Project specifications and management plans - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

Project specifications and management plans

Description:

We are down to provide the coating on the ultimate reaction masses but not the masses. ... Ears. Need to pin down details of Bham scope/interfaces. 12. Advanced ... – PowerPoint PPT presentation

Number of Views:21
Avg rating:3.0/5.0
Slides: 14
Provided by: physic57
Category:

less

Transcript and Presenter's Notes

Title: Project specifications and management plans


1
Project specifications and management plans
  • ALUKGLA0019aAUG03
  • Glasgow meeting, August 2003

2
Contents
  • Structure of planning documents
  • Management scheme for UK activities
  • Specification management plan of WP1
  • Specification management plan of WP3
  • Scope issues
  • Specification issues

3
Structure of documents
  • Each project has
  • Project spec
  • Includes SCOPE
  • What we are going to do
  • Management plan
  • How we are going to do it
  • Technical spec
  • Interface plans
  • Time plan
  • Cost plan

4
Management scheme for UK activities
  • There will be a scientific/managerial Oversight
    Committee set up by PPARC
  • There is a monthly UK project management
    committee
  • There will be a project advisory group which will
    take decisions that are beyond the scope of the
    PMC, especially about use of the working
    allowance.
  • Each WP has a WP manager who looks after
    planning, money, and day-to-day management of
    their WP.

5
WP1 - management plan
  • Paramount constraint - budget
  • Meetings, cost management
  • QA via project documents
  • Interfaces are important
  • Change control
  • Project spec formally controlled
  • changes documented at UKP meetings, updates
    circulated
  • Documentation

6
WP1 - specification
  • Scope
  • Combined UK Plan
  • monitor (mostly via PMC meetings)
  • monitor changes and corrections
  • Deliverables
  • combined plan
  • meeting minutes
  • resource usage reports

7
WP3 - management plan
  • Little to add to what has already been said
  • but read it!

8
WP3 - specification (SCOPE)
  • project plan
  • understand existing design
  • change design to improve it?
  • design reviews
  • two noise prototypes
  • tender 27 (?) off
  • oversee manufacture
  • attend LASTI for noise prototype installation
  • attend LHO and LLO to install 2 off each
  • PIR
  • advise on remaining installations

9
WP3 scope in pictures
10
WP3 scope in words
11
Scope issues
  • We are providing tooling for assembly but not
    installation. This does not really make sense.
  • We are down to provide the coating on the
    ultimate reaction masses but not the masses. This
    only makes sense from some points of view.
  • How much work is there to do to pick up the
    existing design/post control prototype and make
    the final design?
  • How many suspensions?
  • Need to resolve whether the CP are part of the
    ITM SUS.
  • Significant cost effect.
  • OSEM counts
  • Ears
  • Need to pin down details of Bham scope/interfaces.

12
Specification issues - 1
  • ES actuation or photon drive?
  • Number of stages in BS, FM (and CP)
  • Effect of design on noise
  • Breakaway points how clean is clean?
  • What other issues do we need to watch?
  • Blades matched/paired? Within what tolerance?
  • The whole adjustment/alignment thing
  • OSEM mount rigidity
  • Imperial/metric threads

13
Specification issues - 2
  • Clamp mass limits
  • OSEM eddy currents?
  • OSEM static buildup?
  • SEI system interaction (minimum Fn etc)
  • 10 Hz noise issues
  • Size envelope (and interfaces)
  • Mass budgets
  • OSEM performance requirements