Preliminary CostEffectiveness Energy Star Tier 2 Vending - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

Preliminary CostEffectiveness Energy Star Tier 2 Vending

Description:

Tier 1 is baseline for new & refurb. 12 year machine life ... Off-hour control savings shaped like Vending Miser. Northwest. Power and. Conservation ... – PowerPoint PPT presentation

Number of Views:17
Avg rating:3.0/5.0
Slides: 10
Provided by: Charli4
Category:

less

Transcript and Presenter's Notes

Title: Preliminary CostEffectiveness Energy Star Tier 2 Vending


1
Preliminary Cost-EffectivenessEnergy Star Tier
2 Vending
  • Regional Technical Forum
  • 19 September 2006

2
Preliminary Cost-EffectivenessAssumptions
  • Tier 1 is baseline for new refurb
  • 12 year machine life
  • 6 year remaining life for existing machines
  • Refurbs every 6 years
  • Life after refurb is 6 years
  • Machine savings shaped like residential
    refrigerator
  • Off-hour control savings shaped like Vending
    Miser

3
Preliminary Cost-EffectivenessCases to Consider
New Machine New Site or Replace Existing
Machine at End of Life
Savings T1 minus T2 for 12 years
Savings Add 400 kWh/year with controls enabled
Savings Exist minus T2 for 6 years plus T1
minus T2 for remaining 6 years
Early Replacement Early Replacement with New
Tier 2 Machine
Savings Add 400 kWh/year with controls enabled
Refurb Refurbish Existing with Tier 2 Kit
Savings Exist minus T2 for 3 years plus T1
minus T2 for 3 years
Savings Add 400 kWh/year with controls enabled
4
Savings Assumptions
5
Cost Assumptions
6
Results New Machines
7
Results Early Replacements with New Machines
8
Results Refurbs
9
Total Savings Potential
  • About 1 MWa per 4000 Machines
  • New 10
  • Early Replacement 40
  • Refurbish 50
  • Half with controls enabled
  • PNW Market
  • 4000 New machines per year
  • 120,000 Existing machines
Write a Comment
User Comments (0)
About PowerShow.com