UCSD TIES - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

UCSD TIES

Description:

7 Planned site visits this quarter. Sites to be Tested. Marilla. Los Coches. Ha Hana. Lakeside Conservancy (East pond) Water Quality: Research ... – PowerPoint PPT presentation

Number of Views:29
Avg rating:3.0/5.0
Slides: 11
Provided by: Jayn
Category:
Tags: ties | ucsd | hana

less

Transcript and Presenter's Notes

Title: UCSD TIES


1
Winter 2007Mid-Quarter Presentation
  • UCSD TIES
  • Environmental Monitoring Team
  • February 10, 2007
  • Team Lead Jason Najarro

2
Role of EM Team
  • Manual Water Testing
  • Temp, EC, Dissolved O2, pH, Water Depth
  • Analysis for client
  • Baseline Data
  • Remote Water Quality Monitoring Device
  • Collects WQ Data Automatically
  • Floating Buoy Design
  • Solar Powered
  • Wireless Transmission
  • Database Storage

3
(No Transcript)
4
EM Sub-teams
  • Water Quality
  • Structural Development
  • Hardware Development
  • Software Development
  • User-Interface

5
Water Quality Research
  • Manual Water Testing
  • 7 Planned site visits this quarter
  • Sites to be Tested
  • Marilla
  • Los Coches
  • Ha Hana
  • Lakeside Conservancy (East pond)

6
Water Quality Quarter Goals
  • Biological Oxygen Demand (B.O.D.) has been added
    to the list of parameters being tested
  • Data collected has been stored on EM website and
    available for viewing at http//ties.ucsd.edu/pro
    jects/env_mon/
  • Considering applying for 303(d) listing

7
Software Quarter Goals
  • Improve Database Communication
  • LabVIEW SQL Toolkit
  • Insert data directly into database
  • Write User Manual
  • Software program descriptions
  • Changing system configurations
  • Sensor calibration instructions

8
Hardware Quarter Goals
  • Power System Testing
  • Understand characteristics of system charging
  • and loading
  • Splice sensor wires
  • Fix sensors in the water

9
Structural Quarter Goals
  • Test anchor system
  • Junction box construction
  • Protect sensor wires
  • Sensor Design
  • Determine proper sensor depth
  • Build rack to secure sensors while underwater

10
User-Interface Quarter Goals
  • Finalize Interface Code
  • Critique Interface usability
  • Prepare for next phase of interface Web Based
  • Research web technologies
  • Learn necessary programming
Write a Comment
User Comments (0)
About PowerShow.com