Title: WITCH: Status
1WITCH Status Outlook
- A. Lindroth, M. Beck, B. Delaure,
- V. Golovko, V. Kozlov, I. Kraev,
- T. Phalet, N. Severijns,
- S. Versyck
2Contents
- Brief reminder/introduction to WITCH
- Recent developments
- The next 12 months
- Ideas for long-term improvements
3Brief reminder/introduction to WITCH Motivation
Other physics possible
4Brief reminder/introduction to WITCH The Set-up
5Recent developments Trap structure!
6Recent developments Vertical Beamline
7Recent developments MCP Ion Source Tests
8Recent developments Crane
9Recent developments other
Control Systembasic version almost ready see
other presentation
- Cabling
- Web readout not quite done yet
- Organization in racks
- spectrometer electrodes top chamber
designed - electronic magnet-system readout/control
10The next 12 months
Top chamber electrode structure
Trapping tests ion source and stable rextrap
bunches
Some sort of recoil spectrum
Optimization
Simulations/preparations for long-term
improvements
Fill gaps/expand Ctrl Sys (due to rapid
development)
11Ideas for future improvements Cryogenic Traps
Biggest contribution to response function width
thermal motion in traps!
Well be looking carefully at SHIPTRAP!
12Ideas for future improvements A Tape Station
used in a new way
Since recoil nuclei are counted directly in an
MCP, that detector will be contaminated ? only
decays leading to stable daughters can be studied.
Solution tape station for secondary e-creation
13Summary
- Several developments have been finished recently,
and few remain as we approach a period of
systematic tests - WITCH will be doing systematic trapping tests,
and possibly get some sort of recoil spectrum
this radioactive-beam period - 2004 will show the principle with decent
precision, the set-up and method will be refined
and potentially present limits on a will be
reached - After 2004, or so, larger upgrades of WITCH might
be started