Interaction Region and Beam-beam: Status and Plans - PowerPoint PPT Presentation

About This Presentation
Title:

Interaction Region and Beam-beam: Status and Plans

Description:

Local orbit bump through IP6 1 interacting pair of bunches at a time, Several ... Energy deposition will be key in defining luminosity reach ... – PowerPoint PPT presentation

Number of Views:10
Avg rating:3.0/5.0
Slides: 25
Provided by: beamsdi
Category:

less

Transcript and Presenter's Notes

Title: Interaction Region and Beam-beam: Status and Plans


1
Interaction Region and Beam-beam Status and Plans
  • Tanaji Sen and John Johnstone
  • FNAL

2
IR Layouts proposed
  • Baseline layout with quads first and Nb3Sn/NbTiTa
    superconductor (LARP)
  • Quads first with early separation dipole D0
    inside detector
  • Dipoles first with triplet focusing (LARP)
  • Dipoles first with doublet focusing (LARP)
  • Combined function magnets with low field and
    large apertures.

3
Ratings of IR layouts
  • Luminosity reach multi-parameter space but
    energy deposition critical
  • RD time time required to develop the most
    critical hardware and to integrate it in the LHC
  • Operational time time required to experimentally
    validate an upgrade scheme and to implement it in
    routine accelerator operation

Proposed by F. Ruggiero and W.Scandale
4
IR Upgrade Optics Repository
  • Goal Rating of alternative layouts and to
    deliver a "forward looking" baseline scenario for
    the LHC Luminosity Upgrade by the end of 2006
  • Repository at CERN
  • (R. Tomas, F. Zimmermann)
  • Webpage http//care-hhh.web.cern.ch/care-hhh/Sup
    erLHC_IRoptics/IRoptics.html
  • Contains input lattice files, plots of apertures
    and optics functions for different dipoles
  • first and quadrupoles first layouts
  • Baseline layout, ß0.25m

5
IR Design Issues
  • Requirements on magnet fields and apertures
  • Optically matched designs at all stages
  • Energy deposition
  • Beam-beam interactions
  • Chromaticity and non-linear correctors
  • Dispersion correction
  • Susceptibility to noise, ground motion emittance
    growth
  • Closest approach of magnets to the IP (L)
  • Impact of Nb3Sn magnets, e.g flux jumps
  • .. All need to be considered in defining the
    luminosity reach

6
Optics solutions - LARP
Quads first
Dipoles first triplets
Dipoles first doublets
7
Impact of lower L Quads 1st vs Dipoles 1st
  • Moving magnets closer to the IP allows smaller ß
    for the same ßmax
  • Expect larger benefit with quads first optics
  • Example,
  • at L 19m,
  • Quads 1st ß 0.2 m for a 25 increase in
    Luminosity
  • Dipoles 1st ß 0.22 m for a 15 increase
    in luminosity

Quads 1st ßmax 9km
Dipoles 1st ßmax 25km
8
Flux jumps and chromaticity
Flux jumps have been measured in the model Nb3Sn
dipole magnets
Quads 1st
Dipoles 1st
Large fluctuations in the normal and skew
quadrupole components of HFDA04 dipole magnet are
observed. They are not necessarily complying
with the magnetic field symmetry (e.g. dipole)
and can produce fluctuations in allowed and
unallowed harmonics.
V. Kashikin
Qx
Qy
Q3
Q2b
Q2a
Q1
Q1
Q2a
Q2b
Q3
  • Chromaticity change depends on the level of
    spurious dispersion in the IR.
  • If Dx1cm at IP, then for
  • ?b3 1unit, ?Q 2
  • with dipoles 1st or quads 1st
  • Nonlinear effects may be important

Changes in the multipole harmonics of the IR
quads could have a major impact on the beam,
e.g. changes in b3 (European) change the
chromaticity
9
Energy Deposition
  • MARS simulations for Nb3Sn quads are in progress
    dependence on aperture, absorber thickness and
    material
  • MARS simulations for an open mid-plane dipole
    (BNL) showed that with an additional absorber
    (TAS2), energy deposition could be mitigated in
    the dipoles.
  • Scaling law for energy deposition (J.P.
    Koutchouk)
  • Scaling law will be tested and refined with
    simulations. A reasonably accurate law will be
    very useful for testing different optics layouts

10
Beam-beam tune shifts
  • Major motivation for the dipoles first optics is
    the smaller number of long-range interactions
  • Quads 1st 30 long-range per IR with
    separations in the range 6 14 s
  • Dipoles 1st 12 long-range per IR, separations
    constant at 9 s
  • Footprint is larger for the quad 1st optics
    specially at 6s
  • Do these wings in the footprint represent an
    adverse impact on the beam? Needs to be tested
    with simulations
  • If wire compensation is shown to be effective,
    then this concern with the quads first optics
    could be mitigated.

