Title: Status of the V0 electronics
1 Status of the V0 electronics
- Tests of photomultipliers
- Signal treatment
- Electronics
- Milestones
2Photo-multiplier
from T0 R5505 R5946 R7761
Tube/cathode Ø/length 32/20/65 25/17.5/40 38/27/50 39/27/50
Number of stages 15 15 16 19
HVmax 2500 2300 2300 2300
Gain2000 V at 0 T/0.5 T 2/1.6 105 5/2.3 105 106/4.3 105 107/3 106
Rise/transit (ns) 1.5/6 1.5/5.6 1.9/7.2 2.6/7.5
Dark current (typ/max) (nA) 5/20 5/30 5/30 15/100
Pulse linearity (2) (mA) ? 180 360 500
3Charge, gain, time resolution
Signal x 10 25 m cable
4Pulse treatment
5FEE
6Timing for BB and BG
7Minimum-bias triggers
- Starting from the discriminator or the NINO
signal - BB signal detected in time windows centered at
- 11 ns (V0A) and 3 ns (V0C)
- BGA signal detected in time
- windows centered at
- -11 ns (V0A) and 3 ns (V0C)
- BGC signal detected in time
- windows centered at
- 11 ns (V0A) and -3 ns (V0C)
bbc
bba
8V0 mechanics milestones
- Fall 2004
- End 2004
- March 2005 sector 0 of V0A (Mexico) and V0C
(Lyon) - PRR submission
- Fall 2005 V0C ready for commissioning, PMT
characterization (Lyon) - (MIP from each channel,
noise, gain of each PMT) - End 2005 V0A ready for commissioning, PMT
characterization (Mexico) - (MIP from each channel,
noise, gain of each PMT) - Spring 2006
- June 2006 V0C ready for installation in ALICE
- (array fibre bundles PMT
mechanics) - End 2006 V0A ready for installation in ALICE
- (array fibre bundles PMT
mechanics) -
- Responsibles
- Mechanics J.Y. Grossiord
(Lyon), XXXX (Mexico)
9V0 electronics milestones
- Fall 2004 electronics concept finalization
- End 2004 CIU design prototype test (charge,
time, pre-process of triggers) - March 2005
-
- Fall 2005 (final trigger signal, collection of
the data, interface TTC/FEE) - CCIU and TTCIU design
prototype test - PRR submission
- End 2005
- CIU, CCIU, TTCIU electronic
design, setting - Spring 2006 electronics design ready for
realization - June 2006
- electronics construction
- End 2006
- electronics test,
calibration - electronics ready for
installation in ALICE
- Responsibles Electronics Y. Zoccarato
-
10V0 milestones
- Fall 2004 electronics concept finalization
- End 2004 CIU design prototype test
- March 2005 sector 0 of V0A (Mexico) and V0C
(Lyon) - PRR submission
- Fall 2005 V0C ready for commissioning, PMT
characterisation (Lyon) - CCIU and TTCIU design
prototype test - PRR submission
- End 2005 V0A ready for commissioning (Mexico)
- CIU, CCIU, TTCIU electronical
scheme - Spring 2006 electronics design ready for
realization - June 2006 V0C ready for installation in ALICE
- electronics construction
- End 2006 V0A ready for installation in ALICE
- electronics test,
calibration - electronics ready for
installation in ALICE
- Responsibles Electronics Y. Zoccarato
- Mechanics J.Y. Grossiord
(Lyon), XXXX (Mexico)
11V0 cost for 64 channels (R5946)
label unit spare unit price total price
PM R5946 64 - 1712 109568
HV SY2527/A1733P 1/6 - 8812/2929 26386
VME 1 - 9000 9000
Electronics 64 2 70000
Mechanics PM boxes 2 - 1000 2000
Scint. V0A/V0C (m2) 2 x .6 - 1500 1500
WLS F. V0A/V0C (m) 2 x 346 - 3.3 2284
Clear F. V0A/V0C (m) 2 x 3456 - 1.0 6912
Total in Total in Total in Total in 227650
Total in SF Total in SF Total in SF Total in SF 341475
HV cab. V0A/V0C (m) 270 - 5.8 1566
HV con. V0A/V0C (448) - 4756
Sig. cab. V0A/V0C (m) 2 x 1600 - 2.0 6400
Sig. con. V0A/V0C (2 x 576) - 11136
Total in SF Total in SF Total in SF Total in SF 365333