Title: Telecommunications
1Telecommunications Data Networking Futures
- Scott Baily, Director of ACNS
2Theme
- When the horse is dead, get off! var., incl.
Rosita Perez and Robin L. Silverman
3CSUs Telephone Environment
4FY 09 Monthly Cost for Basic Service
- Diminishing use of phones in residence halls
- FY 10 loss of revenue 250k , but costs will be
held constant or reduced for on-campus phones. - FY 11 may lose an additional 200k.
5(No Transcript)
6FY 09 Cost Comparison with CSU Peers forBasic
Service
7FY 09 BSVM Cost Comparison with Peers
8History
- Early 80s Telephones transitioned to cost
recovery to limit to necessary installations - 1992 10-yr bond issued to pay for telephone
switch and cable plant _at_12.6 M - FY 02 03, trade telephone costs for internet
costs after paying off the telephone switch debt - Cost neutral to academic departments, savings to
non-academic departments, on average - Cost recovery ensures non-centrally funded units
pay their fair share (30)
9Strategy
- After FY 00, use Telecom reserve for the
following projects - Build the data infrastructure
- Keep the telephone switch up to date
- Purchase equipment necessary to build sustain
the data infrastructure - OTDR, fiber splicer, fiber splicing van,
trailer, - Expand and sustain the E911 infrastructure
10CUs Fiber Splicing Van
CSUs Fiber Splicing Van
11Avg. 521k
12(No Transcript)
13Campus Rewire A Very Successful Activity
- AS.12 building wires/rewires of about 200
buildings - On-campus fiber buildings, backbone
- Off-campus fiber inter-campus, WAN
- Regional optical network
- BiSON ring at Gbps (more later)
- In a cost neutral manner, the campus has been
provided - Excellent telephone service
- Excellent physical communications infrastructure
- Excellent Internet access
- While maintaining the lowest basic service costs
among all of our peers, with no additional
funding!
14Telephone Switch End of Life in 2010
- Was 2011
- Nortel into chapter 11 late January 2009
- Apparently, can now pay Nortel 30k for a
one-year extension until 2011 - Can keep operating for some time after that
- At increased risk
- But, should have
- An alternative VoIP solution in deployment
- Spare parts
15Transition to VoIP
- VoIP is the only feasible technology
- Need to upgrade and harden the data network
- Cheaper? Maybe
- An integrated, better user experience!
- Two candidate solutions being explored
- SIPX a standards-based solution
- Next-gen MS Office Communications Server
- Will select one within a year or two
- Continuing technology exploration projects
16Desirable Attributes of VoIP
- Low-cost, SIP phones anticipated lt50
- Mid-range administrative SIP phones
- Like todays Meridian phones
- Higher cost, unified communications devices
- Integrated unified communications voice, video,
instant messaging, - Presence tracks your availability
- Enhanced directory services to include multiple
means of communication/collaboration
17Networking
- Intertwined with telephone costs
- Where do we want to be in 5 years?
18Networking Policy
- Central IT/Facilities wires/rewires buildings
- Central IT deploys, operates, maintains and
secures WAN and core campus network - Has grown into an extremely complex endeavor
- IT Security, VLANs, redundancy, load balancing,
end-to-end performance, firewalls - Departmental IT staff own the LANs, and have
access to closets and network switches
19Practice
- Networks are now very capable, very complex
systems that must be carefully managed - Border router 14K lines of configuration
- Internet routing table now over 270K routes
- 3-4 times per year, departmental IT staff have
caused significant network disruptions - Misconfiguration, inexperience, etc.
- Life and safety issues exist
- Core network availability gt 99, want 99.9
20BB Pushing 1 Gbps Bandwidth Limits
21Inventory of Networking Assets
- Where are we now?
- Where should we be going over the next 5-10 years?
22- BiSON Bi-State
- Optical Network
- - CSU
- NCAR
- NOAA
- UWyo
23CSU Optical Connectivity
24Now
25Comm. Rooms/Ethernet Switches
- 380 Communications Rooms
- 670 Ethernet Switches
- 30K ports in use!!!
- 43 of switches are outdated (no longer made)
- gt 100 are more than 5 years old
- There is no refresh cycle, switches are the
responsibility of the department - All wire installed is Cat 5E or better, capable
of 1 Gbps to the wall jack - Every circuit tested for performance!
