Albania Disaster Risk Mitigation and Adaptation Project - PowerPoint PPT Presentation

1 / 16
About This Presentation
Title:

Albania Disaster Risk Mitigation and Adaptation Project

Description:

... increase low catastrophe insurance penetration among homeowners and SMEs in ... All risk originated under these insurance policies will be reinsured with CRIF. ... – PowerPoint PPT presentation

Number of Views:31
Avg rating:3.0/5.0
Slides: 17
Provided by: WB38
Category:

less

Transcript and Presenter's Notes

Title: Albania Disaster Risk Mitigation and Adaptation Project


1
Albania Disaster Risk Mitigation and Adaptation
Project
  • World Bank presentation to the Ministry of
    Finance
  • Tirana, April 12, 2008

2
AL-DRMAP SEE Disaster Mitigation Issues
  • SEE exposed to a variety of natural disasters
  • Floods
  • Droughts
  • Forest Fires
  • Earthquake
  • Landslides
  • Natural disasters have severe impact on fiscal
    stability
  • Socio-economic impacts on households and
    businesses

3
AL-DRMAP SEE Disaster Risk Mitigation and
Adaptation Program (SEE-DRMAP)
  • Transboundary nature of disasters means that
    countries must coordinate mitigation and response
    actions
  • SEE-DRMAP designed to foster regional cooperation
    on disaster risk mitigation and response
  • Disaster risk and adaptation framework,
  • disaster preparedness,
  • disaster risk insurance and hedging instruments,
  • risk mitigation and adaptation,
  • contingency financing in case of disasters

4
AL-DRMAP Albania Disaster Risk Issues
  • Albania is vulnerable to man-made and natural
    disaster floods, earthquakes, droughts, forest
    fires
  • Effects on the economy and population are
    exacerbated by lack of disaster preparedness,
    inadequate data collection and sharing, and lack
    of insurance

5
AL-DRMAP Proposed Project
  • Objective to strengthen institutional capacities
    to (a) reduce Albanias vulnerability to the
    natural and man-made hazards and (b) limit
    human, economic, and financial losses due to
    these disasters
  • Two-phase adjustable program loan (APL)
  • Ministry of Interior has the overall project
    implementation responsibilities

6
AL-DRMAP Phase 1 Project Components
  • Component 1 Disaster Risk Management and
    Preparedness (US4.89 million Euro 3.16)
  • The component objective is to support capacity
    building for emergency response mechanism through
    provision of necessary equipment, and
    strengthening disaster risk mitigation planning
  • Strengthening Disaster Risk Mitigation Planning
    and Emergency Management
  • Enhancement of Emergency Response Capacity
  • Implementing Agency GDCE (MOI)

7
AL-DRMAP Phase 1 Project Components
  • Component 2 Strengthening of Hydrometeorological
    Services (US2.09 million Euro 1.35 )
  • The component objective is to support disaster
    risk reduction through provision of accurate
    hydrometeorological forecasts and services
    tailored to the needs of disaster risk managers
    in weather-sensitive sectors
  • Implementing Agency IEWE in cooperation with
    Synoptic Services and the National Aviation
    Authority

8
AL-DRMAP Phase 1 Project Components
  • Component 3 Development of Building Codes
    (US0.36 million Euro 0.23 million)
  • The component objective is to reduce risks from
    seismic activities through development of
    improved building codes and mechanisms for
    introduction of improved standards
  • develop a national building code
  • train engineers in new design standards
  • develop a mechanism for licensing of engineers.
  • Implementing Agency MOPWTT

9
AL-DRMAP Phase 1 project components
  • Component 4 Catastrophe Insurance (US2.65
    million Euro 1.71 million)
  • The component objective is provide access to
    private catastrophe risk insurance to households
    and small and medium enterprises (SMEs)
  • A one-off equity contribution to the
    shareholders capital of SEE CRIF for Albania to
    join the insurance pool
  • Public awareness and information campaigns.
  • Implementing Agency MOF

10
SEE Catastrophe Risk Insurance Facility
(CRIF)DRMAP Insurance Component - US2 mm
country equity contribution - US0.5
insurance education campaign and regulatory work
  • Will increase low catastrophe insurance
    penetration among homeowners and SMEs in Albania
    by offering affordable high credit quality
    insurance products (1 out of 100 houses is
    insured and almost no coverage for business
    interruption and property damage for SMEs at the
    moment) the program will also enable the
    government to reduce its fiscal risk exposure to
    natural disasters.
  • To achieve better diversification CRIF will be
    set up as a regional insurance facility serving
    SEE 10 countries.
  • In Albania, insurance policies will be sold
    through domestic insurance companies which will
    receive commissions and access to new clients.
  • All risk originated under these insurance
    policies will be reinsured with CRIF.
  • CRIF will be established in Switzerland and
    regulated by the Swiss Insurance Regulator. It
    will be capitalized by SEE member countries and
    supported by international donors and global
    reinsurers. World Bank will ensure the highest
    technical quality of its operations and risk
    management program.
  • All technical feasibility work (of the order of
    US10 million) will be paid by donors.
  • Albanian government will join as a shareholder
    and will have a board seat.
  • In 5 years, the government will be given an
    option to sell its stake in CRIF to private
    investors at least at its book value or more.

11
AL-DRMAP Phase 1 Project Components
  • Component 5 Project Management (US0.19
    million Euro 0.12 million)
  • The component will finance some project
    management costs, such as procurement and
    financial management consultants, monitoring and
    evaluation activities, incremental operating
    costs of managing the project and project
    reporting and audits.
  • Implementing Agency MOI

12
AL-DRMAP Project Costs
13
AL-DRMAP Project Financing
14
AL-DRMAP Catastrophe Deferred Drawdown Option
(Cat DDO)
15
AL-DRMAP Phase 1 Results Phase 2 Triggers
  • Phase 1 Results
  • A Disaster Risk Mitigation Strategy and
    Investment Program formulated and adopted by the
    Government
  • Hydrometeorological data is shared among relevant
    national and regional agencies and effectively
    disseminated to Albanian decision-makers and
    regional partners
  • New building code developed in accordance with
    European standards and
  • Mechanisms for participating in the catastrophic
    risk insurance facility are in place.
  • Phase 2 Triggers
  • A Disaster Risk Mitigation Strategy and
    Investment Program approved by the Government
  • Effective publication of data on public website
    of data gathered with the support of project
    financing, including digitized climate data and
  • Government implementation of an institutional
    arrangement, with clearly defined roles and
    responsibilities, that facilitates coordination
    of the three public agencies officially involved
    in weather monitoring tasks.

16