ImprovementDriven Fees - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

ImprovementDriven Fees

Description:

System-wide LOS standard. Park acres/1,000 population. Road system VMC/VMT ratio ... Complex, geographic-based LOS. Master plans available. Community ... – PowerPoint PPT presentation

Number of Views:62
Avg rating:3.0/5.0
Slides: 11
Provided by: cla77
Category:

less

Transcript and Presenter's Notes

Title: ImprovementDriven Fees


1
Improvement-Driven Fees
  • National Impact Fee Roundtable
  • Arlington, VA
  • October 5, 2006

2
Session Outline
  • Clancy Mullen (15 minutes)
  • Conceptual framework
  • Randy Young (15 minutes)
  • Road impact fee example
  • Joe Colgan (15 minutes)
  • Alternative taxonomy
  • Panel Discussion (15 minutes)
  • QA (15 minutes)

3
Overview
  • Alternative Methodologies
  • Plan-Based
  • Standard-Based
  • Essential Characteristics
  • Plan Requirements in State Laws
  • Advantages and Disadvantages

4
Alternative Methodologies
  • Plan-Based (Improvements-Driven)
  • Standard-Based (Demand-Driven, Consumption-Based,
    Buy-in, Incremental Expansion)

5
Essential Characteristics of Plan-Based
Methodologies
  • Geographic LOS standard
  • All roads function at LOS D or better
  • Drainage adequate for 100-year storm
  • A park within one mile of every house
  • Minimum 5-minute fire response time
  • A 10-year to 20-year master plan
  • Growth projections for planning period
  • Improvements needed to serve growth at
    adopted/desired standard
  • Fee Total Cost divided by Growth

6
Essential Characteristics of Standard-Based
Methodologies
  • System-wide LOS standard
  • Park acres/1,000 population
  • Road system VMC/VMT ratio
  • Fire station sq. ft./dwelling unit
  • Gallons/day per single-family equivalent
  • Permanent school stations per student
  • Existing facilities cost per demand unit
  • Total cost / capacity unit cost
  • Fee unit cost x units needed

7
Comparative Typical Features
8
State Law Requirements
  • 27 states have enabling acts
  • 30 no requirements (FL, AZ, CO, WA..)
  • 20 require only a list (AR, OR, UT, WI..)
  • 50 require growth projections
  • Typical requirements
  • Growth projections
  • List of needed projects and costs
  • Only attributable share used in fee calc.
  • TX max fee growth costs/growth

9
Advantages/Disadvantages
10
When Plan-Based is Warranted
  • Complex, geographic-based LOS
  • Master plans available
  • Community approaching build-out
Write a Comment
User Comments (0)
About PowerShow.com