Title: CDTI Subgroup SC186, WG1 SG Status
1CDTI Subgroup (SC-186, WG-1 SG)Status
- Sethu Rathinam
- Randy Bone
- Jonathan Hammer
- (Presented to SC-147)
2Status
- CDTI Subgroup was re-activated in Winter 2003
- Meetings in Oct 2003, Jan 2004, March 2004
- Teleconferences between meetings
- At least one, more planned
- Support from several organizations, including
Govt. and Industry - Boeing, Rockwell Collins, Honeywell, MITRE, NASA,
GarminAT, UPS, Delta/ALPA, (not a full list)
3Status
- CDTI scope
- All traffic (from different sensors) on the same
display - Includes TCAS traffic
- Also ADS-B and TIS-B traffic
- TCAS only displays not prohibited by ASAS MOPS
- Naturally TCAS only display will be required to
meet the TCAS MOPS
4CDTI Requirements Overview
Application Description Tech Requirements
Selected Applications (RTCA,)
Pre Y2000, informal
More Formal, post Y2000
Draft CDTI Appendix (not included in ASA MASPS)
(WG-4, WG-1)
CDTI MOPS draft (June 2001) (WG-1)
ASA MASPS (WG-1/WG-4)
Draft Consensus Needed
Derive Reqs, New text required
Existing, may need changes
Other Guidance And Requirements
Feedback as required
ASAS MOPS CDTI (WG-1) STP, ASSAP (WG-4)
Sethu Rathinam, 28 Apr 2004
5CDTI MOPS Requirements Process
- Collect existing documents to derive/copy CDTI
requirements - Perform review
- Survey related industry (standards, designs,
regulatory) documents and activity - Create issues list for CDTI, collect major and
minor issues - Discussion of issues, general consensus on
direction and scope - Create detailed issue papers
- Discuss issue papers, capture all relevant
information (decisions, consensus, disagreements,
)
6CDTI MOPS Requirements Process
- Make writing assignments from mature issue papers
- If non-issue or minor issue, writing assignments
start early - Disagreements ? Surveys, lab evaluations,
- May result in consensus conclusion
- Disagreement may continue (state this in a note
on the MOPS) - Review written draft material in group, refine
- Capture the essence of requirements in group
meeting (framework, external requirements) - Prefer no writing as a group assignments will
be for 1-3 people, to be reviewed in group
meetings or telecons - Merge with ASSAP and STP documentation as ASAS
MOPS - Review with WG-4
- Rest of RTCA Process Final draft, editorial
committee, final version, send out for vote,
7CDTI Issues
- Several issues remain to be discussed relating to
TCAS - CDTI will have no effect on how TCAS guidance is
displayed (no changes) - CDTI will have no effect on TCAS aural alerts
- Needs group discussion with SC-147 in case
exceptions are needed - CDTI will display traffic from TCAS sensor in
addition to ADS-B and TIS-B sensors - Display fusion issues remain to be worked out
- Help and participation from SC-147 is solicited
- Work on issue papers has begun
- Should TCAS position or other position
information be used for display purposes? - What criteria should be used to choose the
position information? - How should combined symbols be displayed when
data from traffic is received from more than one
source (in addition to TCAS) under no alert, TA
and RA situations? - How should the ASAS architecture accommodate TCAS
under standard conditions and under various ASSAP
failure modes? - Hybrid surveillance (ICAO definition) will have
no impact on CDTI - Transparent to the pilots
8CDTI Issues
- Several other CDTI related issues remain to be
worked out - We are in the process of identifying and
documenting issues in issue papers - Input is solicited from SC-147 on issues of
common issues interest, relating to TCAS being
displayed on CDTI
9SC-186 Relevant Contact Information
- Sethu Rathinam CDTI SG of WG-1
- srrathin_at_rockwellcollins.com
- Randy Bone WG-1 including CDTI
- bone_at_mitre.org
- Jonathan Hammer WG-4 including ASSAP
- jhammer_at_mitre.org