Description:

UPGRADE RMS/ PURCHASE MDTS. Cost $220,995 with a 5-year annual ... Remodel/Upgrade Fire ... Upgrade to the facility appearance in the neighborhood. Remodel ... – PowerPoint PPT presentation

Number of Views:46
Avg rating:3.0/5.0
Slides: 30
Provided by: keit78
Category:

less

Transcript and Presenter's Notes

Title: KANNAPOLIS FIRE DEPARTMENT


1
KANNAPOLISFIRE DEPARTMENT
COUNCIL RETREAT - 2009
2
KANNAPOLIS FIRE DEPARTMENT
3
Record Management Software including MDTs with
Automatic Vehicle Locators
  • NEED
  • PUBLIC BENEFIT
  • Existing Firehouse software is 12 years old.
  • Written on FoxPro platform.
  • Difficult interfacing with OSSI CAD SQL platform
    software.
  • MDTs provide emergency routing, hydrant
    locations, special hazards, MSDS, pre-plans, etc.
  • MDTs also permit data communication between
    apparatus, police vehicles, and dispatch.
  • If the radio system fails or dispatchers are over
    taxed due to large call volumes, apparatus and
    police vehicles could still communicate using
    MDTs.

4
Record Management Software including MDTs with
Automatic Vehicle Locators
  • ALTERNATIVE 1
  • ALTERNATIVE 2
  • NEW RMS AND MDTS
  • Cost 270,995 with a 5-year annual debt of
    65,038.
  • Could impact the general fund by 0.019 cent per
    100 of valuation for 5 years.
  • UPGRADE RMS/
  • PURCHASE MDTS.
  • Cost 220,995 with a 5-year annual debt of
    53,038.
  • Could impact the general fund by 0.016 cent per
    100 of valuation for 5 years.

5
Hazardous Material Incident Team and Equipment
  • NEED
  • PUBLIC BENEFIT
  • The nature of work at the NCRC creates a
    potential for the release of highly specialized
    bio-products that will require special training
    and resources.
  • KFD is not equipped to handle the many special
    hazards associated with a facility of this
    magnitude, let alone the risks already in place.
  • Norfolk Southern operates 58 trains per day.
  • Sidetrack used to storage/staging area for
    hazardous materials.
  • Commodity flow study from Norfolk shows large
    amounts of hazardous materials.
  • Citizens will benefit tremendously by having a
    well trained/equipped hazmat team capable of
    mitigating a hazardous release.

6
Hazardous Material Incident Team and Equipment
  • ALTERNATIVE 1
  • ALTERNATIVE 2
  • IMPLEMENT HAZMAT
  • TEAM OVER 5-YEARS.
  • Cost Debt
  • Year 1 - 170,389 - 40,893
  • Year 2 - 144,385 - 34,652
  • Year 3 - 151,703 - 36,408
  • Year 5 - 370,279 - 88,866
  • Could impact the general fund up to 0.06 cent
    per 100 of valuation for 5 years. (See notebook)
  • IMPLEMENT HAZMAT TEAM OVER 1-YEAR.
  • Cost 836,756 with a 5-year annual debt of
    200,000.
  • Could impact the general fund by 0.06 cent per
    100 of valuation for 5 years.

7
Existing Station Locations
1
2
3
4
5
8
Re-locating Station 2
1
2
3
5
4
9
Remodel/Upgrade Fire Station 2
  • NEED
  • PUBLIC BENEFIT
  • The 1,579 sq. ft. station 2 was constructed in
    1969 and has 622 sq. ft. of living area.
  • Not suitable for the gender specific staffing
    scenarios.
  • 2 FF sleep in100 sq. ft. room with the 3rd FF
    sleeping in the kitchenette.
  • Lacks fire sprinkler and alarm system and has
    limited emergency exits and insufficient
    ventilation protection.
  • Reduce overlap of station coverage.
  • Reduce response times.
  • Provides a better environment for fire personnel
    to operate in.
  • Increases opportunities for diversity within the
    FD.
  • Include Administrative office space.

10
Remodel/Upgrade Fire Station 2
  • ALTERNATIVE 1
  • ALTERNATIVE 2
  • CONSTRUCT STATION 2 ACROSS FROM PW ON BETHPAGE
    ROAD.
  • Cost 4,070,500 with a 15-year annual debt of
    378,510.
  • Could impact the general fund up to 0.11 cent
    per 100 of valuation for 15 years.
  • RESEARCH LOCATIONS FOR STATION 2 AND CONSTRUCT
    STATION 2 ON THE PROPERTY IDENTIFIED.
  • Cost 4,320,500 with a 15-year annual debt of
    401,760 .
  • Could impact the general fund by 0.12 cent per
    100 of valuation for 5 years.

11
Existing Station 3
12
Proposed Station 3
13
Remodel/Upgrade Fire Station 3
  • NEED
  • PUBLIC BENEFIT
  • Station 3 was constructed in 1972 serving the
    Royal Oaks Sanitary District and has less than
    500 sq. ft. of living area.
  • Not suitable for the gender specific staffing
    scenarios.
  • 2 FF sleep in 100 sq. ft. room with the 3rd FF
    sleeping in the kitchenette.
  • Lacks fire sprinkler and alarm system and has
    limited emergency exits and insufficient
    ventilation protection.
  • Provides a better environment for fire personnel
    to operate in.
  • Increases opportunities for diversity within the
    FD.
  • Upgrade to the facility appearance in the
    neighborhood.

