COUNCIL RETREAT - 2009
2KANNAPOLIS FIRE DEPARTMENT
3Record Management Software including MDTs with
Automatic Vehicle Locators
- Existing Firehouse software is 12 years old.
- Written on FoxPro platform.
- Difficult interfacing with OSSI CAD SQL platform
software.
- MDTs provide emergency routing, hydrant
locations, special hazards, MSDS, pre-plans, etc.
- MDTs also permit data communication between
apparatus, police vehicles, and dispatch. - If the radio system fails or dispatchers are over
taxed due to large call volumes, apparatus and
police vehicles could still communicate using
MDTs.
4Record Management Software including MDTs with
Automatic Vehicle Locators
- NEW RMS AND MDTS
- Cost 270,995 with a 5-year annual debt of
65,038. - Could impact the general fund by 0.019 cent per
100 of valuation for 5 years.
- UPGRADE RMS/
- PURCHASE MDTS.
- Cost 220,995 with a 5-year annual debt of
53,038. - Could impact the general fund by 0.016 cent per
100 of valuation for 5 years.
5Hazardous Material Incident Team and Equipment
- The nature of work at the NCRC creates a
potential for the release of highly specialized
bio-products that will require special training
and resources. - KFD is not equipped to handle the many special
hazards associated with a facility of this
magnitude, let alone the risks already in place.
- Norfolk Southern operates 58 trains per day.
- Sidetrack used to storage/staging area for
hazardous materials. - Commodity flow study from Norfolk shows large
amounts of hazardous materials. - Citizens will benefit tremendously by having a
well trained/equipped hazmat team capable of
mitigating a hazardous release.
6Hazardous Material Incident Team and Equipment
- IMPLEMENT HAZMAT
- TEAM OVER 5-YEARS.
- Cost Debt
- Year 1 - 170,389 - 40,893
- Year 2 - 144,385 - 34,652
- Year 3 - 151,703 - 36,408
- Year 5 - 370,279 - 88,866
-
- Could impact the general fund up to 0.06 cent
per 100 of valuation for 5 years. (See notebook)
- IMPLEMENT HAZMAT TEAM OVER 1-YEAR.
- Cost 836,756 with a 5-year annual debt of
200,000. - Could impact the general fund by 0.06 cent per
100 of valuation for 5 years.
7Existing Station Locations
1
2
3
4
5
8Re-locating Station 2
1
2
3
5
4
9Remodel/Upgrade Fire Station 2
- The 1,579 sq. ft. station 2 was constructed in
1969 and has 622 sq. ft. of living area. - Not suitable for the gender specific staffing
scenarios. - 2 FF sleep in100 sq. ft. room with the 3rd FF
sleeping in the kitchenette. - Lacks fire sprinkler and alarm system and has
limited emergency exits and insufficient
ventilation protection.
- Reduce overlap of station coverage.
- Reduce response times.
- Provides a better environment for fire personnel
to operate in. - Increases opportunities for diversity within the
FD. - Include Administrative office space.
10Remodel/Upgrade Fire Station 2
- CONSTRUCT STATION 2 ACROSS FROM PW ON BETHPAGE
ROAD. - Cost 4,070,500 with a 15-year annual debt of
378,510. - Could impact the general fund up to 0.11 cent
per 100 of valuation for 15 years.
- RESEARCH LOCATIONS FOR STATION 2 AND CONSTRUCT
STATION 2 ON THE PROPERTY IDENTIFIED. - Cost 4,320,500 with a 15-year annual debt of
401,760 . - Could impact the general fund by 0.12 cent per
100 of valuation for 5 years.
11Existing Station 3
12Proposed Station 3
13Remodel/Upgrade Fire Station 3
- Station 3 was constructed in 1972 serving the
Royal Oaks Sanitary District and has less than
500 sq. ft. of living area. - Not suitable for the gender specific staffing
scenarios. - 2 FF sleep in 100 sq. ft. room with the 3rd FF
sleeping in the kitchenette. - Lacks fire sprinkler and alarm system and has
limited emergency exits and insufficient
ventilation protection.
- Provides a better environment for fire personnel
to operate in. - Increases opportunities for diversity within the
FD. - Upgrade to the facility appearance in the
neighborhood.
14Remodel/Upgrade Fire Station 3
ALTERNATIVE 2
- RELOCATE STATION TO ANOTHER PARCEL IN THE SAME
AREA. - Cost 3,320,000 with a 15-year annual debt of
308,760. - Could impact the general fund up to 0.09 cent
per 100 of valuation for 15 years.
- REMODEL THE EXISTING STATION.
