CoP Preparation H. Feuchtgruber - PowerPoint PPT Presentation

1 / 10
About This Presentation
Title:

CoP Preparation H. Feuchtgruber

Description:

Covers FDIR, SFT, Chopper and Grating tuning ... E:PACS ProjectCoP PlanPACS Commissioning Phase Plan PACS-ME-PL-024 issue1.2.pdf ... – PowerPoint PPT presentation

Number of Views:19
Avg rating:3.0/5.0
Slides: 11
Provided by: HelmutFeu2
Category:

less

Transcript and Presenter's Notes

Title: CoP Preparation H. Feuchtgruber


1
CoP Preparation H. Feuchtgruber
2
PACS Commissioning Phase Overview (1)
  • FDIR
  • SFT HeII
  • Chopper controller parameter tuning
  • Grating controller parameter tuning
  • Full functional test (FFT)
  • Short performance test (SPT)
  • GeGa detector tuning
  • Telescope background measurement
  • Bolometer detector tuning

3
PACS Commissioning Phase Overview (2)
  • Instrument User Manual
  • - Covers FDIR, SFT, Chopper and Grating tuning
  • ftp//ftp.mpe.mpg.de/people/pacs/PACS_User_Manua
    l/PACS-ME-UM-002_Issue_1_3_User_Manual.pdf
  • - Conceptually tested during SOVT2 real time
    commanding
  • PACS Commissioning Phase Plan
  • - PACS-ME-PL-024, issue 1.2 attachments
  • E\PACS Project\CoP Plan\PACS Commissioning
    Phase Plan PACS-ME-PL-024 issue1.2.pdf

4
Commissioning Phase Details (1)
5
Commissioning Phase Details (2)
6
CoP X-HSPOT Proposals
HF repetition of IST and TBTV
HF repetition of IST and TBTV
HF repetition of IST and TBTV
HF take a full spectrum of the early telescope
KO, MS
MS, KO
KO, TM
PR, HD
MN, UK
7
CoP X-HSPOT Proposals
Example GeGa_Bias_1
8
Analysis Uplink Feedback (1)
9
Analysis Uplink Feedback (2)
10
Analysis Uplink Feedback (3)
  • Analysis procedures for
  • FDIR, SFT HeII, FFT, SPT-SPEC and SPT-PHOT
    exercised already twice during IST (report
    available) and TBTV (report in progress).
  • A similar report will be generated based on the
    results of these
  • tests during commissioning phase.