EU FP7 Preparatory Phase proposal for FAIR - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

EU FP7 Preparatory Phase proposal for FAIR

Description:

Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR JCT ... PANDA: G. Boca, Pavia, Italy. S. Tomassini, Accelerator Division at LNF, Frascati, Italy ... – PowerPoint PPT presentation

Number of Views:31
Avg rating:3.0/5.0
Slides: 9
Provided by: jrgene5
Category:

less

Transcript and Presenter's Notes

Title: EU FP7 Preparatory Phase proposal for FAIR


1
EU FP7 application for FAIR "preparatory
phase" J. Eschke, FAIR JCT
  • Resume FP6
  • Strategy for FP7 FAIR preparatory phase proposal

2
EU support for FAIR in FP6 FAIR Construction of
new Infrastructure (CNI) contract, FAIR Design
Study, I3HadronPhysics, EURONS

SIS100/SIS300
SIS18
HADES / CBM I3HadronPhysics
HESR
R3B
Super- FRS
GSI Accelerator Facilities
HADES
PANDA (I3HadronPhysics)
  • Scope of FAIR CNI (DIRAC-Phase-1)
  • FAIR injector SIS18 intensity upgrade,
  • HADES upgrade R3Bmagnet
  • EU-Support 10,4 M
  • Scope of FAIR Design Study (DIRAC-secondary-Beams)
  • ? secondary beams (RIB and Antiprotons)
  • EU-Support 9 M
  • Integrated Infrastructure Initiatives (I3)
  • I3HadronPhysics FAIR related EU-Support 10,8
    M
  • EURONS FAIR related EU-Support 2 M

R3B
NUSTAR EURONS
CR
NESR
Total EU FP6 support of 32,2 M for FAIR in
FP6 very important for the preparatory phase of
the FAIR project
3
EU FP7 Preparatory Phase proposal for FAIR
  • EU FP7 call for ESFRI roadmap projects
  • - Scope support for preparatory phase of all
    ESFRI roadmap projects
  • - Total budget of this EU call 130 M for 34
    ESFRI project
  • - Up to 7 M EU support per project -- on average
    4M
  • - Contract duration 1 4 years
  • - Deadline for submission of proposals 2 May
    2007
  • Intention and ultimate goal of this EU call
  • - "Implementation of project"
  • - Main milestone signature of construction
    agreement between partner countries
  • Main focus of proposal
  • - Work on legal, organisational (project
    management), governance, strategic and
  • financial issues (technical work only under
    certain conditions)
  • - EU funding 100 (except for technical work)
  • It is mandatory to include ministries and / or
    funding agencies as participants in the proposal

4
EU FP7 Preparatory Phase proposal for FAIR
  • Suggestion of European Commission for FAIR
    application
  • Apply for funding of FAIR Joint Core Team
    personnel and FAIR GmbH personnel
  • Duration of the contract should be two years.
    This would include also the first year of the
    FAIR GmbH until the FAIR project is successfully
    implemented

5
Draft FAIR FP7 proposal in detail
  • Funding for Joint Core Team personnel
  • 38 FTE over two years plus overhead costs
    for JCT
  • (travel, committees, consumables,...)
  • ? 6,3 M for personnel plus 0,7 M for
    overheads
  • Our suggestion
  • Funding for JCT personnel
  • 22 existing FTE at GSI, 2 existing FTE at FZ
    Jülich for HESR
  • 15 FTE from other FAIR member countries
  • names already proposed from CBM, PANDA, NUSTAR,
    SPARC and FLAIR and HESR
  • Institutions and Funding Agencies/Ministries
    become consortium members
  • Status of draft proposal
  • - Draft definition of work packages (see overview
    workpackages)
  • - Application under preparation by FAIR EU
    management team
  • (H. Bokemeyer, J. Eschke, F. Weißbach)
  • - Proposal preparation in contact with EC liaison
    officer, C. Kurrer (coordinator of PP Call)

6
Overview Work packages FAIR preparatory phase EU
proposal
7
Confirmed participation of Funding Agencies and
Ministries
  • Ministry of Science and Higher Education of
    Poland
  • INFN Italy for the Ministry of Research and
    University
  • Swedish Research Council
  • Rosatom Russia
  • BMBF Germany
  • Ministry for Research France
  • Ministry for Education Austria
  • Helsinki Institute of Physics for the Ministry of
    Education of Finland
  • Romanian National Authority for Scientific
    Research for the Ministry of Research
  • Department of Science and Technology, India

8
Nominated international members of FAIR Joint
Core Team
Link person country Z. Majka, Crakow,
Poland Link persons experiments PANDA G. Boca,
Pavia, Italy S. Tomassini,
Accelerator Division at LNF, Frascati,
Italy CBM R. Karabowicz, Crakow, Poland
D. Dutta, BARC, Mumbai and Anand Kumar Dubey,
VECC, India (1 FTE) D. Cozma and M.
Petris, NIPNE, Romania (1 FTE) S.
Belogurov, ITEP, Russia (?) NUSTAR Heikki
Penttilä, UNIVERSITY OF JYVÄSKYLÄ, Finland
W. Korten, CEA, Saclay, France
C. Mihai and T. Sava, NIPNE, Romania (1
FTE) C. Pardo, CSIC, Spain
(?) APPA (SPARC, FLAIR,..) M Czarnota,
Institute of Physics, Kielce, Poland
Brian O'Rourke,
Belfast, UK
A. Hirtl, SMI, Vienna, Austria
Link persons accelerator HESR B. Gålnander,
TSL, Uppsala, Sweden HESR D. Prasuhn, COSY,
FZ-Jülich, Germany HESR A. Lehrach, COSY,
FZ-Jülich, Germany
Write a Comment
User Comments (0)
About PowerShow.com