ß 0.25m optics
11
Round vs Elliptical Beams at the IP
  • Dipoles 1st triplets vs doublets
  • Doublets produce elliptical beams at the IP
  • Expect different beam-beam behavior

J. Qiang
  • Elliptical beams have a larger footprint
  • Emittance growth from the head-on collision only
    is larger with elliptical beams strong-strong
    simulation
  • If elliptical beams are worse, doublets will
    have to be dropped

12
RHIC beam-beam experiments
  • Motivation Test of wire compensation in 2007
  • Determine if a single parasitic causes beam
    losses that need to be compensated
  • Experiments in 2005
  • At injection energy - found strong effects at
    separations 6s.
  • Experiments in April 2006
  • 2 experiments done so far April 5th, April
    12th
  • Local orbit bump through IP6 1 interacting
    pair of bunches at a time, Several pairs of
    non-interacting bunches

13
Beam-beam experiments at RHIC
W. Fischer
  • 2nd Study April 12th
  • Done at IP6 with small ß
  • No beam lifetime changes from vertical
    separation (lifetime changes above are from
    tune changes due to orbit changes)
  • But small ß
  • 1st study April 5th
  • Done at nominal parasitic location
  • Beam lifetime responds to vertical separation
  • But vertical separation ? 4s

14
Simulations for the RHIC experiments
  • Motivation Tests and improvements of codes,
    predictions of observations in 2006 and of wire
    compensation
  • Four groups
  • FNAL V. Ranjbar, T. Sen
  • SLAC A. Kabel
  • LBL J. Qiang
  • University of Kansas J. Shi
  • Website http//www-ap.fnal.gov/tsen/RHIC
  • for information exchange and results

15
Beam-beam simulation results
BBSIM (FNAL)
  • Chromaticity sextupoles, synchrotron
    oscillations, random noise included
  • Tune footprints, dynamic apertures, diffusion
    coefficients and lifetimes
  • estimated from diffusion
  • Lifetimes show a linear dependence on the beam
    separation

16
Simulation results (contd.)
Emittance growth
Losses
U Kansas
LBL
Predict qualitative change at separations lt 5s
SLAC
17
(No Transcript)
18
Summary
  • Several new optics layouts proposed. Repository
    at CERN.
  • Proposal to rate IR layouts on luminosity reach,
    RD time, operational time. Work towards defining
    a baseline scenario.
  • Most optics require quads with apertures gt 100 mm
  • Energy deposition will be key in defining
    luminosity reach
  • Beam-beam simulations will help in deciding
    between round and elliptical beams.
  • Beam-beam experiments started at RHIC. Initial
    results from beam-beam simulations by several
    groups
  • Wire compensator designed

19
Plans
  • IR Design
  • Develop matched solutions at all stages,
    determine correction schemes towards the baseline
    report for the upgrade
  • Energy Deposition
  • Optimize magnet design, determine absorber
    (TAN, TAS) requirements and validate scaling laws
  • Beam-beam experiments at RHIC in 2006
  • explore vertical separation at nominal
    long-range interaction point with better
    sensitivity of beam loss measurement
  • Beam-beam simulations
  • RHIC detailed comparisons with data from
    2006 experiments.
  • IR optics compare different layouts and
    sensitivity to imperfections
  • Wire compensator
  • Install both units in RHIC during 2006
    shutdown.
  • First tests with beam in 2007

20
Backups
21
Features of the doublet optics
  • Symmetric about IP from Q1 to Q3, anti-symmetric
    from Q4 onwards
  • Q1, Q2 are identical quads, Q1T is a trim quad
    (125 T/m). L(Q1) L(Q2) 6.6 m
  • Q3 to Q6 are at positions different from
    baseline optics
  • All gradients under 205 T/m
  • Phase advance preserved from injection to
    collision
  • At collision, ßx 0.462m, ßy 0.135m, ßeff
    0.25m
  • Same separation in units of beam size with a
    smaller crossing angle FE v(ßR/ ßE) FR 0.74
    FR
  • Luminosity gain compared to round beam

Including the hourglass factor,
22
Chromaticity contributions
  • Inner triplet and inner doublet dominate the
    chromaticity
  • Anti-symmetric optics upstream and downstream
    quads have opposite
  • chromaticities
  • Symmetric optics upstream and downstream quads
    have the same sign of
  • chromaticities

23
Chromaticity comparison
ß 0.25m Complete Qx Insertion Qy Inner Qx Magnets Qy
Quads first Dipoles first triplets Dipoles first - doublets -48 -99 -105 -48 -96 -121 -44 -82 -103 -44 -82 -112
  • Including IR1 and IR5
  • Q (dipoles 1st with triplets) - Q (quads
    1st ) gt 99, per plane
  • Q (dipoles 1st with doublets) - Q
    (dipoles 1st with triplets) gt 31, per plane

24
Energy deposition in open mid-plane dipole
Optimized dipole with TAS2 IP end of D1 is well
protected by TAS. Non-IP end of D1 needs
protection. Magnetized TAS is not useful.
Estimated field 20 T-m Instead split D1 into D1A
and D1B. Spray from D1A is absorbed by
additional absorber TAS2 Results (N. Mokhov)
Peak power density in SC coils 0.4mW/g,
well below the quench limit Dynamic heat load to
D1 is drastically reduced. Estimated
lifetime based on displacements per atom is
10 years
Write a Comment
User Comments (0)
About PowerShow.com