Description:

Procure and install innovative instrumentation to monitor in situ ... Develop a moisture balance within parallel aerobic and anaerobic cells. Volusia County ... – PowerPoint PPT presentation

Number of Views:29
Avg rating:3.0/5.0
Slides: 31
Provided by: biore2
Category:

less

Transcript and Presenter's Notes

Title: NRRL Bioreactor Demonstration Project


1
NRRL Bioreactor Demonstration Project
  • Report to FCSHWM Advisory Board
  • February 25, 2000
  • Tampa, Florida

2
Summary of Accomplishments
  • Response to DEP RAI3
  • Modification of Operation Plan
  • Continued Leachate Monitoring
  • Design of Cell 3 transducers
  • Moisture Sensor Calibration
  • Continued monitoring of Leach Field pressure
    transducers
  • Volusia County Bioreactor Proposal
  • UWMRC Proposal
  • Project Meeting

3
Leachate Collection and Analysis
4
(No Transcript)
5
Moisture Sensor Calibration
6
Calibration of Moisture Sensors
7
DIAGRAM OF EXPERIMENTAL APPARATUS FOR
THECALIBRATION OF THE MOISTURE SENSORS
8
PLAN VIEW OF EXPERIMENTAL APPARATUS
9
Cell 3 Pressure Transducers
10
Cell 3 Pressure Transducer Layout
11
(No Transcript)
12
(No Transcript)
13
Leach Field Head on Liner
14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
(No Transcript)
18
UWMRC Proposal
  • Objective - monitor and evaluate moisture
    movement and moisture balance in a bioreactor
    landfill
  • Procure and install innovative instrumentation to
    monitor in situ moisture content
  • Intensive monitoring period
  • Develop a moisture balance within parallel
    aerobic and anaerobic cells

19
Volusia County
  • Site engineers have recommended bioreactor
    operation at the Volusia County landfill.
  • Unique opportunities because of shredding
    operation and double-composite liner.
  • Pressure transducer installation is planned.

20
Current Schedule
  • Schedule is being dictated by two factors
  • 1. The Permit
  • 2. Filling of Cell 3 at NRRL

21
Response to RAI3
  • DEP Issued an RAI3
  • Involved some minor issues as well as a few
    additional changes to the operations plan
  • Operation plan changes included assurance of
    daily monitoring of some parameters

22
Response to Paul Stills Comments
  • Schedule
  • GPS System
  • UF Lab Equipment
  • Installation of Additional Pressure Transducers

23
(No Transcript)
24
GPS
  • Purpose Provide an accurate, efficient, and
    rapid means to monitor surface elevations for
    settlement analysis and equipment installation.

25
Laboratory Equipment
26
Drying Oven
27
Muffle Furnace
28
Grinder for ProcessingSolid Waste
29
Installation of Pressure Transducers
  • The project team made a decision that the value
    gained by the installation of additional pressure
    transducers was worth the cost.

30