Elisabeth Ellegaard Cabinet Magnette

1 / 17
About This Presentation
Title:

Elisabeth Ellegaard Cabinet Magnette

Description:

Elisabeth Ellegaard Cabinet Magnette – PowerPoint PPT presentation

Number of Views:73
Avg rating:3.0/5.0
Slides: 18
Provided by: peterwi9

less

Transcript and Presenter's Notes

Title: Elisabeth Ellegaard Cabinet Magnette


1
Elisabeth Ellegaard Cabinet Magnette
  • 15th Conference of the UN on Climate Change
  • Copenhagen (December 2009)
  • Preparation of BE position and EU negotiations

2
4 Building Blocks
2C ? More mitigation less adaptation
3
4 Building Blocks
Support for DC
Support for DC
Investment in technology
4
4 Building Blocks
Transfer to DC
Transfer to DC
Investment in technology
5
4 Building Blocks
  • Shared Vision
  • Integrate all building blocks
  • Principles
  • Long term goal
  • ?T
  • ppm
  • peaking year
  • emission trajectories

6
2 Track approach in the Bali Roadmap (2007-2009)
  • AWG LCA
  • Convention
  • Long Term Cooperative Action
  • Bali Action Plan
  • Shared vision (incl. Long Term Goal for Emission
    Reductions)
  • Mitigation (incl. REDD sectoral approaches, ..)
  • Adaptation
  • Technology
  • Finance
  • AWG KP
  • Kyoto Protocol art. 3.9
  • Further commitments Annex 1 parties
  • Aggregate and individual scale of emission
    reductions by Annex 1 Parties (Annex B)
  • Accounting rules LULUCF
  • Enhanced and new flexibility mechanisms, )

Legal form of the Agreement ?
AWG KP
AWG LCA
7
Mitigation
8
Mitigation
  • Main challenges for the EU
  • Sufficient leadership what kind of leadership?
    Building bridges
  • Transition towards 30 target
  • Linked to comparability of efforts of other
    industrialised countries
  • Sufficient action for developping countries
    finance technology transfer
  • Key elements of BE position
  • Copenhagen agreement not undermine environmental
    integrity and level playing field
  • LULUCF
  • Surplus AAU
  • REDD / REDD Carbon market

9
Mitigation - LULUCF
  • BE position
  • Preserve biodiversity and ecosystems
  • Accounting rules
  • Conservative reference level
  • Symmetric interval (5)
  • Of
  • Maintain existing rules, with a significant
    discount factor (85)
  • Outcome of accounting rules determine objectif
    (QELRO)

10
Mitigation - Surplus AAU
  • Context
  • Surplus in economies in transition (Russia,
    Ukraine, but also new MS)
  • Surplus AAU can be banked in post 2012
  • 100 transfer gt ambition level would reduce by
    more than 5
  • Main discussion point between EU15 and new MS
  • BE position
  • Reduce banking of AAU to post 2012 if possible
    (discount factor)
  • Otherwise take into account when setting the
    national objectives

11
Mitigation - REDD
  • Context
  • Emissions from deforestation in developping
    countries (DCs) 20-25 of global CO2-emissions
  • Consensus about need to finance actions in DCs
  • Discussion about financing mechanism (carbon
    market or not)
  • BE position
  • Protection of biodiversity, indigeneous peoples
  • Particular attention for countries that have
    preserved their forests (Congo)
  • Link with carbon market
  • MT start with pilot projects
  • LT decide after solid evaluation

12
Finance
  • Scale of needs
  • World Bank (WDR 2010)
  • Adaptation needs 75 G/yr (2030)
  • Mitigation needs 400 G/yr (2030)
  • European Commission Communication
  • Needs 100 G/yr. (2020)
  • Public funding 22-50 G/yr (2020)
  • EU contribution 1- 3 G/yr (2020)
  • Fast start 5-7 G/yr (2010-2012)
  • Demands by developing countries
  • Up to 1,5 of GDP (on top of ODA)
  • Mainly public finance

13
Finance
  • EU Position
  • EU will take on its fair share of financing
    actions in DC.
  • scaled up over time dependent on the level of
    ambition of the Copenhagen agreement, the
    ambition of LCDS adopted by DC, and the delivery
    over time of substantial and growing emission
    reductions.
  • Main principles of contribution ability to pay
    (GDP) responsibility for emissions
  • primary role of private financing, but also
    public support for actions for mitigation and
    adaptation, particularly in LDC
  • Fast-start financing is key

14
Finance
  • BE position
  • Validate CEC estimations as a clear political
    signal
  • Intra-EU Burden sharing only after CPH
  • Additionnality with ODA
  • Preferably from EU budget also for fast start
    financing

15
Legal framework
  • EU single legally instrument if acquis of KP is
    preserved, openness for other options
  • G 77 continuation of acquis of Kyoto (objectives,
    accounting rules, compliance,), blame EU killing
    Kyoto
  • US one single text, total alternative approach
    (unilateral schedules and national pledges)
  • BE position
  • Starting position fully fledged legally
    agreement in Copenhagen
  • For industrialised countries maintain Kyoto, but
    openness for other options for DCs.
  • Need to avoid to evolve towards an agreement
    based on soft law no race to the bottom

16
Process
  • EU position (SE EU Presidency)
  • Environmental Council (21/10)
  • Ecofin Council (20/10) on Finance gt no
    agreement
  • EU Council 29-30/1O endorsed ENV Council position
    and some outstanding issues (Finance, surplus
    AAU)
  • Extraordinaru Environment Council (23/11)
  • EU Council 10-11/12 remaining crunching issues
    (fast-start)
  • BE position
  • Comité de Concertation Politique internationale
    Env.
  • Foreign Affairs DGE preparations of Council
    meetings
  • Minister Magnette Head of Delegation Copenhagen

17
Continuation during BE EU Presidency 2010
  • Thank you !
Write a Comment
User Comments (0)