CONSOLIDATION CPS-BL SYSTEM - PowerPoint PPT Presentation

About This Presentation
Title:

CONSOLIDATION CPS-BL SYSTEM

Description:

ISOLDE:10. PS:100(4 SECTORS) TT2:8. nTOF:1. AD:2. TOTAL BL: 164. 11/22/09. CPS_BL SYSTEM ... ACEM (Al Cathode Electron Multiplier Tube) ... – PowerPoint PPT presentation

Number of Views:21
Avg rating:3.0/5.0
Slides: 21
Provided by: virginiapr
Category:

less

Transcript and Presenter's Notes

Title: CONSOLIDATION CPS-BL SYSTEM


1
CONSOLIDATION CPS-BL SYSTEM
  • V. Prieto Hermosilla AB/BI/BL

2
OUTLINE
  • The CPS BL Monitoring system
  • Functionalities
  • Calibration (PS vs. SPS)
  • Main Problems
  • New Options LHC-IC Test on PS
  • Budget Planning

3
PS LAYOUT
PS100(4 SECTORS) TT28 nTOF1
TOTAL BL 164
AD2
Injection 6 Booster32 (2 SECTORS) Transfer10 IS
OLDE10
4
PS BEAM LOSS
  • ACEM (Al Cathode Electron Multiplier Tube)
  • Isat100mA (Average anode current)?(6.107particles
    in the ACEM/10ms)
  • Integration mode (fixed Gain)ADC
  • Integration mode Analog acquisition. (OASIS)
  • -800VltVplt-1100V
  • Video (display 8 bits) Survey (read out 12
    bits using 8MSB, every 100ms)

5
(No Transcript)
6
CALIBRATION
  • Every BL is tested in Lab. with a radioactive
    source (Cs137).We read the Idark(N) and the
    Isource(S) for several HV values. The signal
    adjustment is made for the nominal HV. If the
    ratio S/N is too large, the BL has to be changed.
  • All the calibration is done in a dedicated test
    bench, designed in collaboration with SG-RP and
    BI-ML.
  • Manpower 2 persons/6-8 weeks

CALIBRATION DATA
7
CALIBRATION (II)
Horizontal sector number Vertical normalized
units
8
CALIBRATION CPS (III)
  • About 5 of monitors has to be changed every year
    (ratio S/N under the limit).
  • 5-10 has to be relocated.
  • Loss of gain in the oldest monitors.
  • Electronics OK.
  • Malfunctioning is mainly due to monitors aging

9
MAIN PROBLEMS
  • Old system 1980.
  • Performance limited by the electronics.
  • No spares for electronics obsolete components.
  • Obsolete CAMAC Racks.
  • Every detector has to be dismantled and
    calibrated every year.
  • Non standard system different from SPS and LHC.

10
SPS (LHC) BEAM LOSS
  • Ionization Chamber
  • N2 filled
  • Vp800V (1500V)
  • SPS integration mode (Variable Gain)ADC(15 bits)
  • LHC no gain change
  • Survey

11
MEASUREMENTS(SPS)
GAIN SURVEY DONE IN 2004 AFTER MORE THAN 15 YEARS
OPERATION
Horizontal sector number Vertical normalized
units (mean 272)
12
MEASUREMENTS SPS (II)
  • Some problems (HT Cable, noise,GND) in 10 BL over
    287.
  • Only 5 IC were replaced (extraction lines, high
    radioactive places) because the gas gain changed
    (gt20 after 20 years of operation) .
  • Quite uniforms measurements in the whole SPS.
  • Electronics OK.
  • The malfunction is mainly due to network cable
    failures.

13
LHC-IC TEST ON PS
  • Two chambers installed on the S16 of the PS
    (August 2007)
  • One in parallel with the beam pipe.
  • One perpendicular to the beam pipe, on the
    magnet.
  • Data taken to compare it with the actual BL
    system (with the same electronics or directly).
  • New position needs to be decided

14
FIRST RESULTS
  • IC1IC2 (Direct measurement)

15
FIRST RESULTS
Electronics saturated
  • IC1IC2 (LHC electronics)

16
FIRST RESULTS
  • IC vs. ACEM with PS electronics
  • IC vs. ACEM (direct current)

17
BUDGET
  • Signal Cables re-used with adaptors.
  • HV Cables re-used (Main distribution changed on
    2006)
  • Electronics new
  • Detector new (LHC type)
  • Mechanics new (LHC type)
  • ESTIMATED BUDGET 250000 CHF

18
PLANNING
IF LHC ISSUES ALLOWS US, DURING 2008.
  • We are going to install and test
  • 8-16 ICs in the PS.
  • LHC Electronics and Software in the b.368.
  • The threshold comparator program and the combiner
    program needs a modification but the Technical
    specification document has to be done before the
    software modification (with ABP and OP).

AND MAYBE DURING 2009 WE CAN INSTALL A NEW BL
SYSTEM IN THE CPS.
19
SUMMARY
  • The actual system works well but
  • It is old.
  • It is not standard compared with SPS and LHC.
  • Detectors needs to be calibrated every year
  • There are not spares for electronics.
  • Electronics doesn't match detectors capabilities.
  • Not uniform within the others.
  • The test with the LHC-BL is quite encouraging.

..We have to continue to work on it.
20
That's all...thank you
Write a Comment
User Comments (0)
About PowerShow.com