- Cost 890,000 with a 15-year annual debt of
82,770. - Could impact the general fund by 0.024 cent per
100 of valuation for 5 years.
- DEMOLISH EXISTING
- STATION AND
- CONSTRUCT NEW
- STATION ON SAME
- PROPERTY.
- Cost 1,250,000 with a 15-year annual debt of
116,250. - Could impact the general fund by 0.035 cent per
100 of valuation for 5 years.
15Existing Station Locations
1
2
3
4
5
16Re-locating Station 4
1
2
3
4
5
17Construct/Relocate Fire Station 4
- The 1,200 sq. ft. living area station 4 was
constructed in 1955 serving the Winecoff area. - Not suitable for the gender specific staffing
scenarios. - Located within the city limits of the City of
Concord. - Lacks fire sprinkler and alarm system and has
limited emergency exits and insufficient
ventilation protection.
- Reduce overlap of station coverage.
- Reduce response times.
- Provides a better environment for fire personnel
to operate out of. - Increases opportunities for diversity within the
FD.
18Construct/Relocate Fire Station 4
- RESEARCH PROPERTIES NEAR ORPHANAGE RD. AND
OAKWOOD AV. AND CONSTRUCT A NEW FIRE STATION 4. - Cost 3,570,000 with a 15-year annual debt of
332,010. - Could impact the general fund up to 0.1 cent per
100 of valuation for 15 years.
- RESEARCH ADDITIONAL PROPERTIES AND CONSTRUCT A
NEW FIRE STATION 4. - Cost 3,570,000 with a 15-year annual debt of
332,010. - Could impact the general fund by 0.1 cent per
100 of valuation for 5 years.
19Existing Station Locations
1
2
3
4
5
20Adding Station 6
1
2
6
4
5
21Construct Fire Station 6
- KFD does not have a fire station west of Coddle
Creek Reservoir. - Calls for emergency assistance to this region are
handled from fire station 5 located on Barr
Road. - Response times to emergencies in this area exceed
twelve minutes even with assistance from Odell.
- The goal of the KFD to provide the same level of
service to all citizens. - Citizens living west of Coddle Creek Reservoir do
not receive the same level of service due to the
extended response times. - With the new fire station, response times will be
reduced and all citizens will receive the same
level of emergency service.
22Construct Fire Station 6
ALTERNATIVE 2
- PURCHASE PROPERTY AND CONSTRUCT STATION 6 on JIM
JOHNSON RD. NEAR HW 73. - Cost 3,320,000 with a 15-year annual debt of
308,760. - Could impact the general fund up to 0.32 cent
for 5 years and 0.28 cent for next 10 years.
(includes personnel cost)
- CONTINUE DISCUSSION WITH ODELL VFD ABOUT ADDING
ONTO THEIR NEW STATION TO HOUSE KFD ENGINE AND
PERSONNEL. - Cost 1,400,000 with a 15-year annual debt of
130,200. - Could impact the general fund by 0.29 cent for 5
years and 0.22 cent for the next 10 years.
(includes personnel cost)
- PURCHASE PROPERTY AND INSTALL TEMPORARY STATION
6 ON JIM JOHNSON RD. NEAR HW 73. - Cost 400,000 with a 15-year annual debt of
37,200. - Could impact the general fund by 0.25 cent for 5
years and 0.19 cent for next 10 years. (includes
personnel cost)
23Existing Station Locations
1
2
3
4
5
24Adding Station 7
1
7
2
3
4
5
25Construct Fire Station 7
- KFD does not have a fire station in the area of
Lane St. and I-85. - Calls for emergency assistance to this region are
handled from fire station 1 located on Firehouse
Dr. - Response times to emergencies in this area exceed
eight minutes.
- The goal of the KFD is to provide the same level
of service to all citizens. - Citizens living in the area of Lane St. and I-85
do not receive the same level of service due to
the extended response times. - With the new fire station, response times will be
reduced and all citizens will receive the same
level of emergency service.
26Construct Fire Station 7
- PURCHASE PROPERTY AND CONSTRUCT STATION 7 on
LAND ST. NEAR I-85. - Cost 3,370,000 with a 15-year annual debt of
313,410 . - Could impact the general fund up to 0.32 cent
for 5 years and 0.27 cent for next 10 years.
(includes personnel cost)
- PURCHASE PROPERTY AND INSTALL A TEMPORARY STATION
7 on LAND ST. NEAR I-85. - Cost 450,000 with a 15-year annual debt of
41,850. - Could impact the general fund up to 0.25 cent
for 5 years and 0.2 cent for next 10 years.
(includes personnel cost)
27Existing Station Locations