Title: Bridge WG Status Report


1
Bridge WG Status Report
  • This presentation will probably involve audience
    discussion, which will create action items. Use
    PowerPoint to keep track of these action items
    during your presentation
  • In Slide Show, click on the right mouse button
  • Select Meeting Minder
  • Select the Action Items tab
  • Type in action items as they come up
  • Click OK to dismiss this box
  • This will automatically create an Action Item
    slide at the end of your presentation with your
    points entered.
  • David Harrington
  • Dan Romascanu

2
Agenda
  • 5 min - Administrivia
  • Blue sheets
  • Minutes
  • 5 min - Agenda bashing
  • 20 min - WG Status Report
  • 20 min - Transition mibs to IEEE 802.1 WG
  • 5 min - Administrivia

3
Status Summary
  • Personnel Issues
  • WG documents
  • Standards advancement
  • Transition mibs to IEEE 802.1 WG

4
Progress on Personnel Issues
  • WG Chair (Les Bell) unable to continue
  • New co-chairs
  • Dave Harrington
  • Dan Romascanu
  • Editors (Les, KC, Vivian) unable to continue
  • New editors to finalize documents
  • Dave Levi (Extensions, RSTP-MIB)
  • Juergen Schoenwalder (SMIv2)
  • WG lack of participation
  • Corrected mailing list and archive links in
    charter
  • Transitioning mib module responsibility to IEEE
    802.1 WG

5
Progress on Documents
  • Three years behind charter schedule
  • RFC1493 in SMIv2 due July 2001
  • Extensions (t,u,v) due August 2001
  • RSTP-MIB (1w) due August 2001
  • 802.1x MIB (unscheduled)
  • Updates needed for NITS and MIB Doctor comments
  • Request Tracking system (RT) used by chairs to
    track problems
  • Being used widely by WG chairs and MIB Doctors
  • Updated boilerplates, references, etc.
  • Updated technical concerns
  • Merged VLAN ID TCs into Extensions document
  • New work not being accepted
  • No new work until existing work completed

6
Progress on Documents
  • Documents have been finalized
  • All three republished for IETF61
  • 802.1x document dropped
  • WG Last call starting on all three documents
  • Proposed Standard status before IETF62
  • NEED REVIEWS

7
Progress on Standards Advancement
  • Behind charter schedule
  • RFC1493bis to Full Standard Sep01
  • RFC2674bis to Draft Standard Sep01
  • Need advancement discussion on mailing list
  • Need Reports
  • 2674,bis implementation
  • 1493,bis deployment

8
Progress on Transition Strategy
  • Other presentation discusses motivations and
    progress
  • Progressing as anticipated
  • No new work being accepted by Bridge WG
  • Submissions should go to IEEE 802.1 WG
  • Plan to close Bridge WG

9
Goals for Next Review
  • No planned session for IETF62 or IETF63
  • Status reports for advancement and IEEE
    transition will be done on the mailing list
  • By IETF62, status of documents should be
    finalized
  • By IETF63, reports for advancement should be
    finalized
  • By IETF64, IEEE will operate without IETF support

10
Action Items
  • WG Last Call for three documents