1
Risk assessment
  • CAP131 Working Group (2)
  • 27 October 2006

2
Content
  • The assessment of stranding risk
  • The allocation of stranding risk
  • Conversion to years of the investment proxy i.e.
    X and Y

3
Why consider risk?
  • Seeking to allocate risk of unnecessary
    investment between existing generators, new
    generators, and consumers
  • Seeking to make user commitment commensurate with
    risk
  • Risk needs to consider
  • the impact of the event
  • the probability of the event

4
Impact of an event
  • The reduction of TEC of an existing generator or
    the termination of a new generator agreement
    would have the same impact, in terms of stranded
    asset capital cost per kW
  • Analysis shows that a multiple of 12 times TNUoS
    tariff approximates to the capital investment
    cost and therefore the stranded asset capital
    cost
  • as discussed, other proxies could be used

5
Probability of event
  • Risk of an existing power station closure
  • National Grid forecasts 2.3GW of the present 74GW
    of existing generation will close in the next PCR
    period
  • Probability of closure 3
  • Risk of a new generator project termination
  • National Grid forecasts 12GW of new generation
    will connect in the next PCR period from a
    contracted background of 24GW
  • Probability of termination 50

6
Risk Allocation
  • If use 12 years Generation TNUoS as the total
    user commitment required from all parties and
    apply closure and termination probabilities, can
    develop scenarios
  • For new generators
  • Stranding risk Pn X Gen TNUoS
  • For existing generators
  • Stranding risk Pe Y Gen TNUoS
  • For consumers
  • Stranding risk Pn TNUoS (12-X) Pe
    TNUoS (12-Y)

7
Results
End Consumer
New Generator
Existing Generator
(50(12-X)TNUoS) (3(12-Y)TNUoS)
Risk
50XTNUoS
3YTNUoS
X12 Y12
94
6
0
X6 Y0
47
0
53
X6 Y2
1
47
52
8
Conclusions
  • A combination of X6 and Y2 places 50 of the
    stranding risk with the end consumer