Title: ESGARD NETWORK ACTIVITIES
1ESGARD NETWORK ACTIVITIES
Workshop on Advanced Accelerator
Magnets Archamps, F, 17-18 March 2003
- L. Rossi
- AT Division - CERN
2HEHIHB - 1
- Networking Activity N4
- Topic Coordination of studies towards a future
High Energy High Intensity Hadron Beams after the
LHC - first remarks all studies devoted to field below
10 T must be addressed in a contest of an
injector chain for a HE accelerator - second remark LHC means present LHC (may be some
studies relevant to reach the ult. perf.) - Coordinator Oliver Bruning (CERN, AB div)
- 5 years program
3HEHIHB - 2
- Establishing a road map towards a future high
energy high intensity hadron collider - 20-25 years from first conception of the LHC to
colliding beams! - Even for luminosity upgrade 10 years are needed
- design process is only possible if the technical
limits are well understood. It is too early.
4HEHIHB -3 General scope
- Potential future hadron collider after the LHC
with centre of mass collisions above 14 TeV - Peak luminosity values above those of the LHC
ultimate (goal 5 1034 ??) - Experimental studies in existing machines to
establish a roadmap for future RD and give
directions - Generate RD program to submit as JRP
- Favour international collaboration, including
small laboratories and Universities - Collect but also disseminate information
- Improve existing infrastructure
5HEHIHB -4 Advantage for EU
- ? Integrating laboratories on a European wide
scale will provide a better exposure to the
frontiers of high energy accelerator research and
a more efficient use of the exiting
infrastructures. - ? Integrating laboratories on a European wide
scale will provide improved techniques and
competence for the operation of existing
accelerator facilities. - ? Integrating laboratories on a European wide
scale provides a similar framework as it is
currently set up by the US laboratories - ? Integrating laboratories on a European wide
scale will stimulate the exchange of knowledge
and expertise between research laboratories and
industry and thus provide a stimulating effect on
the European industry. - ? Identification of the most efficient solution
for future high energy high intensity proton
beams.
6HEHIHB - 5 Management structure
- Co-ordinator O. Bruning (CERN) ?
- Deputy co-ordinator ?Work-package
co-ordinators - L. Rossi (CERN)
- H. Reich (GSI)
- H. Schmickler (CERN)
- F. Willeke (DESY)
- E. Tsesmelis (CERN)
7HEHIHB - 6 Work package
- Advancemetns in accelerator magnet technologies.
Abbreviation AMT Chaired by Lucio Rossi (CERN)
Deputy Luca Bottura (CERN) - Advancements in Vacuum Technology. Abbreviation
AVT Chaired by Hartmut Reich (GSI) Deputy Noel
Hilleret (CERN) - Novel Methods for Accelerator Beam
Instrumentation. Abbreviation ABT Chaired by
Hermann Schmickler (CERN) Deputy ??? - Accelerator Physics and Synchrotron Design.
Abbreviation APD Chaired by Ferdinand Willeke
(DESY) Deputy Francesco Ruggiero (CERN) - Machine Experimental Interface. Abbreviation MEI
Chaired by Emmanuel Tsesmelis (CERN) Deputy ???
8AMT1 Stability and Quench Limit of LHC-ultimate
and LHC-upgrade
- Studies of stability and quench limits for super
conducting magnets. For given cleaning efficiency
the LHC should operate at the quench limit of the
super conducting magnets. A thorough
understanding of these quench limits will be
important for pushing LHC performance to its
present ultimate limit and to assess the
possibility of a further upgrade. Theoretical
studies should be complemented by experimental
tests, as far as possible. - A comparison of the various approach to quench
and stability studies and a list of the various
codes available in different laboratories will
help to understand where are the area already
covered and the areas where an effort of research
is to be addressed. Eventually, by favoring the
integration of various quench codes.
9AMT2 Magnets for an SPS upgrade
- The following activities investigate the
possibility to increase the LHC injection energy
by introducing a fast cycling super conducting
booster ring in the SPS tunnel(3 to 5 tesla ? 10
s cycle ?) Minimum 2xSPS - a. Magnet specifications for low cost fast
cycling super conducting dipole magnets that fit
into the SPS tunnel together with the existing
SPS machine (minimum required cross section,
dimensions, peak field and field quality). - b. Specification of the minimum required
cryogenics for such a super conducting booster
ring - c. Analysis of the required transfer line upgrades
10AMT3 - Magnets for a booster ring in the LHC
tunnel
- The following activities investigate the
possibility to increase the LHC injection energy
by introducing a slow cycling compact,
inexpensive, low field super conducting ring in
the LHC tunnel. This LFR serves as booster of the
present SPS to increase of a factor 3 to 4 the
injection in a SuperLHC.
- a. Specification of a magnet design for a low
cost ring based on fast cycling super conducting
dipole magnets that fit into the LHC tunnel
together with an high field ring (minimum
required cross section, dimensions, peak field
and field quality) - b. Specification of the minimum required
cryogenics for such a super conducting booster
ring, by best use of possible 20 K cryogenic
surplus (MgB2 ??)
11AMT4 High Field Magnet Design
15 T Bop is the goal !! (for LHC tunnel)
- To go beyond the present LHC magnets with high
performance conductors (A15 or eventually others)
and special magnet design are required to reach
the technical goal. So main area of development
and of theory and data comparison are - a. cable design with high current and current
density, large temperature margin, acceptable
magnetization - b. coil geometry and stress analysis of high
field magnets in different configurations
comparison among different computing codes. - c. optimization of the coil aperture for coil
construction and global system costs
12AMT5 - Optimisation of the overall cost of the
magnet system for a high energy hadron collider
- The various parameters can be cost-optimized
according to two hypothesis i) fixed ring
(existing LEP-LHC tunnel) ii) new tunnel of
free radius and the following points are to
weighted - a. required cryogenics
- b. required tunnel diameter and dimensions
- c. required service infrastructure
My goal 5 k/d.Tm TOTAL
13AMT6 - Handling of synchrotron radiation in a
superconducting environment
- The increased load from radiation may become the
actual limiting factor for future hadron
colliders making use of magnets at very low
temperatures. Put together the world-wide
experience and try to compare various solutions
and new designs is essential to face this complex
factor. - a. special magnet designs
- b. masks and absorber integration in the magnet
design - c. possible cooling options
14N4-AMT deliverables
- The proceedings of each workshop, published in
electronic form with the system of the peer
review. In particular, the last one should give
solid indication for the possibility of a 12-15
TeV/beam proton collider in the LHC tunnel. The
student/stagist is to work on the topic of the
workshop of the year, to collect documentation
and compare different hypothesis. He/She will
also act as scientific secretary of the workshop. - An annual report (the last year will be also the
final report) indicating the progress of the
integration activity among various laboratories
and asddressing each single work package and a
global assessment of the progress toward HE-HI
hadron collider beyond LHC present energy. The
report must reflect the line given at the annual
general meeting. - An initial ORACLE data base site, accessible via
Web, with some instruments for basic analysis.
The idea is create a system to point to
collection of data already present in single
laboratory adding a suffcient description to
render data usable with perennity.
15Link persons
16Activities and people
1 stagist per year (5 months) 1 fellow for the
data base 2 years
Target 450 k for 5 years, 53 people involved