Title: LA DEMARCHE DEVELOPPEMENT DURABLE DANS LE BATIMENT
1RENOVATION LOURDE Lycées Chevrollier Angers
REVIVAL
ETAT DAVANCEMENT DOPERATION STATE IN APRIL 2006
April 2006
2(No Transcript)
3N
BEFORE REFURBISHMENT
4A and N NO WORKS
C
NEW BUIDLINGS
X
REFURBISHMENT
N
K
L
M
J
O
D
H
I
E
F
G
C
B
A
5THEREAFTER REFURBISHMENT DESCRIPTION
6Pulling down
- The existing part with asbestos
- The existing building we keep only the concrete
structure
Creation of a new building (9000m²)
- Area before refurbishment 37000 m²
- Area after refurbishment 42000 m²
- Erection of precarious buildings before all works
and pulling down at the end
7Social consideration
- Permitting to share out equitably the general and
technical education, in order to favour social
mixity - Bioclimatic design
- To favour the passive architecture by conceiving
a building in accordance with the climate
8Insulation with low U-value
- North/East/West façades external insulation
- Treatment of the thermal bridges
- Glazing U-value 1.1
- Aluminium window frame with treatment of the
thermal bridge U-value - (Uw lt 1.9 W/m² C)
9Protection against overheating, solar shading,
special glazing
- Reinforcement of inertia with North, West, East
outside insulation - South solar shading constituted of two parts one
horizontal (easy maintenance) and an inclined
blade parallel to the façade - Glazing with low solar factors
10Daylight strategy
- Solar shading, completed by mobile transparent
net curtains - Opening North façade and creation of North
daylignt - Creation of some secondary daylight in the back
of the classrooms - Selection of glazing with high daylight factor
(0.78 or 0.67) - Colour and reflectance in accordance with the
daylight strategy
11(No Transcript)
12(No Transcript)
13Artificial lighting
- Artificial lighting under the control of daylight
sensors and presence - Advanced artificial lighting with low consumption
fluorescent lamps
Ventilation
- Natural ventilation glass roof between the new
building and the main existing building - Innovative mechanical ventilation by an easy flow
system inlet controlled by the BEMS
14Boiler
- Important reduction (around 40) of the maximum
demand of power, and higher modulation of the
needs - Replacement of the existing burners by modulated
burners with low Nox emissions
Photovoltaic
- Photovoltaic panels on the south part of the
building C (inclination 40)
15BEMS and innovative components
- Advanced BEMS that allows to control the
ventilation, the artificial lighting, the
heating, the boilers and the energy consumption - BEMS used for the monitoring
16Waste management during the building erection or
refurbishment
- Improvement of the treatment of the waste by an
analysis of the pre-existing components and
by a selective deconstruction - Use of building technologies and materials, that
produce limited waste and dont pollute - Follow-up of the waste from the production to the
storage
17Waste management during the life of the building
- Selective collection of the waste
- Information spreading in the school about the
selective collection
Use of friendly environmental materials
- Use of materials with low VOC emissions, no
formaldehyde, no solvent, no polluting emissions
18CO2 analysis data gathering
- Data gathering in order to develop the CO2
building stock budgeting - CO2 emission due to the pulling down, the waste
transport, the component transport, and the
building erection
19Global expertise including investment cost and
maintenance cost
- Determination of the best solution during all the
design phases to both optimize - the investment cost, the maintenance cost, the
energy consumption, the CO2 emission, the
comfort, the health
20Pay back time
21Pay back time
22Pay back time
23 24 Building C, South façade In function since May
2005
25 Atrium, in function since September 2005
1. Air extraction 2. Daylight diffusion by
mirrors 3. Air ventilation by the main entrance
26 Detail of the ventilation of the Atrium, South
façade In function since September 2005
27 Building G, North façade, Entrance of the Atrium
In function since
September 2005
1. Building H, under refurbishment
28 Building H (under refurbishment) Achieved in July
2006
29 Building J, West façade (in the foreground) and
Building K (in the background) In function since
2004
1. Building J, external shading components
30 Buildings E and F, South Façades Achieved in July
2006
31 Building C (South-East corner) and Building E-F
(South façade) Synthesised image
32 THANK YOU FOR YOUR ATTENTION