CGRO Archive Status - PowerPoint PPT Presentation

About This Presentation
Title:

CGRO Archive Status

Description:

Final archive and SW migration effort was supported at diminishing levels through FY02. ... COMPASS system at GSFC failed after Y2K debacle. COMPTEL ... – PowerPoint PPT presentation

Number of Views:18
Avg rating:3.0/5.0
Slides: 6
Provided by: grie
Category:
Tags: cgro | archive | debacle | status

less

Transcript and Presenter's Notes

Title: CGRO Archive Status


1
CGRO Archive Status
Final Archive SW Migration Effort
  • Final archive and SW migration effort was
    supported at diminishing levels through FY02.
  • Majority of effort completed
  • Programmers released to GLAST
  • Currently, only 1/4 FTE remaining on CGRO SSC
  • Total DB volume 170 Gb


2
CGRO Archive Status
OSSE Status
  • Low-level VP data analysis system no longer
    supported
  • High-level products DB significantly enhanced
  • VP sums, low hi res XSPEC compatible spectra
    responses
  • Daily sums (most VPS), Orbital sums (22 sources)
  • Timing-mode data not archived
  • Substantial difficulty in exporting from native
    formats
  • Solar flare products (1991 X-class flares)
    pending (Mar 03)
  • GRB DB also pending (Mar 03)
  • Spectra responses for 15 in detector FoV,
    off-axis time histories


3
CGRO Archive Status
BATSE DB SW
  • Problems with daily data identified fixed
  • Pulsar DB completed
  • 55 sources, flux, freq histories, OB LCs
  • Reprocessing of trigger data pending
  • minor modifications, e.g. improves burst
    positions, quality filtering
  • SW migration essentially completed
  • bfluxhis, bcont, bcmppha, bpulsar, groview, in
    next FTOOLS release
  • FIXES made to bod2pha, bodrmf, bodgetVP
  • EOCC DB completed
  • full source histories (60 sources) archived as
    high-level product

4
CGRO Archive Status
EGRET
  • All VP data stable Reprocessed in 01 w/final
    calibrations
  • mainly effects gt GeV events at high-latitude
  • Calibration database for full mission FITS
    converted
  • SW migration completed as of last (05/02) HUG
  • Complete analysis possible under FTOOLS
  • EGRET team analysis system also updated and
    archived


5
CGRO Archive Status
COMPTEL
  • Cycle 1-8 VPs FITS converted and archived
  • COMPASS not longer supported
  • Most of Cycle 9 still pending (may fall on floor)
  • COMPASS system at GSFC failed after Y2K debacle
Write a Comment
User Comments (0)
About PowerShow.com