ICRF%20Task%20Force%20Summary - PowerPoint PPT Presentation

About This Presentation
Title:

ICRF%20Task%20Force%20Summary

Description:

J antenna has never been run at 53 MHz, ... ELMs on antenna loading and FFT commissioning (mostly piggy-back) MC and LHCD synergy (J antenna at 50 MHz. Needs LH) ... – PowerPoint PPT presentation

Number of Views:29
Avg rating:3.0/5.0
Slides: 6
Provided by: psfcwww2
Category:

less

Transcript and Presenter's Notes

Title: ICRF%20Task%20Force%20Summary


1
ICRF Task Force Summary
  • Presented by Yijun Lin

2
ICRF Scenarios on C-Mod (I)
this forum
3
ICRF Scenarios on C-Mod (II)
  • J antenna has never been run at 53 MHz, 60 MHz,
    and 40 MHz.
  • Only feasible to try them out in long campaigns.

4
New Ideas/Presentations
  • Y. Lin
  • ELMs on antenna loading and FFT commissioning
    (mostly piggy-back)
  • MC and LHCD synergy (J antenna at 50 MHz. Needs
    LH)
  • ICRF MC and ITB formation and density control (J
    antenna at 60 MHz)
  • S. Wukitch
  • ICRF sheaths using marker tiles (78 MHz, normal
    and reversed field)
  • ICCD for sawtooth control (78 MHz, CD phase)
  • MCCD sawtooth control in monster sawtooth (50
    MHz, D(He3), CD phase)
  • M. Porkolab (P. Bonoli presented)
  • 2nd harmonic minority heating (J antenna 78 MHz
    or 40-45 MHz. D(H) or D(He3). Low field).
  • C. K. Phillips
  • Fast wave heating and CD below all IC resonances
    (40 MHz, high field. Needs LH to boost Te)

5
Open ICRF Mini-Proposals
  • D(He3) minority heating evaluation (Wukitch,
    MP390)
  • ICRF on sawtooth behavior (Wukitch, MP380)
  • High power experiment (Wukitch, MP379)
  • MC flow drive (Lin, MP378)
  • Plasma performance (Lin, MP376/388, MP417)
  • MCCD (Parisot, MP356, MP447)
  • CNPA test and calibration (Tang, MP389)

Total run time from new ideas 10 days
  • Prioritizing meeting
  • Ranking the ideas/MPs.
  • J-antenna frequencies.
Write a Comment
User Comments (0)
About PowerShow.com