26Needed Enhancements
- VoIP Must harden the network
- Add redundancy
- Manage centrally, as an infrastructure
- Simpler, overall less expensive
- Will also improve availability
- Add Capacity Migrate backbone to 10 Gigabit
- Extend Capacity 1 Gbps to major buildings
- Requires switch upgrades
- Support Research a shared responsibility
- Accomplished via all of the above
27Why We Need Greater Capacity
- More video (inauguration, Facebook, etc.)
- HD video, videoconferencing, and audio
- Growth in research requirements
- It may take us another 10 years to complete the
next phase we should start soon
28Time for a New Cost Model
- Current model makes cost increase with capacity
- Cost limits capacity, even inside CSU
- Prohibits a sensible architecture
- Inequitable and unsustainable ?
- Propose a simpler model, based on common
infrastructure (charge per FTE/yr?) - Basic service to desk 100 Mbps
- Possible premium service 1 Gbps to desk
- Basic service to large buildings 1 Gbps
29Networking Costs
30Costs for Infrastructure Upgrade
- Hardware
- Upgrade border 250k, 25k/yr
- Upgrade core 515k, 21k/yr
- Upgrade in MDFs 1.63M, 12.5k/yr
- Upgrade IDFs 1.73M, 35k/yr
- TOTAL 4.125M, 93.5k/yr
- Add 2 networking FTE
- 100k/yr. cost neutral in steady state
- May be able to envelop these costs in telephone
charges also, some covered via network chargeback
31For Discussion Next Time
- Do we reduce basic phone service rates in 2010
and defer progress? - How far do we go?
- How fast to we go?
- How much do we risk?
- How do we decide on the above?
- We welcome an opportunity to come back for this
discussion
32Discussion
- Is this on target?
- Questions/comments?
33Appendix
- Telecom projects physical infrastructure
34Project Details Phys. Infra.
- FY 99-00
- OIS Video 142,113
- AS-12 47,000
- Clark 105,000
- FY 00-01
- Wagar 42,000
- Ayleswsorth 73,000
- Atmos Sci Sim Lab 6,313
- Weber 17,670
- UV Phase 5 15,529
- FY 01-02
- OFCHS 25,507
- CIRA 13,273
- Chem Bio 5,188
- Industrial Science 1,162
- Weber AS.12 3,000
- FY 01-02 (contd) - Fiber
- Glover 3,019
- Green Hall 2,480
- Foothills 6,615
- VTH 2,100
- Rampart/Overland 2,175
- Foothills 11,276
- NRRC 972
- NWRC 1,720
- FY 02-03
- Tunnel Project 50,007
- Gugg/Chem-Bio/VTH 1,349
- Chem Bio 2,024
- VTH 5,000
- Foothills Generator 5,383
- AS.12 Projects 299,000
35Project Details Infrastructure (contd)
- FY 03-04
- Housing 13,253
- Tunnel Project 44,288
- MRB CSUIITE 4,109
- ARBL to AIDL 11,890
- Aggie South 5,023
- AS.12 Projects 369,768
- CDOT 23,493
- Campus Fiber
- Pitkin Ave 17,540
- Centre Ave 15,917
- Aggie North 5,209
- Campus Ring 151,237
- FY 04-05
- CSU/UW fiber 185,000
- CSUIITE Projects 63,134
- CDOT 31,027
- Tunnel Project 380
- Campus Fiber
- Campus Ring 8,887
- Misc. 27,199
- FY 05-06
- AS.12 Projects 15,680
- Campus fiber
- Hughes 2,007
- Misc 116,273
36Project Details Infrastructure (contd)
- FY 06-07
- CDOT 1,420
- Campus fiber
- Misc 59,921
- 555 S. Howes 8,119
- Rampart Rd T 5,347
- N. Lateral Loop 18,795
- Pitkin Street 3,400
- 1500 UV 10,484
- FY 07-08
- CSUIITE 30,000
- CDOT 1,539
- Glover 16,828
- GSB 60,000
- FY 07-08 (contd) - fiber
- Misc Fiber Projects 55,250
- Overland Trail 47,309
- 1500 UV 43,027
- FY 08-09 (budgeted)
- CSUIITE 100,000
- Fiber Projects 150,000
- CDOT 30,000
- Adesta 215,000