Title: BINP kicker design proposal for ATF2
1BINP kicker design proposal for ATF2
- Boris Grishanov, Fedor Podgorny (BINP, Russia),
Andrei Seryi (SLAC) - ATF2 Workshop
- January 5, 2004
2Background
- Extraction of ILC-like train from ATF, within the
conventional strategy, appears to be a complex
and expensive task - Realization of this task is at the limit of the
technical capabilities of the element base
available at present time - In order to solve this task and build a very
reliable system, it seems appropriate to share
the difficulties with the adjacent systems
3Difficulties of ILC train extraction
- Need to form the packet of powerful high-voltage
pulses with short rise time (1-2 ns) high rep
rate (gt 2 MHz) - Stringent requirements on time and amplitude
accuracy and stability - Absence of suitable switches
- In principle, the power-supply system can be
built on the basis of the ultra-high-speed
transistor switches produced by
however, the single power of such switches is
small - Therefore this system will be bulky, expensive,
and not sufficiently reliable - Nevertheless, there are no other more suitable
switches available
4Extraction concept
- Is based on the fact that the transverse beam
size before the extraction is very small - Therefore,
- there is no need to form the field of the kicker
in the entire geometric aperture of the vacuum
chamber - there is no need to ensure the full-aperture
throw of the beam only due to the impact of the
kicker - Taking this into account, one can significantly
simplify the extraction system and the ILC-like
train - At the same time, one could reduce the number of
kicker modules, high power switches and all the
associated elements, lowering the cost and
increasing the reliability
5Four parts of the concept
- Use low-aperture kicker located at the edge of
the vacuum chamber - Use local orbit bump which slowly drives the beam
into the kicker and closer to septum at the end
of the damping cycle before the extraction - Use two groups of kickers to halve the rep rate
of individual kickers - Even optimistically, Behlke switches could not
work with rep rate needed for ATF extraction.
Solution the ensemble of kickers will consist of
two groups moreover, the modules of kickers from
the different groups are located alternatively.
Each module is fed from its own pulsed power
supply with a repetition frequency of about 1
MHz, and the entire system works with twice
higher frequency. - Correct the drift length oscillation with RF
corrector - In this geometry the effective center of the kick
become alternately shifted for the adjacent
bunches by the length of one kicker module.
Accordingly, the drift length will oscillate for
the different bunches. If this difference exceeds
the allowed value, the situation can be mitigated
with the aid of the RF-corrector in the
extraction line (or special power supply of one
of the kickers).
6Extraction with low aperture kicker slow orbit
bump
built-in low aperture kicker
cross-section of the vacuum chamber
damping ring working aperture
7Schematics of the low-aperture kicker
Detail of the drawing low aperture kicker One of
the plates is split so that the beam could be
slowly moved into the kicker.
Ø 5 mm
1mm
Note Wakes in the 1mm gap during multi-turn
orbit bump need to be studied
8Field map in the kicker
Dimensions of the plates and of the bus are
chosen to provide 50 Ohm impedance
9Kicker pulse shape
Kicker pulse shape with fixed amplitude of the
traveling wave pulse and for various length of
the kicker (15, 20, 25, 30, 40, 60 cm).
Calculated for quasi-square pulse with 2.5ns FWHM
duration and with raise/fall (with sin2 shape)
duration of 1.5ns. This picture shows that the
length of the kicker should not be longer than
20cm.
10Two groups of kickers to double rep rate
Difference of drift length
Pair of kicker modules from neighboring groups,
for doubling the rep rate Each module works with
rep rate of about 1 MHz Angle, provided by a
single 20cm module working in the traveling wave
regime, is up to 0.5 mrad Difference in drift
length is canceled by an RF-corrector in
extraction line
11Blue and yellow kickers are working on odd and
even turns.
12Septum
- The present ATF septum has 22mm knife thickness
- Narrower (3-4mm) knife septum is possible
- It is very beneficial (or even necessary) to
rebuild the septum, to reduce the required kick
extraction chamber
main chamber
13Septum of SR source Siberia-2
- Next page shows drawings of vacuum chamber of
Siberia-2 storage ring (made by BINP for
Kurchatov Institute) near the septum magnet.
Developed by V.Kiselev, V.Korchuganov, V.Ushakov,
A.Filipchenko. Field of septum 2 ?, knife
thickness about 2.5 mm, aperture 1014 mm2,
powered by sin-half-wave with duration about 100
ms. The beam size is about 1mm, the nominal orbit
is located about 3mm from the wall of the knife.
The knife is copper with magnetic screan.
14Siberia-2 septum
15Another septum example
- Photo of septum with copper bus, knife 3mm,
aperture 84mm2, field 3 ?, powered similar as
previous.
16Kicker location optimization
- In present configuration and with 22mm septum
knife the required kick is 5mrad - That would require 20 modules gt x0.2m 4m 1m
5m which is 2-3 times longer than available
space - Optimizing the kicker location and reducing the
needed kick by modifying the septum would be
needed
17Tentative parameters
The number of modules depend on the possibility
to provide orbit correction and modify the septum
18Conclusion further work needed
- The proposed concept can make it possible to form
the ILC-like bunch train at ATF on the basis of
contemporary element base with the reasonable
cost and good reliability - Further work is needed, in particular
- Evaluation of the possibility to modify septum
- Estimate impact of wakes
- Optimize orbit correction bump
- Define needed number of kicker modules
- Detailed design of kicker module
- Prototype, test and final construction