Implementation WFD in Catchment Area River Ems Eems - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

Implementation WFD in Catchment Area River Ems Eems

Description:

International Ems/Eems: Need for New Organisation Dutch German ... For Ems-estuary: more than to compare, also define same methods. 27 januari 2004 ... – PowerPoint PPT presentation

Number of Views:51
Avg rating:3.0/5.0
Slides: 9
Provided by: Rijkswat
Category:

less

Transcript and Presenter's Notes

Title: Implementation WFD in Catchment Area River Ems Eems


1
Implementation WFD in Catchment Area River Ems
(Eems)
  • German-Dutch Cooperation

2
A New Directive, A New Structure
  • WFD Cooperation on Level of Catchment Area
  • International Ems/Eems Need for New Organisation
    Dutch German
  • Based Upon Organisational Structure for the Rhine
  • Involved Lower Saxony, Northern-Westphalia and
    the Netherlands

3
Catchment Area River Ems/Eems
4
Organizational Structure
5
Governments involved
  • German Federal Environmental Ministry
  • Environmental Ministries of Lower Saxony and
    Northern-Westphalia
  • Staatliches Umweltamt Münster
  • Bezirksregierung Weser-Ems
  • Dutch Ministry of Nature Protection
  • Dutch Ministry of Transport, Public Works and
    Water management
  • Project leader Nedereems (Provinz Groningen)

6
Working Procedure for Ems Catchment Area
  • Focus on Mainstream of the Ems
  • Compare National Methods for Topics Regarding WFD
  • Summarize Reports from Working Areas (begin
    February 2004)
  • 23General Description International Report
    for EC
  • Deadline First Draft 28 June 2004
  • For Ems-estuary more than to compare, also
    define same methods

7
Example of WFD Topic Heavily Modified
Waterbodies (HMW)
  • Compare Methods of Pointing HMW
  • Germany Extensive Method Based on Structure of
    Surface waters
  • Method and Data already exist
  • Netherlands First Attempt to Quantify
    Hydro-Morphological Significant Changes
  • Data Expert Judgment
  • Germany More Natural than HMW
  • Netherlands Only HMW with some Exceptions

8
Conclusions
  • WFD-Goal Regarding Catchments Area Successful
  • Period Till 2005 Useful for Mutual Understanding
  • From 2005 till 2009/2015 lots of Water through
    the Ems will be needed
Write a Comment
User Comments (0)
About PowerShow.com