U'S'COEXCELL, INC' - PowerPoint PPT Presentation

1 / 48
About This Presentation
Title:

U'S'COEXCELL, INC'

Description:

U.S.COEXCELL 55-GALLON SIZE PLASTIC DRUMS ... Annual Blow Molding Conference ... CALIPER MEASUREMENT OF DIAMETER AND CONCENTRITY. PHYSICAL TEST - FREEZE-DROP ... – PowerPoint PPT presentation

Number of Views:23
Avg rating:3.0/5.0
Slides: 49
Provided by: BHUE
Category:
Tags: coexcell | inc | caliper

less

Transcript and Presenter's Notes

Title: U'S'COEXCELL, INC'


1
U.S.COEXCELL, INC.
 
HIGH-PURITY LARGE PART BLOWMOLDING
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
2
U.S.COEXCELL 55-GALLON SIZE PLASTIC DRUMS
 
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
3
CORPORATE OVERVIEW
 
  • STARTED BUSINESS 1993
  • LOCATION MAUMEE, OHIO

Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
4
U.S.COEXCELL FACILITY IN MAUMEE, OHIO
 
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
5
CORPORATE OVERVIEW
 
  • STARTED BUSINESS 1993
  • LOCATED MAUMEE, OH
  • EMPLOYMENT 40 TEAM MEMBERS

Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
6
CORPORATE OVERVIEW
 
  • STARTED BUSINESS 1993
  • LOCATED MAUMEE, OH
  • EMPLOYMENT 40 TEAM MEMBERS
  • EQUIPMENT 3 LARGE PART BLOW MOLD MACHINES,
  • MULTILAYER
    CAPABILITY.

Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
7
CROSS SECTION OF USC IC55 HDPE DRUM
 
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
8
CORPORATE OVERVIEW
 
  • STARTED BUSINESS 1993
  • LOCATED MAUMEE, OH
  • EMPLOYMENT 40 TEAM MEMBERS
  • EQUIPMENT 3 LARGE PART BLOW MOLD MACHINES,
  • MULTILAYER
    CAPABILITY.
  • PRIMARY BUSINESS MANUFACTURE AND SALE OF

  • 55-GALLON HDPE DRUMS

Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
9
CORPORATE OVERVIEW
 
  • STARTED BUSINESS 1993
  • LOCATED MAUMEE, OH
  • EMPLOYMENT 40 TEAM MEMBERS
  • EQUIPMENT 3 LARGE PART BLOW MOLD MACHINES,
  • MULTILAYER
    CAPABILITY.
  • PRIMARY BUSINESS MANUFACTURE AND SALE OF

  • 55-GALLON HDPE DRUMS
  • MARKET FOCUS SEMICONDUCTOR AND ELECTRONIC
  • CHEMICAL
    INDUSTRY

Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
10
WHATS THE DIFFERENCE BETWEEN A NORMAL CONTAINER
AND A HIGH-PURITY CONTAINER?
 
  • LOW COUNT OF FOREIGN PARTICULATES
  • REDUCED SIZE OF FOREIGN PARTICULATES
  • LOW EXRACTABLE PROPERTY OF SIDEWALL
  • STABLE LINER WALL FOR MINIMAL SHEDDING

Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
11
THE PURITY OF CHEMICALS DIRECTLY CORRELATES TO
THE PURITY AND PERFORMANCE OF THE DRUMS THESE
CHEMICALS ARE CONTAINED IN AND EXTRACTED
FROM.THIS IS PARTICULARLY CRITICAL TO THE MICRO
ELECTRONIC CHEMICAL, SEMI-CONDUCTOR, BIOMEDICAL
AND PHARMECEUTICAL INDUSTRIES.
 BUSINESS PREMISE
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
12
THINK INSIDE THE DRUM
 BUSINESS PHILOSOPHY
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
13
MARKET APPLICATION FOR HIGH-PURITY HDPE
CONTAINERS
 
MICRO ELECTRONIC CHEMICALS AND SEMICONDUCTORS
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
14
SEMICONDUCTOR WAFER MAGNIFICATION
 

Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
15
PARTICLE COUNT MEASUREMENTS
 
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
16
METALLIC EXTRACTABLE REQUIREMENTS
 
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
17
ACRONYM FOR INTEGRATED CLEAN AIR SYSTEMAN
EXCLUSIVE PROCESS INTRODUCED AND TRADEMARKED BY
U.S.COEXCELL
 

Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
18
U.S.COEXCELLSMETHODOLOGY FOR HIGH-PURITY
 
TEN CLEAN COMMANDMENTS
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
19
U.S.COEXCELLSTEN CLEAN COMMANDMENTS
 
  • COMMITMENT THAT QUALITY IS MORE IMPORTANT THAN
    QUANTITY.

Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
20
U.S.COEXCELLSTEN CLEAN COMMANDMENTS
 
2. THE IMPORTANCE OF A CLEAN CONTAINER MUST BE
UNDERSTOOD BY EVERYONE IN THE ORGANIZATION.
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
21
U.S.COEXCELLSTEN CLEAN COMMANDMENTS
 
3. SPECIALLY DESIGNED AIR-FILTRATION SYSTEM AND
MATERIALS OF CONSTRUCTION.
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
22
AIR FILTRATION AND CONDITIONING UNITS

23
U.S.COEXCELLSTEN CLEAN COMMANDMENTS
 
4. SPECIALLY FORMULATED RESIN WITH SUPERIOR
PERFORMANCE PROPERTIES .
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
24
CROSS SECTION OF CONTAINER SIDEWALL
 
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
25
U.S.COEXCELLSTEN CLEAN COMMANDMENTS
 
5. 100 VIRGIN RESIN ONLY! NO REGRIND !
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
26
55-GALLON HDPE DRUM PRIOR TO MACHINE EXIT
27
U.S.COEXCELLSTEN CLEAN COMMANDMENTS
 
  • POST-FORMING CLASS 1000 CLEAN ROOM STATION .

Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
28
CLASS 1000 CLEAN ROOM ENVIRONMENT

29
U.S.COEXCELLSTEN CLEAN COMMANDMENTS
 
7. CLEAN ROOM GARMENT PROTOCOL.
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
30
CLEAN ROOM PROTOCOL IN POST FORMING STATION

31
U.S.COEXCELLSTEN CLEAN COMMANDMENTS
 
8. SPECIAL HANDLING OF CONTAINERS AND FITTINGS.
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
32
CLASS 1000 CLEAN ROOM FOR HANDLING / ASSEMBLING
COMPONENTS
 
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
33
STORAGE AND HANDLING OF COMPONENTS
 
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
34
U.S.COEXCELLSTEN CLEAN COMMANDMENTS
 
9. STRICT ADHERENCE TO ESTABLISHED PROCESSING
PARAMETERS AS WELL AS THE EQUIPMENT MAINTENANCE
SCHEDULE.
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
35
ULTRASONIC WALL THICKNESS MEASUREMENT

36
CALIPER MEASUREMENT OF DIAMETER AND CONCENTRITY

37
PHYSICAL TEST - FREEZE-DROP

38
PHYSICAL TEST - INTERNAL PRESSURE

39
RECORD ANALYZE QC MEASUREMENT DATA
AS PART OF THE SPC SYSTEM

40
U.S.COEXCELLSTEN CLEAN COMMANDMENTS
 
10. IN-LINE PARTICLE COUNT
MONITORIZATION.
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
41
U.S.COEXCELLSTEN CLEAN COMMANDMENTS
 
IN-LINE PARTICLE COUNT MONITORIZATION
PRE-BLOW
BLOW MOLD PRESS
HANDLING STATIONS
FINAL PRODUCT
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
42
LIQUID PARTICLE COUNT MEASUREMENT

43
WATER FILTRATION EQUIPMENT STATIONED OUTSIDE
CLASS 100 CLEAN ROOM
 
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
44
INNOVATIONS IN HIGH-PURITY BLOWMOLDING
 
  • FIRST TO INTRODUCE MULTILAYER OR COEXTRUSION
    PROCESS TO LARGE PART BLOW MOLDING OF PLASTIC
    DRUMS
  • FIRST TO INCORPORATE AIR FILTRATION TECHNOLOGY
    IN THE MANUFACTURING PROCESS
  • FIRST TO ESTABLISH RESIN SPECIFICATIONS FOR A
    CLEAN CONTAINER PRODUCTION
  • FIRST TO OFFER A UNITED NATIONS-CERTIFIED DRUM
    WITH EXTRACTION TUBE
  • FIRST TO INSTALL PARTICLE MONITORING IN THE
    MANUFACTURING PROCESS
  • FIRST TO PROVIDE PARTICLE COUNT CERTIFICATION
    FOR DRUM SHIPMENTS TO CUSTOMERS

Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
45
  • PARTICLE COUNT REDUCTION OF 29 FOR
    0.2µ and 0.3µ PER CUBIC CENTIMETER

46
KEYS TO MEET THE STRINGENT HIGH-PURITY
REQUIREMENTS IN THE FUTURE
 
  • CONTINUAL PROCESS IMPROVEMENT
  • EMPLOYEE TRAINING AND AWARENESS
  • INCREASED MEASUREMENT OF PROCESS
  • REFINEMENT OF FILTRATION CAPABILITY AND
  • TECHNIQUES
  • NEXT GENERATION HDPE
  • IMPROVED PERFORMANCE OF ADDITIVE PACKAGE
    (ANTI-OXIDANTS AND STABILIZERS).
  • MODIFICATION IN PROCESS FOR GENERATING HDPE
    PELLETS
  • STABILITY OF HDPE UNDER ELEVATED HANDLING AND
    STORAGE CONDITIONS

Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
47
U.S.COEXCELL, INC.
 
HIGH-PURITY LARGE PART BLOWMOLDING
QUESTIONS AND ANSWER FORUM
Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
48
U.S.COEXCELL, INC.
 
HIGH-PURITY LARGE PART BLOWMOLDING
THANK YOU FOR YOUR TIME AND ATTENTION.

Annual Blow Molding Conference
October 10-11, 2007
Toledo, Ohio
Write a Comment
User Comments (0)
About PowerShow.com