Title: Software Development Problems


1
Software Development Problems
  • Range of Intervention Theory
  • Prevention, Treatment and Maintenance
  • Planning, Development and Use
  • Cost of Intervention

2
Case Discussion
  • Concordia Castings Company

3
Some Basic Problems
  • Incomplete, unclear or inadequate requirements
  • Frequent changes to specification
  • External sources (vendor, subcontractors, etc)
  • Difficulties in concluding the project
  • Frequent changes in development personnel

4
Some Basic Problems(management errors)
  • Poor estimates
  • Budget, Schedule, development resources,
    technical estimates
  • Inadequate tracking and supervision
  • Uncontrolled changes
  • Poor testing procedures
  • Poor development documentation

5
Risk
  • Foresight is an excellent PM quality
  • Ability to anticipate problem
  • What is Risk?
  • An uncertain event or condition that, if it
    occurs, has a positive or negative effect on a
    projects objectives.
  • PMI (project management institute)

6
Risk Analysis
  • Risk analysis includes the estimating its
    probability, evaluating its impact and preparing
    for solution in advance.
  • Risk analysis is not free
  • Project size/complexity vs. risk
  • Theory
  • Software development would never be deterministic
    and vice versa

7
Risk and system complexity
Risk Technical Cost Schedule
System Complexity
8
Successful Risk Management
  • SEI summaries successful risk management as
    follows
  • A successful risk management practice is one
    which risks are continuously identified and
    analyzed relative importance.
  • Risks are mitigated, tracked, and controlled to
    effectively use program resources.
  • Problems are prevented before they occur and
    personnel consciously focus on what could affect
    product quality and schedules

9
Common risk factors
  • Risk factors
  • Lack of top management commitment to the project
  • Failure to gain user commitment
  • Misunderstanding the requirement
  • Lack of adequate user involvement
  • Failure to manage end user expectation
  • Changing scope and objectives
  • Lack of required knowledge/skill in the project
    personnel
  • New technology
  • Insufficient / inappropriate staffing
  • Conflict between user departments

10
Anticipating Problems
  • Step One
  • Do a review of all project technical and
    administrative plans
  • Project development plan
  • Requirement specifications
  • Design specification
  • Personnel
  • External sources
  • Etc
  • Step two
  • Compile a list of all anticipated problems and
    describe the potential effect of each problem on
    the project.

11
Problem and Description
  • Late delivery of hardware
  • Communication and Networks problem
  • Staff
  • .
  • If vendor dont deliver the system by date the
    integration will be delayed and it will have
    effect on cost and schedule.
  • Too slow to support the new system upgrade must
    be completed before testing
  • Problem with so and so with respect to bla bla.
    Especially the resources from other the side

12
Risk Analysis Stage
  • Evaluation of the anticipated risk
  • Estimate the probability that the risk will occur
  • Estimate the impact of the problem on the project
  • Attribute a measure of severity to the problem
  • Contingency plan

13
Calculating severity
Problem Expectation Impact Severity
Staff 6 5 30
Late delivery of hardware 5 8 40
Communication and Networks problem 5 5 25



10 lt severity gt 10
14
Analyzing
Problem Description Severity Contingency plan Tracker
  • Project severity expectation (1-10) impact
    (1-10)
  • When should risk analysis be formed?
  • Is not a time activity
  • Periodic update and reviewed

15
Implementing Contingency Plan
  • The anticipated problem occurred or become
    imminent
  • The contingency plan requires advance preparation

16
Case Discussion
  • Timberjack Parts Package Software selection
    Project

17
Note
  • Luck as a key factor in PM
  • Prevention better than cure
  • But you have to look for it.
  • Know where to look and
  • What to look for
  • Do a risk analysis periodically
  • What to do
  • Complexity and risk analysis
  • There is always a price tag