
    Engineering section (Head J.-R. Tsai) and
    Electrical Engineering Section (Head S. Tsai),
    Mr. Jia-Jing Yeh and Mr.Hung-Yuan Chang, joined
    CGS for one month
  • ONGOING ACTIVITIES
  • Preparation of EGSE
  • test connector for ESEM 3A
  • PC adapter
  • ESEM 3A board visual inspection
  • Debugging of ESEM 3A (28V distributer)
    temperature sensing circuit
  • ESEM 3A board testing

19
NCKU _at_
  • October 14th two research assistants of Prof.
    Chin E. Lin, NCKU, Mr. Suei Moo Lin and Mr.
    Chih-Chi Li joined CGS for one month
  • TASKS
  • Update EM drawings to FM standard for FM
    mechanics production
  • Support to board testing and organize FM
    components procurement

20
EM Planning
Successful Design Review held in May at CGS
Support from NCKU/NSPO and ETH in
September-October at CGS for test activities
Preliminary CAN tests
EM delivery for FIT at KSC
21
Planning with FM delivery March 2006
22
(No Transcript)