1
Puget Sound AreaNorthern Intertie (PSANI)
Transmission History
  • ColumbiaGrid
  • September 24, 2007
  • Snohomish County Public Utility District
  • John D. Martinsen

2
PSANI History
  • Historical BPA Plans
  • April 2003 Curtailments
  • Meeting of the Minds
  • Current Status

3
Historical BPA Plans
  • Excerpts from the BPA 1991 2000 Transmission
    System Facilities Ten Year Development plan
  • King County System Reinforcements (second Monroe
    to Echo Lake 500kV)
  • Planned energization in 1997
  • Puget Sound Area Reinforcement (double circuit
    Chief Joseph to Monroe upgraded to 500kV tie to
    Snohomish )
  • (Planned energization in 2000)
  • Little support for new transmission during this
    period due to regulatory uncertainty NEPA 1992

4
King County System Reinforcements
  • New Monroe to Echo Lake 500kV line
  • Reinforcement is required to eliminate the heavy
    loading on the underlying 230kV system during an
    outage of the existing Monroe-Echo Lake

5
King County System Reinforcements
6
Puget Sound Area Reinforcement
  • Replace existing Chief Joseph Monroe 345kV
    double circuit lines with a 500kV double circuit
    line to Monroe and Snohomish
  • ..capacity may not be sufficient beyond 2000 if
    load growth is higher than expected or the
    Canadian Entitlement return must be delivered to
    Blaine

7
Puget Sound Area Reinforcement
8
April 2003 - Curtailments
  • April 2003 the Canadian Entitlement return
    increased from 630MW to 1,149MW
  • Curtailments and curtailment notices became a
    regular occurrence for Puget Sound utilities and
    Powerex

9
Meeting of the Minds
  • Soon after April 2003 BPA, Puget Sound utilities,
    and Powerex met
  • A short-term Redispatch was agreed to by the
    Puget Sound and Powerex parties
  • The Puget Sound Area Study Group (PSASG) was
    formed under the Northwest Power Pool (NWPP)
    Northwest Transmission Assessment Committee
    (NTAC)
  • Puget Sound Area Upgrade Study Report was
    completed by the PSASG -November 2004

10
Current Status
  • The Canadian Entitlement may increase to 1500 MW
  • Puget Sound Area loads are growing
  • Both wire and non-wire alternatives have been
    reviewed
  • Most of the major Transmission reinforcements
    reviewed would take eight to ten years to
    complete
  • Incremental upgrades and operating procedures
    have resulted in reduced curtailment risk
  • No major (i.e. 500 kV) Puget Sound area
    transmission expansion is currently moving
    forward

11
Canadian Entitlement Returns
Entitlement Capacity (MW) Entitlement Capacity (MW)
Year Returned to BC
2001-02 768
2002-03 630 then 1149
2003-04 1,154
2004-05 1,154
2005-06 1,195
2006-07 1,221
2007-08 1,217
2008-09 1,222
2009-10 1,327
2010-11 1,291
2011-12 1,289
Write a Comment