Status of energy deposition studies IR7 - PowerPoint PPT Presentation

1 / 17
About This Presentation
Title:

Status of energy deposition studies IR7

Description:

Introduction to beam collimation. Main issues to be studied. New features of FLUKA ... Biasing techniques ('Russian roulette', splitting, leading particle biasing and ... – PowerPoint PPT presentation

Number of Views:18
Avg rating:3.0/5.0
Slides: 18
Provided by: matteoma
Category:

less

Transcript and Presenter's Notes

Title: Status of energy deposition studies IR7


1
Status of energy deposition studies IR7
  • A. Ferrari, M. Magistris, M. Santana, M. Silari,
    V. Vlachoudis

Review of the LHC Collimation Project 30 June 2
July 2004
2
Overview
  • Introduction to beam collimation
  • Main issues to be studied
  • New features of FLUKA
  • Implementation of the geometry
  • Future work
  • This talk is a status report of a work in
    progress. No results are available at the moment.
  • The FLUKA input is ready and debugged,
    simulations are starting the first week of July.

3
Two warm LHC insertions dedicated to cleaning
IR3, IR7
  • Collimation systems
  • Momentum and betatron cleaning
  • Two beams

4
Principle of beam collimation
Cleaning with collimators (warm)
IR7
RR
RR
Dispersion suppressor (SC)
p,e,p
p,e,p
p,e,p
Beam 1
Primary collimators Damage?
Secondary collimators Damage?
SC magnets Quench?
5
Issues to be studied
  • Energy deposition in collimators and downstream
  • Damage to equipment in cleaning insertions
  • Energy deposition in SC magnets in DS section
  • Damage/perturbation to electronic equipment and
    cables
  • Position of absorbers to cure problems
  • These issues can be studied by means of the MC
    cascade code FLUKA.

6
FLUKA physics
  • Physical models available for cross-checking
  • FLUKA standard model
  • DPMJET 2.5
  • DPMJET 3
  • Possibility of simulating ions
  • Single scattering for incident particles at
    grazing angle

7
FLUKA geometry
  • New features of the latest version
  • repetition of objects according to symmetry
    transformation (rotation, translation,
    reflection, or combination of these).
  • assignment of names to bodies and regions.
  • These features allow implementing a complex
    geometry with a modular approach.

8
Advantages of the modular approach
  • Time optimisation
  • IR7 (more than 200 major components) can be
    implemented with less than 20 prototypes.
  • Maintenance
  • Any improvement in the prototype geometry applies
    to all replica in the tunnel.
  • A new component can be added without modification
    of the existing geometry.
  • Avoid duplicating efforts
  • Every module can be used or modified by different
    users for future studies.

9
Prototypes
Collimators, dipoles, quadrupoles, sextupoles,
multipoles
MB
MQT
10
Reflection MQW Vertical and Horizontal
11
Rotation and run-time corrections Primary and
secondary collimators
  • Rotation around the beam direction and the
    vertical axis
  • Jaw material (carbon, metal)
  • Collimation gap and misalignment (run-time)

12
Additional components
  • Beam Loss Monitors (air volume).
  • Vacuum pipes (need for definition of bake-out
    equipment close to pipe ? AT/VAC).
  • Tunnel walls and estimates for cables.
  • Electronic equipment in RRs (K. Tsoulou).

13
A flexible geometry
  • The magnetic fields and the beam loss
    distribution are described in user written
    routines.
  • A specifically written program creates
    automatically the full geometry from an on-line
    file.
  • Any change in component position, collimator
    rotation or jaw misalignment is automatically
    implemented.
  • With minimal modifications, the same program can
    be used to implement different sections of LHC.

14
Special techniques and physics options
  • Biasing techniques (Russian roulette,
    splitting, leading particle biasing and region
    importance)
  • Energy threshold
  • Electromagnetic cascade
  • Particles to be tracked
  • These options must be defined by the user
    according to the specific case studied.

15
IR7, Straight section
16
Summary
  • Large initial effort to set up flexible and
    complete model of IR7 and cold dispersion
    suppressor.
  • The straight section of IR7 is fully implemented.
  • Prototypes and magnetic field of all components
    in DS have been implemented ? adjusting
    positions.
  • Full simulations starting first week of July.
  • First complete picture end of July.