Title: Overlap of Project X and Beamline to DUSEL


1
Overlap of Project X and Beamline to DUSEL
  • June 2, 2008

2
120 GeV Targeting OverviewNeutrino beams
utilizing 120 GeVprotons from Project X Main
Injector
  • Jim Hylen
  • Accelerator Physics and Technology Workshop for
    Project XNovember 12-13, 2007

Project X to NuMI Initial studies indicate
the technical limit to beam power that could be
accepted by an upgraded NuMI beamline
is 2 MW - however risk analysis is needed
because of reduced redundancy and safety
factor for very difficult-to-repair decay pipe
and absorber Project X to DUSEL No
showstoppers for Project X beam to a new neutrino
beam-line - the specified beam parameters for
2.3 MW can be handled by a
conventional neutrino beam-line - the target and
window cooling are the most challenging aspects
3
Project X RD Plan
  • The RD program supports a facility scope that
    includes
  • Modifications to the NuMI facility to support
    operations at 2 MW beam power
  • the new target hall to DUSEL options is not
    considered in this report

4
Project X WBS
  • 8 Neutrino Beamline
  • 8.1 Primary Beamline
  • 8.2 Secondary Beamline
  • 8.2.1 Target design
  • 8.2.2 Magnetic Horn Design
  • 8.2.3 Module upgrades
  • 8.2.4 Target Chase Cooling
  • 8.2.5 Decay Pipe Window Replacement
  • 8.2.6 Decay Pipe System
  • 8.2.7 Hadron Absorber Design
  • 8.3 Remote Handling
  • 8.4 Radiological Issues
  • 8.5 Infrastructure
  • 8.6 Project Management

5
Project X WBS that applies to DUSEL
Design 2 MW Target
  • 8 Neutrino Beamline
  • 8.1 Primary Beamline
  • 8.2 Secondary Beamline
  • 8.2.1 Target design
  • 8.2.2 Magnetic Horn Design
  • 8.2.3 Module upgrades
  • 8.2.4 Target Chase Cooling
  • 8.2.5 Decay Pipe Window Replacement
  • 8.2.6 Decay Pipe System
  • 8.2.7 Hadron Absorber Design
  • 8.3 Remote Handling
  • 8.4 Radiological Issues
  • 8.5 Infrastructure
  • 8.6 Project Management

Corrosion Issues. Detailed Design depends on
size of target chase
Still in conceptual stage. Repair Facility. May
be some overlap, but details depend on crane
coverage, component size
6
Horn status
Horn 2 now
Still running with original horns in midst of
3rd repair of a water line ceramic transition.
Have accumulated 18 million pulses since May
2005. See visible corrosion.
7
High Power IHEP Target Design
Design Study of the NuMI Target for 2 MW
Upgrades Task A Report of the Accord between
FNAL and IHEP
May be suitable for up to 2 MW But 10 fewer
neutrinos / POT (Pions cant exit out the sides
as easily as in the fin designs)
8
WBS Numbers
9
DUSEL Beamline
NuMI Beamline
Project X 2 MW engine
400 kW engine
Neutrino Speedway