14
Remodel/Upgrade Fire Station 3
  • ALTERNATIVE 1
  • ALTERNATIVE 3

ALTERNATIVE 2
  • RELOCATE STATION TO ANOTHER PARCEL IN THE SAME
    AREA.
  • Cost 3,320,000 with a 15-year annual debt of
    308,760.
  • Could impact the general fund up to 0.09 cent
    per 100 of valuation for 15 years.
  • REMODEL THE EXISTING STATION.
  • Cost 890,000 with a 15-year annual debt of
    82,770.
  • Could impact the general fund by 0.024 cent per
    100 of valuation for 5 years.
  • DEMOLISH EXISTING
  • STATION AND
  • CONSTRUCT NEW
  • STATION ON SAME
  • PROPERTY.
  • Cost 1,250,000 with a 15-year annual debt of
    116,250.
  • Could impact the general fund by 0.035 cent per
    100 of valuation for 5 years.

15
Existing Station Locations
1
2
3
4
5
16
Re-locating Station 4
1
2
3
4
5
17
Construct/Relocate Fire Station 4
  • NEED
  • PUBLIC BENEFIT
  • The 1,200 sq. ft. living area station 4 was
    constructed in 1955 serving the Winecoff area.
  • Not suitable for the gender specific staffing
    scenarios.
  • Located within the city limits of the City of
    Concord.
  • Lacks fire sprinkler and alarm system and has
    limited emergency exits and insufficient
    ventilation protection.
  • Reduce overlap of station coverage.
  • Reduce response times.
  • Provides a better environment for fire personnel
    to operate out of.
  • Increases opportunities for diversity within the
    FD.

18
Construct/Relocate Fire Station 4
  • ALTERNATIVE 1
  • ALTERNATIVE 2
  • RESEARCH PROPERTIES NEAR ORPHANAGE RD. AND
    OAKWOOD AV. AND CONSTRUCT A NEW FIRE STATION 4.
  • Cost 3,570,000 with a 15-year annual debt of
    332,010.
  • Could impact the general fund up to 0.1 cent per
    100 of valuation for 15 years.
  • RESEARCH ADDITIONAL PROPERTIES AND CONSTRUCT A
    NEW FIRE STATION 4.
  • Cost 3,570,000 with a 15-year annual debt of
    332,010.
  • Could impact the general fund by 0.1 cent per
    100 of valuation for 5 years.

19
Existing Station Locations
1
2
3
4
5
20
Adding Station 6
1
2
6
4
5
21
Construct Fire Station 6
  • NEED
  • PUBLIC BENEFIT
  • KFD does not have a fire station west of Coddle
    Creek Reservoir.
  • Calls for emergency assistance to this region are
    handled from fire station 5 located on Barr
    Road.
  • Response times to emergencies in this area exceed
    twelve minutes even with assistance from Odell.
  • The goal of the KFD to provide the same level of
    service to all citizens.
  • Citizens living west of Coddle Creek Reservoir do
    not receive the same level of service due to the
    extended response times.
  • With the new fire station, response times will be
    reduced and all citizens will receive the same
    level of emergency service.

22
Construct Fire Station 6
  • ALTERNATIVE 1
  • ALTERNATIVE 3

ALTERNATIVE 2
  • PURCHASE PROPERTY AND CONSTRUCT STATION 6 on JIM
    JOHNSON RD. NEAR HW 73.
  • Cost 3,320,000 with a 15-year annual debt of
    308,760.
  • Could impact the general fund up to 0.32 cent
    for 5 years and 0.28 cent for next 10 years.
    (includes personnel cost)
  • CONTINUE DISCUSSION WITH ODELL VFD ABOUT ADDING
    ONTO THEIR NEW STATION TO HOUSE KFD ENGINE AND
    PERSONNEL.
  • Cost 1,400,000 with a 15-year annual debt of
    130,200.
  • Could impact the general fund by 0.29 cent for 5
    years and 0.22 cent for the next 10 years.
    (includes personnel cost)
  • PURCHASE PROPERTY AND INSTALL TEMPORARY STATION
    6 ON JIM JOHNSON RD. NEAR HW 73.
  • Cost 400,000 with a 15-year annual debt of
    37,200.
  • Could impact the general fund by 0.25 cent for 5
    years and 0.19 cent for next 10 years. (includes
    personnel cost)

23
Existing Station Locations
1
2
3
4
5
24
Adding Station 7
1
7
2
3
4
5
25
Construct Fire Station 7
  • NEED
  • PUBLIC BENEFIT
  • KFD does not have a fire station in the area of
    Lane St. and I-85.
  • Calls for emergency assistance to this region are
    handled from fire station 1 located on Firehouse
    Dr.
  • Response times to emergencies in this area exceed
    eight minutes.
  • The goal of the KFD is to provide the same level
    of service to all citizens.
  • Citizens living in the area of Lane St. and I-85
    do not receive the same level of service due to
    the extended response times.
  • With the new fire station, response times will be
    reduced and all citizens will receive the same
    level of emergency service.

26
Construct Fire Station 7
  • ALTERNATIVE 1
  • ALTERNATIVE 2
  • PURCHASE PROPERTY AND CONSTRUCT STATION 7 on
    LAND ST. NEAR I-85.
  • Cost 3,370,000 with a 15-year annual debt of
    313,410 .
  • Could impact the general fund up to 0.32 cent
    for 5 years and 0.27 cent for next 10 years.
    (includes personnel cost)
  • PURCHASE PROPERTY AND INSTALL A TEMPORARY STATION
    7 on LAND ST. NEAR I-85.
  • Cost 450,000 with a 15-year annual debt of
    41,850.
  • Could impact the general fund up to 0.25 cent
    for 5 years and 0.2 cent for next 10 years.
    (includes personnel cost)

27
Existing Station Locations
1
2
3
4
5
28
All Proposed Station Locations
1
7
2
3
6
4
5
29
KANNAPOLIS FIRE DEPARTMENT
  • Questions and Answers
Write a Comment
User Comments (0)
About PowerShow.com