COAST-TO-COAST TEAM
  • PROPOSAL PRESENTATION
  • Team Members
  • Babar Ahmad
  • Waclaw Berczynski
  • Pongchat Chattalada
  • Raymond Kujawa

2
Fast rope testing project
  • PurposeTo prepare and conduct testing for
    Royal Singapore Air Force (RSAF)
  • with high degree of reliability.
  • Safety basic criteria.
  • Usage Pulling the troops up and down
  • from the ground.
  • Time Six months, started in May 2000
  • Cost Estimated at 0.15 Million

3
Fast rope testing project
  • Boeing is the only sole contractor.
  • Benefits
  • High degree of test reliability.
  • Extensive testing as desired by the customer.
    Result Increased factor of safety.
  • Modern equipment usage.
  • Latest testing technology to be used.
  • Experienced and trained technical staff.

4
Technical Approach
  • Items to be addressed
  • Preparation of a Testing plan.
  • Preparation for the Testing.
  • Testing.
  • Testing Evaluation and Report.

5
Implementation Plan
  • Testing is main part of the project.
  • Scheduled to end by the end of September 2000.
  • Aircraft testing available after 10th July 2000.
  • Evaluation Reports available 2 months after the
    tests.
  • Rough estimated man-hours required 500300
  • Cost/ man-hour 100-150
  • Maximum material costs 20,000
  • Equipments will be reused several times.
  • Final cost will be based on the negotiation
    between Boeing and RSAF.

6
Plan for Logistic Support and Administration
  • Equipment needed are provided by Boeing and tests
    will be conducted as required by RSAF
  • No subcontractor involved
  • Main cost of the project is Man-Hours.
  • Termination procedure will be done according to
    the contract.
  • Change orders requested by customer that are not
    part of contract will be dealt accordingly.

7
Project Team Members
  • Project Manager
  • Project Engineer
  • Test Director
  • Test Engineer
  • Instrumentation Engineer
  • Structures Engineer
  • Test Technicians

8
Group Diversity
  • Age,Culture and Religion.
  • Educational Background and Experience.
  • Geographic Location.
  • Benefits Ideas, Learning opportunities,Ability
    to succeed under real world constraints.
  • LimitationsCommunication problems, Contacting
    members due to dispersed nature of group.

9
Change Order/ Change Request
  • Negotiating not to have any changes.
  • Handling the changes.Brainstorming ideas,
    Rescheduling or reassigning of tasks.
  • Tools for Communicating Email, MIRC, Xdrive,
    Teleconferencing, Telephonic conversations.

10
Performance Appraisal
  • Group Performance.
  • Individual Performance Completeness of
    submissions in contributions as team members and
    team leaders.
  • Take time to review what each member has to
    contribute weekly in homework and debate.
  • Team members evaluating other members based on
    some standard questionnaire.

11
Conclusion
  • High reliability
  • Low costs to the customer
  • Extensive system testing
  • A team of highly qualified members
  • Continuous monitoring and administration of the
    project with timely progress reports

12